DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 18:32:58 Adam Phillips
  • 2022-05-06 18:32:57 Adam Phillips
  • 2020-01-31 21:44:45 Administrator
  • 2020-01-31 21:44:44 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE

DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE

DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE
Abstract
Clayton County Water Authority (CCWA), Clayton County, Georgia, is currently upgrading the Shoal Creek Water Reclamation Facility (WRF) from its existing capacity of 1.2 million gallons per day (mgd) to 4.4 mgd. As part of the upgrade, existing effluent treatment capacity will be expanded with construction of surface flow treatment wetlands at the Inman Road site and pumped discharge to the upstream portion of the Shoal Creek Reservoir. The treatment wetlands will provide additional polishing of the pretreated effluent from the Shoal Creek WRF to a tertiary level prior to surface discharge.Constructed treatment wetlands are effective in providing advanced polishing of municipal effluents and in protecting downstream surface water resources. CCWA's use of natural wetland treatment system technologies will work well in combination with its existing land application systems (LAS). To construct treatment wetlands for additional effluent management capacity, CCWA acquired the 360-acre Inman Road site, which is located south of the Shoal Creek Land Application System (LAS) site. This site is heavily forested with mixed pines and hardwoods in upland hilly areas and hardwood bottomland forest species growing in the floodplain of the Flint River. There are approximately 225 acres of uplands. Elevations range from 880 to 780 feet in the wetland construction area.The onsite topography makes it impossible to construct large, continuous wetland cells. Therefore, a terraced multi-cell configuration was designed, with construction requiring a large volume of soil to be excavated and leveled. Approximately 550,000 cubic yards of earth material will be moved to construct the wetland cells. The layout allows for 3 different flow paths through the terraced cells. The layout uses the natural sloping topography of the site to allow gravity flow of water from the wetland cells down to a collection point where a pump station will be constructed to discharge the treated water to the Shoal Creek Reservoir. Flow from the Shoal Creek Reservoir empties into the J.W. Smith Reservoir where an intake is located for a CCWA potable water plant.Design Development Documents for construction of the wetlands were completed in April 2001. Construction bids from 4 potential contractors ranged from 4.92 to 5.44 million. The engineer construction estimate was 5.49 million. Construction is expected to begin in the fall of 2001.
Clayton County Water Authority (CCWA), Clayton County, Georgia, is currently upgrading the Shoal Creek Water Reclamation Facility (WRF) from its existing capacity of 1.2 million gallons per day (mgd) to 4.4 mgd. As part of the upgrade, existing effluent treatment capacity will be expanded with construction of surface flow treatment wetlands at the Inman Road site and pumped discharge to the...
Author(s)
Brad L. InmanMike ThomasRobert L. Knight
SourceProceedings of the Water Environment Federation
SubjectSession 52 - Small and Natural Systems and Water Reuse: Small Communities
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:11L.99;1-
DOI10.2175/193864701790860326
Volume / Issue2001 / 11
Content sourceWEFTEC
First / last page(s)99 - 114
Copyright2001
Word count380

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE
Pricing
Non-member price: $11.50
Member price:
-287961
Get access
-287961
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE
Abstract
Clayton County Water Authority (CCWA), Clayton County, Georgia, is currently upgrading the Shoal Creek Water Reclamation Facility (WRF) from its existing capacity of 1.2 million gallons per day (mgd) to 4.4 mgd. As part of the upgrade, existing effluent treatment capacity will be expanded with construction of surface flow treatment wetlands at the Inman Road site and pumped discharge to the upstream portion of the Shoal Creek Reservoir. The treatment wetlands will provide additional polishing of the pretreated effluent from the Shoal Creek WRF to a tertiary level prior to surface discharge.Constructed treatment wetlands are effective in providing advanced polishing of municipal effluents and in protecting downstream surface water resources. CCWA's use of natural wetland treatment system technologies will work well in combination with its existing land application systems (LAS). To construct treatment wetlands for additional effluent management capacity, CCWA acquired the 360-acre Inman Road site, which is located south of the Shoal Creek Land Application System (LAS) site. This site is heavily forested with mixed pines and hardwoods in upland hilly areas and hardwood bottomland forest species growing in the floodplain of the Flint River. There are approximately 225 acres of uplands. Elevations range from 880 to 780 feet in the wetland construction area.The onsite topography makes it impossible to construct large, continuous wetland cells. Therefore, a terraced multi-cell configuration was designed, with construction requiring a large volume of soil to be excavated and leveled. Approximately 550,000 cubic yards of earth material will be moved to construct the wetland cells. The layout allows for 3 different flow paths through the terraced cells. The layout uses the natural sloping topography of the site to allow gravity flow of water from the wetland cells down to a collection point where a pump station will be constructed to discharge the treated water to the Shoal Creek Reservoir. Flow from the Shoal Creek Reservoir empties into the J.W. Smith Reservoir where an intake is located for a CCWA potable water plant.Design Development Documents for construction of the wetlands were completed in April 2001. Construction bids from 4 potential contractors ranged from 4.92 to 5.44 million. The engineer construction estimate was 5.49 million. Construction is expected to begin in the fall of 2001.
Clayton County Water Authority (CCWA), Clayton County, Georgia, is currently upgrading the Shoal Creek Water Reclamation Facility (WRF) from its existing capacity of 1.2 million gallons per day (mgd) to 4.4 mgd. As part of the upgrade, existing effluent treatment capacity will be expanded with construction of surface flow treatment wetlands at the Inman Road site and pumped discharge to the...
Author(s)
Brad L. InmanMike ThomasRobert L. Knight
SourceProceedings of the Water Environment Federation
SubjectSession 52 - Small and Natural Systems and Water Reuse: Small Communities
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:11L.99;1-
DOI10.2175/193864701790860326
Volume / Issue2001 / 11
Content sourceWEFTEC
First / last page(s)99 - 114
Copyright2001
Word count380

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Brad L. Inman# Mike Thomas# Robert L. Knight. DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 15 Oct. 2025. <https://www.accesswater.org?id=-287961CITANCHOR>.
Brad L. Inman# Mike Thomas# Robert L. Knight. DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 15, 2025. https://www.accesswater.org/?id=-287961CITANCHOR.
Brad L. Inman# Mike Thomas# Robert L. Knight
DESIGN AND CONSTRUCTION OF TREATMENT WETLANDS ON A SLOPING SITE
Access Water
Water Environment Federation
December 22, 2018