lastID = -287800
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 01:55:56 Administrator
  • 2020-02-01 01:55:55 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA

NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA

NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA
Abstract
This case history describes Task Order 4 South Site Improvements at the Noman M. Cole, Jr. Pollution Control Plant owned and operated by the Wastewater Treatment Division of the County of Fairfax Department of Public Works and Environmental Services. This project included a new Raw Wastewater/Equalization Tank Pump Station, a hydraulic surge tank, Flow Equalization Tank with four compartments (4MG each or 16 MG total capacity), and several thousand feet of 36”, 42” and 54” piping all of which were placed into operation in late 1998. The new Pump Station consists of three 185 hp wet pit submersible pumps which convey screened raw wastewater to the flash mix tanks/primary settling tanks and four 200 hp wet pit submersible pumps which convey primary effluent to the new Equalization Tanks for peak flow shaving when necessary. Each of the pumps is equipped with an adjustable frequency drive unit.A PLC controls the number of pumps in operation and the speed of the pumps so as to maintain preset liquid levels in the wet wells. The PLC and a diversion flow metering system control the rate of gravity flow from the primary settling tank effluent channel to the equalization pump wet well for peak shaving. The diversion flow metering system is comprised of three parallel ultrasonic flow meters each equipped with an electric butterfly valve. The system automatically controls the rate of flow to be diverted to the wet well for pumping in order not to exceed the peak process design flow to the Biological Nutrient Removal Activated Sludge Tanks. The diverted flow is pumped through a 36” pipeline to the concrete Equalization Tank which includes four 4 MG compartments. These compartments are automatically filled one at a time in sequence. When influent plant flow declines below a setpoint flow rate, the PLC will automatically drain each Equalization Tank compartment in sequence utilizing a gravity return flow system comprised of two parallel ultrasonic flow meters each equipped with an electric butterfly valve. Flow is returned by gravity through the same 36” pipeline to the primary settling tank effluent channel.Each 4 MG compartment is equipped with an innovative self cleaning ridge and furrow precast concrete bottom which concentrates the settled solids into a series of troughs called furrows. The furrows are semi-circular and slope at 4% from the end walls of each tank to the center. When each compartment is drained, settled solids are scoured down the furrows to a 1 MGD submersible washwater return pump located in the center of each compartment. A high pressure plant effluent washwater system automatically flushes the furrows clean after each compartment has been drained in sequence. Chlorine solution is also sprayed on the tank walls to prevent slime growth and control odors. The Equalization Tank design is unique in that no other mechanical equipment is located inside the tanks for aeration, mixing or solids removal. The Pump Station and Equalization Tank operation is automatically controlled by the PLC with innovative computer screen graphics which allow the plant operators to monitor system operation and make control adjustments, if necessary, on the computer screen by clicking a mouse. This facility can also be monitored from other remote work stations which are part of the plant SCADA system.
This case history describes Task Order 4 South Site Improvements at the Noman M. Cole, Jr. Pollution Control Plant owned and operated by the Wastewater Treatment Division of the County of Fairfax Department of Public Works and Environmental Services. This project included a new Raw Wastewater/Equalization Tank Pump Station, a hydraulic surge tank, Flow Equalization Tank with four compartments (4MG...
Author(s)
Jeff ChapinAllen HoggeKailash Gupta
SourceProceedings of the Water Environment Federation
SubjectSession 55 - Municipal Wastewater Treatment Symposium: Selected Topics
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:9L.385;1-
DOI10.2175/193864700784546350
Volume / Issue2000 / 9
Content sourceWEFTEC
First / last page(s)385 - 403
Copyright2000
Word count562

