lastID = -289016
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:27:52 Adam Phillips
  • 2020-02-01 04:03:44 Administrator
  • 2020-02-01 04:03:43 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA

SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA

SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA
Abstract
The City of West Lafayette, Indiana (City), faced with the challenge of reducing combined sewer overflow (CSO) to the Wabash River, addressed future CSO control regulations by developing the West Lafayette Wastewater Treatment Plant Facilities Plan in 1993. In 1996, the City prepared Amendment No.1 to the facilities plan presenting various wastewater collection system improvements including the Wet Weather Treatment Facility. The facility, located adjacent to the wastewater treatment plant, would provide settleable solids removal and disinfection of flows in excess of the plant capacity. Partnering with the City of West Lafayette, Malcolm Pirnie, Inc. evaluated alternatives and designed the facility.The alternative initially recommended for CSO treatment was comprised of four vortex separators and chemical disinfection. During preliminary design of the Wet Weather Treatment Facility, performance was discussed with representatives of two major vortex separator manufacturers. Based upon the units installed to date, the performance of vortex separators has been much less than initially expected. In fact, the data indicate that a vortex separator can be expected to achieve no more than ten percent net solids removal. This low removal rate led to the evaluation of other alternatives.A rectangular basin was evaluated and compared to the vortex separators' solids removal, volume, disinfection contact time and cost. One basin of almost double the volume of four vortex separators could be constructed at approximately the same capital cost. The rectangular basin would provide 20 minutes of chlorine contact time at the design flow whereas four vortex separators provide 10 minutes. It also is anticipated that the rectangular basin would provide more solids removal than the vortex separators. Additionally, the rectangular basin would be capable of capturing a greater volume of overflow resulting from small storms, thereby providing treatment for a greater number of storm events. Based upon these benefits, the City proposed construction of a rectangular basin for treatment of excess wet weather flow.
The City of West Lafayette, Indiana (City), faced with the challenge of reducing combined sewer overflow (CSO) to the Wabash River, addressed future CSO control regulations by developing the West Lafayette Wastewater Treatment Plant Facilities Plan in 1993. In 1996, the City prepared Amendment No.1 to the facilities plan presenting various wastewater collection system improvements including the...
Author(s)
Amanda E. RickardMichael J. Darter
SourceProceedings of the Water Environment Federation
SubjectSession 28 - Collection Systems Symposium: Combined Sewer Overflows
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:15L.712;1-
DOI10.2175/193864702784247666
Volume / Issue2002 / 15
Content sourceWEFTEC
First / last page(s)712 - 725
Copyright2002
Word count327

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA
Pricing
Non-member price: $11.50
Member price:
-289016
Get access
-289016
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA
Abstract
The City of West Lafayette, Indiana (City), faced with the challenge of reducing combined sewer overflow (CSO) to the Wabash River, addressed future CSO control regulations by developing the West Lafayette Wastewater Treatment Plant Facilities Plan in 1993. In 1996, the City prepared Amendment No.1 to the facilities plan presenting various wastewater collection system improvements including the Wet Weather Treatment Facility. The facility, located adjacent to the wastewater treatment plant, would provide settleable solids removal and disinfection of flows in excess of the plant capacity. Partnering with the City of West Lafayette, Malcolm Pirnie, Inc. evaluated alternatives and designed the facility.The alternative initially recommended for CSO treatment was comprised of four vortex separators and chemical disinfection. During preliminary design of the Wet Weather Treatment Facility, performance was discussed with representatives of two major vortex separator manufacturers. Based upon the units installed to date, the performance of vortex separators has been much less than initially expected. In fact, the data indicate that a vortex separator can be expected to achieve no more than ten percent net solids removal. This low removal rate led to the evaluation of other alternatives.A rectangular basin was evaluated and compared to the vortex separators' solids removal, volume, disinfection contact time and cost. One basin of almost double the volume of four vortex separators could be constructed at approximately the same capital cost. The rectangular basin would provide 20 minutes of chlorine contact time at the design flow whereas four vortex separators provide 10 minutes. It also is anticipated that the rectangular basin would provide more solids removal than the vortex separators. Additionally, the rectangular basin would be capable of capturing a greater volume of overflow resulting from small storms, thereby providing treatment for a greater number of storm events. Based upon these benefits, the City proposed construction of a rectangular basin for treatment of excess wet weather flow.
The City of West Lafayette, Indiana (City), faced with the challenge of reducing combined sewer overflow (CSO) to the Wabash River, addressed future CSO control regulations by developing the West Lafayette Wastewater Treatment Plant Facilities Plan in 1993. In 1996, the City prepared Amendment No.1 to the facilities plan presenting various wastewater collection system improvements including the...
Author(s)
Amanda E. RickardMichael J. Darter
SourceProceedings of the Water Environment Federation
SubjectSession 28 - Collection Systems Symposium: Combined Sewer Overflows
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:15L.712;1-
DOI10.2175/193864702784247666
Volume / Issue2002 / 15
Content sourceWEFTEC
First / last page(s)712 - 725
Copyright2002
Word count327

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Amanda E. Rickard# Michael J. Darter. SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 12 Jun. 2025. <https://www.accesswater.org?id=-289016CITANCHOR>.
Amanda E. Rickard# Michael J. Darter. SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 12, 2025. https://www.accesswater.org/?id=-289016CITANCHOR.
Amanda E. Rickard# Michael J. Darter
SELECTION OF RECTANGULAR BASIN OVER VORTEX SEPARATORS: CSO TREATMENT ALTERNATIVES FOR WEST LAFAYETTE, INDIANA
Access Water
Water Environment Federation
December 22, 2018
June 12, 2025
https://www.accesswater.org/?id=-289016CITANCHOR