lastID = -289111
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 00:03:39 Administrator
  • 2020-02-01 00:03:38 Administrator
  • 2020-02-01 00:03:37 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES

IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES

IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES
Abstract
Wastewater treatment plants across the United States are faced with increasingly more stringent discharge limitations on phosphorus and nitrogen. These facilities are now challenged to find an economical means to upgrade treatment in order to meet new limitations. The reasons for these limitations are numerous and include issues such as eutrophication in water bodies such as Chesapeake Bay, Long Island Sound and the Gulf of Mexico particularly at the discharge of the Mississippi River, implementation of TMDLs, water reservoir protection from nutrient overload, and reuse regulations which protect groundwater from nitrate contamination. Many wastewater treatment plants, particularly those in the coastal regions, were originally built as carbonaceous removal activated sludge plants. Implementing nutrient control at these plants normally implies significant aeration basin expansion to achieve the sludge age required for nitrification.In addition to the need for capacity expansion, the City and County of Broomfield Colorado was challenged with pending nutrient limitations. A study of potential options revealed that implementation of a hybrid system through conversion of the existing aeration basins to integrated fixed-film activated sludge using suspended plastic carriers, coupled with the addition of upstream anaerobic and anoxic basins, was the most economical solution when compared to three other alternatives.An on-site pilot study was conducted to confirm the design parameters and conditions which would yield reliable nitrogen control. Primary objectives of the four-month pilot study were to verify reliable winter nitrogen control at a reduced suspended sludge age, quantify nitrification rates, document impacts of residual dissolved oxygen levels on nitrification performance, determine the degree of simultaneous nitrification and denitrification in the aerobic zone, and investigate the sludge and attached-growth characteristics of the integrated fixed film activated sludge system. This paper presents the results of the pilot study and provides discussion of the main design considerations gleaned from this study. Construction of the full-scale facilities is underway and the first of two IFAS treatment train is expected to be in operation by the end of the year 2002.
Wastewater treatment plants across the United States are faced with increasingly more stringent discharge limitations on phosphorus and nitrogen. These facilities are now challenged to find an economical means to upgrade treatment in order to meet new limitations. The reasons for these limitations are numerous and include issues such as eutrophication in water bodies such as Chesapeake Bay, Long...
Author(s)
Terry L. JohnsonJames P. McQuarrie
SourceProceedings of the Water Environment Federation
SubjectSession 3 - Municipal Wastewater Treatment Processes Symposium: Fixed Film and Hybrid Treatment Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:17L.214;1-
DOI10.2175/193864702784249105
Volume / Issue2002 / 17
Content sourceWEFTEC
First / last page(s)214 - 226
Copyright2002
Word count335

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES
Pricing
Non-member price: $11.50
Member price:
-289111
Get access
-289111
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES
Abstract
Wastewater treatment plants across the United States are faced with increasingly more stringent discharge limitations on phosphorus and nitrogen. These facilities are now challenged to find an economical means to upgrade treatment in order to meet new limitations. The reasons for these limitations are numerous and include issues such as eutrophication in water bodies such as Chesapeake Bay, Long Island Sound and the Gulf of Mexico particularly at the discharge of the Mississippi River, implementation of TMDLs, water reservoir protection from nutrient overload, and reuse regulations which protect groundwater from nitrate contamination. Many wastewater treatment plants, particularly those in the coastal regions, were originally built as carbonaceous removal activated sludge plants. Implementing nutrient control at these plants normally implies significant aeration basin expansion to achieve the sludge age required for nitrification.In addition to the need for capacity expansion, the City and County of Broomfield Colorado was challenged with pending nutrient limitations. A study of potential options revealed that implementation of a hybrid system through conversion of the existing aeration basins to integrated fixed-film activated sludge using suspended plastic carriers, coupled with the addition of upstream anaerobic and anoxic basins, was the most economical solution when compared to three other alternatives.An on-site pilot study was conducted to confirm the design parameters and conditions which would yield reliable nitrogen control. Primary objectives of the four-month pilot study were to verify reliable winter nitrogen control at a reduced suspended sludge age, quantify nitrification rates, document impacts of residual dissolved oxygen levels on nitrification performance, determine the degree of simultaneous nitrification and denitrification in the aerobic zone, and investigate the sludge and attached-growth characteristics of the integrated fixed film activated sludge system. This paper presents the results of the pilot study and provides discussion of the main design considerations gleaned from this study. Construction of the full-scale facilities is underway and the first of two IFAS treatment train is expected to be in operation by the end of the year 2002.
Wastewater treatment plants across the United States are faced with increasingly more stringent discharge limitations on phosphorus and nitrogen. These facilities are now challenged to find an economical means to upgrade treatment in order to meet new limitations. The reasons for these limitations are numerous and include issues such as eutrophication in water bodies such as Chesapeake Bay, Long...
Author(s)
Terry L. JohnsonJames P. McQuarrie
SourceProceedings of the Water Environment Federation
SubjectSession 3 - Municipal Wastewater Treatment Processes Symposium: Fixed Film and Hybrid Treatment Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:17L.214;1-
DOI10.2175/193864702784249105
Volume / Issue2002 / 17
Content sourceWEFTEC
First / last page(s)214 - 226
Copyright2002
Word count335

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Terry L. Johnson# James P. McQuarrie. IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Sep. 2025. <https://www.accesswater.org?id=-289111CITANCHOR>.
Terry L. Johnson# James P. McQuarrie. IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 6, 2025. https://www.accesswater.org/?id=-289111CITANCHOR.
Terry L. Johnson# James P. McQuarrie
IFAS BNR FULL-SCALE DESIGN AND PERFORMANCE CHALLENGES
Access Water
Water Environment Federation
December 22, 2018
September 6, 2025
https://www.accesswater.org/?id=-289111CITANCHOR