lastID = -287440
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:19:08 Adam Phillips
  • 2022-05-04 21:19:07 Adam Phillips
  • 2020-03-26 22:19:12 Adam Phillips
  • 2020-03-26 22:19:11 Adam Phillips
  • 2020-01-31 21:35:02 Administrator
  • 2020-01-31 21:35:01 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION

CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION

CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION
Abstract
The City of Edmonton's Gold Bar Wastewater Treatment Plant (GBWWTP) is at the downstream end of a collection system servicing approximately 634,000 people plus industrial and commercial areas. The plant has a relatively flat hydraulic profile, where the effluent weir on the primary tanks is 0.23 m above the invert of the incoming conduit and the effluent weir on the secondary clarifiers is only 0.38 m below the primary tank weir.Hydraulic simulation of the collection system has proceeded on the assumption of a controlled head relationship at the headworks of the treatment plant. As work progressed on the City's Combined Sewer Overflow Strategy and a preferred method of control was to convey more flow to the GBWWTP for treatment and expand treatment capacity, the hydraulic gradeline at the inlet and the headworks of the plant became more significant as hydraulic elements. Without lowering the gradeline at the plant inlet, it was found to be difficult to achieve the objective of treating a flow rate of 1600 ML/D on a sustained basis and using this capacity without premature combined sewer overflows (CSO) upstream of the plant when the plant still had treatment capacity. These conditions made it necessary to lower the hydraulic profile at the plant and simultaneously evaluate the system flows.To understand and evaluate the hydraulic relationship between the upstream collection system and the GBWWTP a detailed hydraulic model was developed and included as part of the collection system hydraulic model. The hydraulic model was constructed in the Danish Hydraulic Institute MOUSE model using approximately 150 elements to describe the various treatment processes. This included grit tanks, screens, primary settling basins, bypasses, secondary aeration basins, secondary clarifiers, ultra violet disinfection, and outfall to the river.This paper discusses the hydraulic relationship between the collection system and the treatment plant, provides details on the structure of the treatment plant hydraulic model and the approach used to integrate the collection system and treatment plant hydraulic modeling activities to evaluate CSO Long Term Control strategies for the City.
The City of Edmonton's Gold Bar Wastewater Treatment Plant (GBWWTP) is at the downstream end of a collection system servicing approximately 634,000 people plus industrial and commercial areas. The plant has a relatively flat hydraulic profile, where the effluent weir on the primary tanks is 0.23 m above the invert of the incoming conduit and the effluent weir on the secondary clarifiers is only...
Author(s)
Philip GrayChristopher WardSteven ChanFaruk Kharadi
SourceProceedings of the Water Environment Federation
SubjectSession 8 - Modeling
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:4L.393;1-
DOI10.2175/193864700785140728
Volume / Issue2000 / 4
Content sourceCollection Systems Conference
First / last page(s)393 - 409
Copyright2000
Word count345

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION
Pricing
Non-member price: $11.50
Member price:
-287440
Get access
-287440
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION
Abstract
The City of Edmonton's Gold Bar Wastewater Treatment Plant (GBWWTP) is at the downstream end of a collection system servicing approximately 634,000 people plus industrial and commercial areas. The plant has a relatively flat hydraulic profile, where the effluent weir on the primary tanks is 0.23 m above the invert of the incoming conduit and the effluent weir on the secondary clarifiers is only 0.38 m below the primary tank weir.Hydraulic simulation of the collection system has proceeded on the assumption of a controlled head relationship at the headworks of the treatment plant. As work progressed on the City's Combined Sewer Overflow Strategy and a preferred method of control was to convey more flow to the GBWWTP for treatment and expand treatment capacity, the hydraulic gradeline at the inlet and the headworks of the plant became more significant as hydraulic elements. Without lowering the gradeline at the plant inlet, it was found to be difficult to achieve the objective of treating a flow rate of 1600 ML/D on a sustained basis and using this capacity without premature combined sewer overflows (CSO) upstream of the plant when the plant still had treatment capacity. These conditions made it necessary to lower the hydraulic profile at the plant and simultaneously evaluate the system flows.To understand and evaluate the hydraulic relationship between the upstream collection system and the GBWWTP a detailed hydraulic model was developed and included as part of the collection system hydraulic model. The hydraulic model was constructed in the Danish Hydraulic Institute MOUSE model using approximately 150 elements to describe the various treatment processes. This included grit tanks, screens, primary settling basins, bypasses, secondary aeration basins, secondary clarifiers, ultra violet disinfection, and outfall to the river.This paper discusses the hydraulic relationship between the collection system and the treatment plant, provides details on the structure of the treatment plant hydraulic model and the approach used to integrate the collection system and treatment plant hydraulic modeling activities to evaluate CSO Long Term Control strategies for the City.
The City of Edmonton's Gold Bar Wastewater Treatment Plant (GBWWTP) is at the downstream end of a collection system servicing approximately 634,000 people plus industrial and commercial areas. The plant has a relatively flat hydraulic profile, where the effluent weir on the primary tanks is 0.23 m above the invert of the incoming conduit and the effluent weir on the secondary clarifiers is only...
Author(s)
Philip GrayChristopher WardSteven ChanFaruk Kharadi
SourceProceedings of the Water Environment Federation
SubjectSession 8 - Modeling
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:4L.393;1-
DOI10.2175/193864700785140728
Volume / Issue2000 / 4
Content sourceCollection Systems Conference
First / last page(s)393 - 409
Copyright2000
Word count345

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Philip Gray# Christopher Ward# Steven Chan# Faruk Kharadi. CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Sep. 2025. <https://www.accesswater.org?id=-287440CITANCHOR>.
Philip Gray# Christopher Ward# Steven Chan# Faruk Kharadi. CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 6, 2025. https://www.accesswater.org/?id=-287440CITANCHOR.
Philip Gray# Christopher Ward# Steven Chan# Faruk Kharadi
CSO PLANNING: INTEGRATED COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT HYDRODYNAMIC SIMULATION
Access Water
Water Environment Federation
December 22, 2018
September 6, 2025
https://www.accesswater.org/?id=-287440CITANCHOR