STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 13:05:39 Adam Phillips
  • 2022-05-06 13:05:38 Adam Phillips
  • 2020-02-01 04:24:53 Administrator
  • 2020-02-01 04:24:52 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS

STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS

STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS
Abstract
U. S. Steel (USS) designed, constructed, and started up a new wastewater system for contaminated flushing liquor treatment at its Gary Coke Operations in Gary, Indiana. The plant was placed into operation in late 1998. It treats a wastewater flow of 250 gpm from the second largest coke plant in North America. The treatment facilities consist of oil/tar separation, equalization, steam distillation for removal of free ammonia and acid gases, and activated sludge nitrification and denitrification. After steam stripping, total nitrogen concentrations of about 3,000 mg/L are treated in the biological system. Each of the two activated sludge tanks has in Integral Clarifier and anoxic and aerobic zones to accomplish nitrification, denitrification, and secondary clarification in a single tank. Excess sludge is dewatered on a belt filter press and recycled by application to the coal used for cokemaking. This paper will review the design basis for the plant, present startup and operating experience, and summarize “lessons learned” as a result of implementing this treatment approach, which is believed to be one of the more unique and novel found in the coke by-products industry today.
U. S. Steel (USS) designed, constructed, and started up a new wastewater system for contaminated flushing liquor treatment at its Gary Coke Operations in Gary, Indiana. The plant was placed into operation in late 1998. It treats a wastewater flow of 250 gpm from the second largest coke plant in North America. The treatment facilities consist of oil/tar separation, equalization, steam distillation...
Author(s)
Sam E. ShelbyFrederick L. Maddalena
SourceProceedings of the Water Environment Federation
SubjectSession 8 - Industrial Issues and Treatment Technology Symposium: Aerobic Treatment Technology
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:14L.493;1-
DOI10.2175/193864700784607235
Volume / Issue2000 / 14
Content sourceWEFTEC
First / last page(s)493 - 516
Copyright2000
Word count200

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS
Pricing
Non-member price: $11.50
Member price:
-287133
Get access
-287133
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS
Abstract
U. S. Steel (USS) designed, constructed, and started up a new wastewater system for contaminated flushing liquor treatment at its Gary Coke Operations in Gary, Indiana. The plant was placed into operation in late 1998. It treats a wastewater flow of 250 gpm from the second largest coke plant in North America. The treatment facilities consist of oil/tar separation, equalization, steam distillation for removal of free ammonia and acid gases, and activated sludge nitrification and denitrification. After steam stripping, total nitrogen concentrations of about 3,000 mg/L are treated in the biological system. Each of the two activated sludge tanks has in Integral Clarifier and anoxic and aerobic zones to accomplish nitrification, denitrification, and secondary clarification in a single tank. Excess sludge is dewatered on a belt filter press and recycled by application to the coal used for cokemaking. This paper will review the design basis for the plant, present startup and operating experience, and summarize “lessons learned” as a result of implementing this treatment approach, which is believed to be one of the more unique and novel found in the coke by-products industry today.
U. S. Steel (USS) designed, constructed, and started up a new wastewater system for contaminated flushing liquor treatment at its Gary Coke Operations in Gary, Indiana. The plant was placed into operation in late 1998. It treats a wastewater flow of 250 gpm from the second largest coke plant in North America. The treatment facilities consist of oil/tar separation, equalization, steam distillation...
Author(s)
Sam E. ShelbyFrederick L. Maddalena
SourceProceedings of the Water Environment Federation
SubjectSession 8 - Industrial Issues and Treatment Technology Symposium: Aerobic Treatment Technology
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:14L.493;1-
DOI10.2175/193864700784607235
Volume / Issue2000 / 14
Content sourceWEFTEC
First / last page(s)493 - 516
Copyright2000
Word count200

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Sam E. Shelby# Frederick L. Maddalena. STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-287133CITANCHOR>.
Sam E. Shelby# Frederick L. Maddalena. STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-287133CITANCHOR.
Sam E. Shelby# Frederick L. Maddalena
STARTUP AND INITIAL OPERATIONS OF THE NEW COKE PLANT WASTEWATER TREATMENT SYSTEM AT USS GARY WORKS
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-287133CITANCHOR