lastID = -288595
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Real Time CSO Control in Philadelphia — A Real Balancing Act
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:40:15 Adam Phillips
  • 2020-02-01 03:32:06 Administrator
  • 2020-02-01 03:32:05 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Real Time CSO Control in Philadelphia — A Real Balancing Act

Real Time CSO Control in Philadelphia — A Real Balancing Act

Real Time CSO Control in Philadelphia — A Real Balancing Act

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Real Time CSO Control in Philadelphia — A Real Balancing Act
Abstract
In accordance with its NPDES permits, the City of Philadelphia Water Department (PWD) is conducting a comprehensive Combined Sewer Overflow (CSO) Compliance Program. As part of its Long Term Control Plan (LTCP), the Philadelphia Water Department (PWD) is implementing a number of technology-based capital improvement projects to further increase its ability to store and treat combined sewer flow, decrease CSO volumes, improve receiving water quality, and eliminate flooding due to surcharging. As part of the implementation of the LTCP, PWD has completed a facility plan for the implementation of a Real Time CSO Control system for its Southwest Drainage District. The implemented RTC system provides the capability to prioritize capture of combined flow in the collection system, to minimize overflows to sensitive receiving streams, and to optimize the use of available interceptor sewer-system storage during wet weather. The project had the following phases:Development of a public domain RTC modeling framework using the Extended Transport Block (EXTRAN) of the US EPA Stormwater Management Model (SWMM).Facility plan development including evaluation of CSO reduction alternatives, conceptual design plans for the proposed RTC facilities, and specifications for the RTC Center.Development of a Decision Support System (DSS) to integrate RTC with enhancements to the overall collection system management capabilities.This paper will focus on phase 2. After development and testing of a dynamic link library (.dll) module of the EXTRAN executable the model was used to analyze various alternatives for addressing the following alternatives:SWMM model simulations were performed to quantify the benefits of RTC implementation in PWD's SWDD. Model analyses were performed for single-event and continuous simulations using a multiple rain gage network to document the differences in these two characterizations of expected average annual reductions in CSO volumes due to RTC.The selected RTC strategy relies on systems and facilities throughout the SWDD. These facilities can be separated into three groups: 1) Collector system facilities, 2) The Fox Street Central Control Facility, and 3) The Southwest Water Pollution Control Plant (SWWPCP) RTC station. The primary objective of the SWDD RTC Project is to minimize CSO discharges to the Cobbs Creek. This objective is achieved by prioritizing capture of combined flows in the Cobbs Creek High Level (CCHL) intercepting system. A second objective of the RTC Project is to reduce or maintain existing CSO discharge volumes in the SWDD.
In accordance with its NPDES permits, the City of Philadelphia Water Department (PWD) is conducting a comprehensive Combined Sewer Overflow (CSO) Compliance Program. As part of its Long Term Control Plan (LTCP), the Philadelphia Water Department (PWD) is implementing a number of technology-based capital improvement projects to further increase its ability to store and treat combined sewer flow,...
Author(s)
Brian G. MarengoCello VitasovicEdward SpeerEdward Burgess
SourceProceedings of the Water Environment Federation
SubjectSession 83 - Collection Systems Symposium: The Real Time Experience
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:8L.152;1-
DOI10.2175/193864701790861686
Volume / Issue2001 / 8
Content sourceWEFTEC
First / last page(s)152 - 152
Copyright2001
Word count396

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Real Time CSO Control in Philadelphia — A Real Balancing Act'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Real Time CSO Control in Philadelphia — A Real Balancing Act
Pricing
Non-member price: $11.50
Member price:
-288595
Get access
-288595
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Real Time CSO Control in Philadelphia — A Real Balancing Act'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Real Time CSO Control in Philadelphia — A Real Balancing Act
Abstract
In accordance with its NPDES permits, the City of Philadelphia Water Department (PWD) is conducting a comprehensive Combined Sewer Overflow (CSO) Compliance Program. As part of its Long Term Control Plan (LTCP), the Philadelphia Water Department (PWD) is implementing a number of technology-based capital improvement projects to further increase its ability to store and treat combined sewer flow, decrease CSO volumes, improve receiving water quality, and eliminate flooding due to surcharging. As part of the implementation of the LTCP, PWD has completed a facility plan for the implementation of a Real Time CSO Control system for its Southwest Drainage District. The implemented RTC system provides the capability to prioritize capture of combined flow in the collection system, to minimize overflows to sensitive receiving streams, and to optimize the use of available interceptor sewer-system storage during wet weather. The project had the following phases:Development of a public domain RTC modeling framework using the Extended Transport Block (EXTRAN) of the US EPA Stormwater Management Model (SWMM).Facility plan development including evaluation of CSO reduction alternatives, conceptual design plans for the proposed RTC facilities, and specifications for the RTC Center.Development of a Decision Support System (DSS) to integrate RTC with enhancements to the overall collection system management capabilities.This paper will focus on phase 2. After development and testing of a dynamic link library (.dll) module of the EXTRAN executable the model was used to analyze various alternatives for addressing the following alternatives:SWMM model simulations were performed to quantify the benefits of RTC implementation in PWD's SWDD. Model analyses were performed for single-event and continuous simulations using a multiple rain gage network to document the differences in these two characterizations of expected average annual reductions in CSO volumes due to RTC.The selected RTC strategy relies on systems and facilities throughout the SWDD. These facilities can be separated into three groups: 1) Collector system facilities, 2) The Fox Street Central Control Facility, and 3) The Southwest Water Pollution Control Plant (SWWPCP) RTC station. The primary objective of the SWDD RTC Project is to minimize CSO discharges to the Cobbs Creek. This objective is achieved by prioritizing capture of combined flows in the Cobbs Creek High Level (CCHL) intercepting system. A second objective of the RTC Project is to reduce or maintain existing CSO discharge volumes in the SWDD.
In accordance with its NPDES permits, the City of Philadelphia Water Department (PWD) is conducting a comprehensive Combined Sewer Overflow (CSO) Compliance Program. As part of its Long Term Control Plan (LTCP), the Philadelphia Water Department (PWD) is implementing a number of technology-based capital improvement projects to further increase its ability to store and treat combined sewer flow,...
Author(s)
Brian G. MarengoCello VitasovicEdward SpeerEdward Burgess
SourceProceedings of the Water Environment Federation
SubjectSession 83 - Collection Systems Symposium: The Real Time Experience
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:8L.152;1-
DOI10.2175/193864701790861686
Volume / Issue2001 / 8
Content sourceWEFTEC
First / last page(s)152 - 152
Copyright2001
Word count396

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Brian G. Marengo# Cello Vitasovic# Edward Speer# Edward Burgess. Real Time CSO Control in Philadelphia — A Real Balancing Act. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-288595CITANCHOR>.
Brian G. Marengo# Cello Vitasovic# Edward Speer# Edward Burgess. Real Time CSO Control in Philadelphia — A Real Balancing Act. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-288595CITANCHOR.
Brian G. Marengo# Cello Vitasovic# Edward Speer# Edward Burgess
Real Time CSO Control in Philadelphia — A Real Balancing Act
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-288595CITANCHOR