lastID = -288099
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 00:34:14 Administrator
  • 2020-02-01 00:34:13 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY

INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY

INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY
Abstract
The Sha Tin Sewage Treatment Works (STW) is regarded as the largest biological STW in Hong Kong. The existing Stage I/II is currently a 150,000 m3/day 4/5-stage Bardenpho process for biological nitrogen (N) and phosphorus removal. This capacity was much reduced from the original design capacity (conventional process) of 205,000 m3/day, which must be restored to 205,000 m3/day (ADWF) in the near future. A much more volume-efficient Modified Ludzack-Ettinger (MLE) process configuration with bioselector for biological N removal only is selected to meet the more stringent effluent NH4-N standard of < 5 mg/L. Only the existing aeration tank and secondary clarifier hydraulic volumes could be used because of the severe space constraints for the predicted near-term growth in the catchment area.In order to utilise the existing civil structures in a highly efficient, and perhaps innovative, manner, the design and operation of both the MLE process bio-selector and the 30 year-old secondary clarifiers must be integrated. A five-month bench-scale study was conducted to assess the inhibitory effects of the high and variable saline concentration on the biological nitrification-denitrification capacities. The high salinity levels result from seawater toilet flushing (up to 33% of the influent). It was demonstrated that the selected MLE process could meet the required design requirements with a spare 33% extra capacity despite inhibition of up to 20% on the nitrification rates. The effect of the bio-selector and the plug-flow configuration on control of foaming by nocardioforms and low F/M bulking was also verified. However, the existing secondary clarifier with or without modifications for improved hydraulics (centre feed well optimization and Crosby baffle), as indicated from the computer hydraulic modelling, could not meet the design requirements. This led to the reduction of the un-aerated mass fraction of the MLE system from 33% to 25%.A combination of physical and computer modelling was demonstrated to be a valuable aid. The bench-scale (or pilot-scale) physical model can predict the design kinetic parameters and determine the characteristics of the complex microbial community that consumes pollutants, performs nitrification-denitrification, forms flocs for solids-liquid separation, and causes bulking and foaming when overgrowth of the filamentous bacteria occurs. Computer modelling of the biological process and secondary clarifier allowed the performance to be predicted accurately for conditions either not tested or impossible to obtain.Without these integrated considerations, the design and operation may not have been focussed on both the un-aerated configuration of the MLE process and the capacity improvement of the secondary clarifiers. A large un-aerated mass fraction and a conservative estimate of the maximum growth rate of the nitrifiers would have been used, resulting in an unnecessarily long sludge age and high operating MLSS concentration. The secondary clarifier capacity, as indicated by the overflow rate, would have been assumed in order to meet the required capacity. The actual result would have been a nonoptimal system resulting in an unnecessary capital investment and construction duration for larger or more efficient secondary clarifier volumes.
The Sha Tin Sewage Treatment Works (STW) is regarded as the largest biological STW in Hong Kong. The existing Stage I/II is currently a 150,000 m3/day 4/5-stage Bardenpho process for biological nitrogen (N) and phosphorus removal. This capacity was much reduced from the original design capacity (conventional process) of 205,000 m3/day, which must be restored to 205,000 m3/day (ADWF) in the near...
Author(s)
S.M. YuW.Y. LeungK.M. HoH. GergesP.F. GreenfieldJ.L. BarnardW.W. Eckenfelder
SourceProceedings of the Water Environment Federation
SubjectSession 23 - Municipal Wastewater Treatment Process Symposium: Biological Nutrient Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:14L.371;1-
DOI10.2175/193864701802779422
Volume / Issue2001 / 14
Content sourceWEFTEC
First / last page(s)371 - 387
Copyright2001
Word count500

