lastID = -289603
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 19:59:15 Adam Phillips
  • 2022-05-06 19:59:14 Adam Phillips
  • 2020-03-27 02:14:22 Adam Phillips
  • 2020-03-27 02:14:21 Adam Phillips
  • 2020-01-31 20:36:37 Administrator
  • 2020-01-31 20:36:36 Administrator
  • 2020-01-31 20:36:35 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL

BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL

BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL
Abstract
Contractors and construction inspection personnel often complain that the specifying engineers don't know what it takes to build the designs. Nonetheless, efficiency encourages specialization that results in separate groups writing standard specifications, drafting design documents, and inspecting the field construction. Technical staff at the Milwaukee Metropolitan Sewerage District (MMSD) sees re-establishment of the standards-designconstruct linkages as a key to reversing the historic growth of infiltration and inflow rates.In the late 1970s MMSD was served with court orders requiring elimination of all wet weather overflows from the separated sanitary sewer systems. By 1982, sewer system evaluation surveys throughout the 28 communities tributary to the MMSD network identified the cost effective level of sewer rehabilitation. The communities committed to repair the defects, and MMSD amended rules and regulations requiring that all new sewer plans conform to Standard Specifications specifically upgraded to limit opportunities for infiltration and inflow. The planners thought the infiltration and inflow would decrease, and new facilities were sized accordingly.By the late 1990s, a number of basement backups and sanitary sewer overflows (SSOs) in the communities and in the metropolitan interceptor system made it apparent that the infiltration and inflow were not under control. This paper summarizes the many provisions and programs that MMSD is developing to more effectively control the infiltration and inflow into the metropolitan interceptors and the connected community sewers. It emphasizes those provisions where Rules, Standards Specifications and design documents are improving by virtue of incorporating feedback from field observation of construction practices.MMSD technical staff work with the Public Works Industry Improvement Program committee to upgrade the Standard Specifications for Sewer & Water Construction in Wisconsin to better exclude rainwater from sanitary sewers. The MMSD Rules now require, and subsidize, limited sewer system investigations leading to infiltration and inflow reduction plans for basins where the peak to average day flow ratio is high. MMSD is increasingly attentive to new sewer plan reviews, consistently requiring that sewer plans meet a standard that will not increase future peak flows above planned levels.MMSD also provides quality assurance of ongoing sewer construction throughout the 420 square mile service area. The quality assurance inspector, like the sewer plan reviewer, often observes provisions of the Standard Specifications and the Rules that are being circumvented, ignored or simply not effectively implemented. They work together with the specification engineer, municipal design engineers, contractors and the facility planners to identify more effective provisions or technologies to exclude infiltration and inflow from the constructed sewers.The paper will summarize lessons learned about the effectiveness (or ineffectiveness) of the range of system wide infiltration and inflow reduction alternatives tested in the MMSD service area during the past 25 years. Infiltration and inflow reduction measures tested include:Complete Sanitary Sewer Evaluation SurveysRules and standard specifications requiring sealed manhole lidsRules and standard specifications requiring downspout connectionRules and standard specifications requiring verifiable sump pump discharges away from the foundationRules and standard specifications prohibiting cross connection with storm sewersRules subsidizing manhole inspection, smoke testing and flow monitoring to identify inflow sourcesGrants offered for projects expected to demonstrate and measure effective infiltration and inflow control technologies
Contractors and construction inspection personnel often complain that the specifying engineers don't know what it takes to build the designs. Nonetheless, efficiency encourages specialization that results in separate groups writing standard specifications, drafting design documents, and inspecting the field construction. Technical staff at the Milwaukee Metropolitan Sewerage District (MMSD) sees...
Author(s)
Nancy SchultzTim BateLarry Kober
SourceProceedings of the Water Environment Federation
SubjectSession 9 – Construction and Rehabilitation Topics
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:6L.415;1-
DOI10.2175/193864702785300944
Volume / Issue2002 / 6
Content sourceUtility Management Conference
First / last page(s)415 - 422
Copyright2002
Word count531

