lastID = -287717
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 13:03:41 Adam Phillips
  • 2022-05-06 13:03:40 Adam Phillips
  • 2020-02-01 00:44:28 Administrator
  • 2020-02-01 00:44:27 Administrator
  • 2020-02-01 00:44:26 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York

Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York

Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York
Abstract
The regulatory requirements at the wastewater treatment plant at the City of Glen Cove, New York will soon include a standard for total nitrogen in the effluent of 9.0 mg/L. There is a need to make the necessary arrangements to ensure compliance with the new discharge permit such as a need for a conversion to a BNR process. To achieve this standard the wastewater plant needed to be researched not only in terms of biochemical oxygen demand and ammonia-nitrogen removal, but also in terms of the changes that needed to be made to accomplish denitrification. With this in mind, a research project using advanced online monitoring techniques was initiated and the results would be compared to conventional laboratory methods and calculations, as well as mathematical modeling to ensure the future changes to the facility would maintain compliance.The study results revealed concerns pertaining to the lack of a readily biodegradable carbon source for denitrification in the influent. Respirometric results demonstrated episodes of nitrification inhibition related to an industrial source. The conclusions and plant characterizations would not have been possible with traditional laboratory sampling and analysis.
The regulatory requirements at the wastewater treatment plant at the City of Glen Cove, New York will soon include a standard for total nitrogen in the effluent of 9.0 mg/L. There is a need to make the necessary arrangements to ensure compliance with the new discharge permit such as a need for a conversion to a BNR process. To achieve this standard the wastewater plant needed to be researched not...
Author(s)
Lance K. MasonDan RyanJohn WattsMarc BingleyAndrew ShawJohn Upton
SourceProceedings of the Water Environment Federation
SubjectSession 72 - Industrial Issues and Treatment Technology: Pretreatment of Industrial Wastewater
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:7L.114;1-
DOI10.2175/193864700784547043
Volume / Issue2000 / 7
Content sourceWEFTEC
First / last page(s)114 - 122
Copyright2000
Word count202

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York
Pricing
Non-member price: $11.50
Member price:
-287717
Get access
-287717
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York
Abstract
The regulatory requirements at the wastewater treatment plant at the City of Glen Cove, New York will soon include a standard for total nitrogen in the effluent of 9.0 mg/L. There is a need to make the necessary arrangements to ensure compliance with the new discharge permit such as a need for a conversion to a BNR process. To achieve this standard the wastewater plant needed to be researched not only in terms of biochemical oxygen demand and ammonia-nitrogen removal, but also in terms of the changes that needed to be made to accomplish denitrification. With this in mind, a research project using advanced online monitoring techniques was initiated and the results would be compared to conventional laboratory methods and calculations, as well as mathematical modeling to ensure the future changes to the facility would maintain compliance.The study results revealed concerns pertaining to the lack of a readily biodegradable carbon source for denitrification in the influent. Respirometric results demonstrated episodes of nitrification inhibition related to an industrial source. The conclusions and plant characterizations would not have been possible with traditional laboratory sampling and analysis.
The regulatory requirements at the wastewater treatment plant at the City of Glen Cove, New York will soon include a standard for total nitrogen in the effluent of 9.0 mg/L. There is a need to make the necessary arrangements to ensure compliance with the new discharge permit such as a need for a conversion to a BNR process. To achieve this standard the wastewater plant needed to be researched not...
Author(s)
Lance K. MasonDan RyanJohn WattsMarc BingleyAndrew ShawJohn Upton
SourceProceedings of the Water Environment Federation
SubjectSession 72 - Industrial Issues and Treatment Technology: Pretreatment of Industrial Wastewater
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:7L.114;1-
DOI10.2175/193864700784547043
Volume / Issue2000 / 7
Content sourceWEFTEC
First / last page(s)114 - 122
Copyright2000
Word count202

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Lance K. Mason# Dan Ryan# John Watts# Marc Bingley# Andrew Shaw# John Upton. Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-287717CITANCHOR>.
Lance K. Mason# Dan Ryan# John Watts# Marc Bingley# Andrew Shaw# John Upton. Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-287717CITANCHOR.
Lance K. Mason# Dan Ryan# John Watts# Marc Bingley# Andrew Shaw# John Upton
Investigation Using Advanced On-Line Instrumentation of Industrial Loading on a Wastewater Treatment Plant in Glen Cove, New York
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-287717CITANCHOR