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA
Pricing
Non-member price: $11.50
Member price:
-287800
Get access
-287800
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA
Abstract
This case history describes Task Order 4 South Site Improvements at the Noman M. Cole, Jr. Pollution Control Plant owned and operated by the Wastewater Treatment Division of the County of Fairfax Department of Public Works and Environmental Services. This project included a new Raw Wastewater/Equalization Tank Pump Station, a hydraulic surge tank, Flow Equalization Tank with four compartments (4MG each or 16 MG total capacity), and several thousand feet of 36”, 42” and 54” piping all of which were placed into operation in late 1998. The new Pump Station consists of three 185 hp wet pit submersible pumps which convey screened raw wastewater to the flash mix tanks/primary settling tanks and four 200 hp wet pit submersible pumps which convey primary effluent to the new Equalization Tanks for peak flow shaving when necessary. Each of the pumps is equipped with an adjustable frequency drive unit.A PLC controls the number of pumps in operation and the speed of the pumps so as to maintain preset liquid levels in the wet wells. The PLC and a diversion flow metering system control the rate of gravity flow from the primary settling tank effluent channel to the equalization pump wet well for peak shaving. The diversion flow metering system is comprised of three parallel ultrasonic flow meters each equipped with an electric butterfly valve. The system automatically controls the rate of flow to be diverted to the wet well for pumping in order not to exceed the peak process design flow to the Biological Nutrient Removal Activated Sludge Tanks. The diverted flow is pumped through a 36” pipeline to the concrete Equalization Tank which includes four 4 MG compartments. These compartments are automatically filled one at a time in sequence. When influent plant flow declines below a setpoint flow rate, the PLC will automatically drain each Equalization Tank compartment in sequence utilizing a gravity return flow system comprised of two parallel ultrasonic flow meters each equipped with an electric butterfly valve. Flow is returned by gravity through the same 36” pipeline to the primary settling tank effluent channel.Each 4 MG compartment is equipped with an innovative self cleaning ridge and furrow precast concrete bottom which concentrates the settled solids into a series of troughs called furrows. The furrows are semi-circular and slope at 4% from the end walls of each tank to the center. When each compartment is drained, settled solids are scoured down the furrows to a 1 MGD submersible washwater return pump located in the center of each compartment. A high pressure plant effluent washwater system automatically flushes the furrows clean after each compartment has been drained in sequence. Chlorine solution is also sprayed on the tank walls to prevent slime growth and control odors. The Equalization Tank design is unique in that no other mechanical equipment is located inside the tanks for aeration, mixing or solids removal. The Pump Station and Equalization Tank operation is automatically controlled by the PLC with innovative computer screen graphics which allow the plant operators to monitor system operation and make control adjustments, if necessary, on the computer screen by clicking a mouse. This facility can also be monitored from other remote work stations which are part of the plant SCADA system.
This case history describes Task Order 4 South Site Improvements at the Noman M. Cole, Jr. Pollution Control Plant owned and operated by the Wastewater Treatment Division of the County of Fairfax Department of Public Works and Environmental Services. This project included a new Raw Wastewater/Equalization Tank Pump Station, a hydraulic surge tank, Flow Equalization Tank with four compartments (4MG...
Author(s)
Jeff ChapinAllen HoggeKailash Gupta
SourceProceedings of the Water Environment Federation
SubjectSession 55 - Municipal Wastewater Treatment Symposium: Selected Topics
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:9L.385;1-
DOI10.2175/193864700784546350
Volume / Issue2000 / 9
Content sourceWEFTEC
First / last page(s)385 - 403
Copyright2000
Word count562

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Jeff Chapin# Allen Hogge# Kailash Gupta. NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 31 Aug. 2025. <https://www.accesswater.org?id=-287800CITANCHOR>.
Jeff Chapin# Allen Hogge# Kailash Gupta. NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed August 31, 2025. https://www.accesswater.org/?id=-287800CITANCHOR.
Jeff Chapin# Allen Hogge# Kailash Gupta
NEW PUMP STATION AND 16 MG EQUALIZATION TANK FOR PEAK FLOW SHAVING AT THE NOMAN M. COLE, JR. POLLUTION CONTROL PLANT FAIRFAX COUNTY, VIRGINIA
Access Water
Water Environment Federation
December 22, 2018
August 31, 2025
https://www.accesswater.org/?id=-287800CITANCHOR