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL
Pricing
Non-member price: $11.50
Member price:
-289603
Get access
-289603
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL
Abstract
Contractors and construction inspection personnel often complain that the specifying engineers don't know what it takes to build the designs. Nonetheless, efficiency encourages specialization that results in separate groups writing standard specifications, drafting design documents, and inspecting the field construction. Technical staff at the Milwaukee Metropolitan Sewerage District (MMSD) sees re-establishment of the standards-designconstruct linkages as a key to reversing the historic growth of infiltration and inflow rates.In the late 1970s MMSD was served with court orders requiring elimination of all wet weather overflows from the separated sanitary sewer systems. By 1982, sewer system evaluation surveys throughout the 28 communities tributary to the MMSD network identified the cost effective level of sewer rehabilitation. The communities committed to repair the defects, and MMSD amended rules and regulations requiring that all new sewer plans conform to Standard Specifications specifically upgraded to limit opportunities for infiltration and inflow. The planners thought the infiltration and inflow would decrease, and new facilities were sized accordingly.By the late 1990s, a number of basement backups and sanitary sewer overflows (SSOs) in the communities and in the metropolitan interceptor system made it apparent that the infiltration and inflow were not under control. This paper summarizes the many provisions and programs that MMSD is developing to more effectively control the infiltration and inflow into the metropolitan interceptors and the connected community sewers. It emphasizes those provisions where Rules, Standards Specifications and design documents are improving by virtue of incorporating feedback from field observation of construction practices.MMSD technical staff work with the Public Works Industry Improvement Program committee to upgrade the Standard Specifications for Sewer & Water Construction in Wisconsin to better exclude rainwater from sanitary sewers. The MMSD Rules now require, and subsidize, limited sewer system investigations leading to infiltration and inflow reduction plans for basins where the peak to average day flow ratio is high. MMSD is increasingly attentive to new sewer plan reviews, consistently requiring that sewer plans meet a standard that will not increase future peak flows above planned levels.MMSD also provides quality assurance of ongoing sewer construction throughout the 420 square mile service area. The quality assurance inspector, like the sewer plan reviewer, often observes provisions of the Standard Specifications and the Rules that are being circumvented, ignored or simply not effectively implemented. They work together with the specification engineer, municipal design engineers, contractors and the facility planners to identify more effective provisions or technologies to exclude infiltration and inflow from the constructed sewers.The paper will summarize lessons learned about the effectiveness (or ineffectiveness) of the range of system wide infiltration and inflow reduction alternatives tested in the MMSD service area during the past 25 years. Infiltration and inflow reduction measures tested include:Complete Sanitary Sewer Evaluation SurveysRules and standard specifications requiring sealed manhole lidsRules and standard specifications requiring downspout connectionRules and standard specifications requiring verifiable sump pump discharges away from the foundationRules and standard specifications prohibiting cross connection with storm sewersRules subsidizing manhole inspection, smoke testing and flow monitoring to identify inflow sourcesGrants offered for projects expected to demonstrate and measure effective infiltration and inflow control technologies
Contractors and construction inspection personnel often complain that the specifying engineers don't know what it takes to build the designs. Nonetheless, efficiency encourages specialization that results in separate groups writing standard specifications, drafting design documents, and inspecting the field construction. Technical staff at the Milwaukee Metropolitan Sewerage District (MMSD) sees...
Author(s)
Nancy SchultzTim BateLarry Kober
SourceProceedings of the Water Environment Federation
SubjectSession 9 – Construction and Rehabilitation Topics
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:6L.415;1-
DOI10.2175/193864702785300944
Volume / Issue2002 / 6
Content sourceUtility Management Conference
First / last page(s)415 - 422
Copyright2002
Word count531

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Nancy Schultz# Tim Bate# Larry Kober. BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-289603CITANCHOR>.
Nancy Schultz# Tim Bate# Larry Kober. BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-289603CITANCHOR.
Nancy Schultz# Tim Bate# Larry Kober
BLENDING FIELD EXPERIENCE AND THEORY TO IMPROVE INFILTRATION AND INFLOW CONTROL
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-289603CITANCHOR