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY
Pricing
Non-member price: $11.50
Member price:
-288099
Get access
-288099
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY
Abstract
The Sha Tin Sewage Treatment Works (STW) is regarded as the largest biological STW in Hong Kong. The existing Stage I/II is currently a 150,000 m3/day 4/5-stage Bardenpho process for biological nitrogen (N) and phosphorus removal. This capacity was much reduced from the original design capacity (conventional process) of 205,000 m3/day, which must be restored to 205,000 m3/day (ADWF) in the near future. A much more volume-efficient Modified Ludzack-Ettinger (MLE) process configuration with bioselector for biological N removal only is selected to meet the more stringent effluent NH4-N standard of < 5 mg/L. Only the existing aeration tank and secondary clarifier hydraulic volumes could be used because of the severe space constraints for the predicted near-term growth in the catchment area.In order to utilise the existing civil structures in a highly efficient, and perhaps innovative, manner, the design and operation of both the MLE process bio-selector and the 30 year-old secondary clarifiers must be integrated. A five-month bench-scale study was conducted to assess the inhibitory effects of the high and variable saline concentration on the biological nitrification-denitrification capacities. The high salinity levels result from seawater toilet flushing (up to 33% of the influent). It was demonstrated that the selected MLE process could meet the required design requirements with a spare 33% extra capacity despite inhibition of up to 20% on the nitrification rates. The effect of the bio-selector and the plug-flow configuration on control of foaming by nocardioforms and low F/M bulking was also verified. However, the existing secondary clarifier with or without modifications for improved hydraulics (centre feed well optimization and Crosby baffle), as indicated from the computer hydraulic modelling, could not meet the design requirements. This led to the reduction of the un-aerated mass fraction of the MLE system from 33% to 25%.A combination of physical and computer modelling was demonstrated to be a valuable aid. The bench-scale (or pilot-scale) physical model can predict the design kinetic parameters and determine the characteristics of the complex microbial community that consumes pollutants, performs nitrification-denitrification, forms flocs for solids-liquid separation, and causes bulking and foaming when overgrowth of the filamentous bacteria occurs. Computer modelling of the biological process and secondary clarifier allowed the performance to be predicted accurately for conditions either not tested or impossible to obtain.Without these integrated considerations, the design and operation may not have been focussed on both the un-aerated configuration of the MLE process and the capacity improvement of the secondary clarifiers. A large un-aerated mass fraction and a conservative estimate of the maximum growth rate of the nitrifiers would have been used, resulting in an unnecessarily long sludge age and high operating MLSS concentration. The secondary clarifier capacity, as indicated by the overflow rate, would have been assumed in order to meet the required capacity. The actual result would have been a nonoptimal system resulting in an unnecessary capital investment and construction duration for larger or more efficient secondary clarifier volumes.
The Sha Tin Sewage Treatment Works (STW) is regarded as the largest biological STW in Hong Kong. The existing Stage I/II is currently a 150,000 m3/day 4/5-stage Bardenpho process for biological nitrogen (N) and phosphorus removal. This capacity was much reduced from the original design capacity (conventional process) of 205,000 m3/day, which must be restored to 205,000 m3/day (ADWF) in the near...
Author(s)
S.M. YuW.Y. LeungK.M. HoH. GergesP.F. GreenfieldJ.L. BarnardW.W. Eckenfelder
SourceProceedings of the Water Environment Federation
SubjectSession 23 - Municipal Wastewater Treatment Process Symposium: Biological Nutrient Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:14L.371;1-
DOI10.2175/193864701802779422
Volume / Issue2001 / 14
Content sourceWEFTEC
First / last page(s)371 - 387
Copyright2001
Word count500

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
S.M. Yu# W.Y. Leung# K.M. Ho# H. Gerges# P.F. Greenfield# J.L. Barnard# W.W. Eckenfelder. INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 8 Jun. 2025. <https://www.accesswater.org?id=-288099CITANCHOR>.
S.M. Yu# W.Y. Leung# K.M. Ho# H. Gerges# P.F. Greenfield# J.L. Barnard# W.W. Eckenfelder. INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 8, 2025. https://www.accesswater.org/?id=-288099CITANCHOR.
S.M. Yu# W.Y. Leung# K.M. Ho# H. Gerges# P.F. Greenfield# J.L. Barnard# W.W. Eckenfelder
INTEGRATED DESIGN OF SECONDARY CLARIFIER AND BIOLOGICAL NITROGEN REMOVAL PROCESS CONFIGURATION FOR MAXIMUM TREATMENT CAPACITY
Access Water
Water Environment Federation
December 22, 2018
June 8, 2025
https://www.accesswater.org/?id=-288099CITANCHOR