lastID = -289607
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 19:59:38 Adam Phillips
  • 2020-03-27 02:14:18 Adam Phillips
  • 2020-03-27 02:14:17 Adam Phillips
  • 2020-01-31 20:38:56 Administrator
  • 2020-01-31 20:38:55 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance

Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance

Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance
Abstract
Fairfax County's collection and transmission system, which was constructed beginning in the early 1940's, grew rapidly in the 1980's. The quality and material of construction in the early years of the System varied widely since stringent design and review/acceptance standards and formal system inspection and maintenance procedures were not developed and implemented until the 1980's. Then, in 1989, the County experienced a catastrophic sewer collapse affecting sewer service in one of the largest but oldest sewer sheds in the System.In response to the sewer collapse and other wet-weather peak capacity issues, the County initiated a three-phase preventive maintenance program (Program). In the first phase, the County began a self-evaluation of the entire collection System including closed circuit television (CCTV) inspection and flow monitoring at strategic locations. This served as a foundation to initiate the second phase of the Program, a proactive sewer rehabilitation program and a pump station modernization program focusing on extending the useful life of sewer System structures. The third phase consisted of separating the County's inspection and cleaning activities to increase efficiency and reduce Sanitary Sewer Overflows (SSO's).As the Program progressed, senior management recognized the need to provide additional engineering support and to improve communication between field and planning personnel to continuously support System management. To address these issues, management developed a comprehensive work plan that included:Outsourcing of sewer lining and easement clearing workDiscontinuing ineffective repair and rehabilitation effortsConducting a detailed System capacity analysisDeveloping an automated System inventory by its planning engineersImplementing the field use of new technologies (SCADA, 360 degree TV cameras, and a computerized Sewer Maintenance Management System).In addition, the Program also included improved financial planning techniques, integrating System revenue/cost, funding, and financing concepts to ensure that capital improvement requirements for the sewer rehabilitation program could be met on a pay-as-you-go basis. By proactively integrating engineering, finance, and operations and maintenance considerations, the County established an effective preventive maintenance program as well as the financial position to support long-term funding needs.The County continues to develop integrated System management tools to support the broad range of wastewater management objectives. To assist managers in financial planning, the County uses both a 5-year financial forecast and a 25-year financial plan to evaluate the impacts of operation and maintenance records and capital budgets on System customers. Another planned step, linking GIS and asset maintenance records with the Capital Improvement Program (CIP), will provide County staff with more efficient access to asset management data. In the future, The County envisions a data information system that will link equipment maintenance histories, capacity utilization, real-time locations of SSO's, and asset features in an integrated decision support network for System managers.With more than ten years of financial planning experience in support of an evolving asset management program, the County recognizes substantial benefits. The Program's integrated approach to asset management has stabilized annual operational and maintenance costs and largely eliminated the need to conduct large-scale reactive maintenance projects. More importantly, annual SSO occurrences have fallen well below industry averages.On average, annual operating and maintenance charges average 9 million while preventive maintenance and rehabilitation expenditures and another 6 million a year. Combined, these expenses average slightly less than 15% of the Fairfax County Wastewater Management Program's annual expenditures. The competitive sewer charges are adequate to cover pay-as-you-go sewer infrastructure capital costs in addition to the traditional operation and maintenance and debt service payments for treatment plant upgrade and expansion projects. And as part of the rate structure design, the debt coverage ratio is routinely greater than 2.0, evidence that funds are available after paying operating and debt expenses to support an aggressive System rehabilitation Program.
Fairfax County's collection and transmission system, which was constructed beginning in the early 1940's, grew rapidly in the 1980's. The quality and material of construction in the early years of the System varied widely since stringent design and review/acceptance standards and formal system inspection and maintenance procedures were not developed and implemented until the 1980's. Then, in 1989,...
Author(s)
Edgar R. JonesThomas J. RussellGilbert Osei-Kwadwo
SourceProceedings of the Water Environment Federation
SubjectSession 10 – Strategies to Assess and Improve Performance
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:6L.441;1-
DOI10.2175/193864702785300827
Volume / Issue2002 / 6
Content sourceUtility Management Conference
First / last page(s)441 - 469
Copyright2002
Word count620

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance
Pricing
Non-member price: $11.50
Member price:
-289607
Get access
-289607
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance
Abstract
Fairfax County's collection and transmission system, which was constructed beginning in the early 1940's, grew rapidly in the 1980's. The quality and material of construction in the early years of the System varied widely since stringent design and review/acceptance standards and formal system inspection and maintenance procedures were not developed and implemented until the 1980's. Then, in 1989, the County experienced a catastrophic sewer collapse affecting sewer service in one of the largest but oldest sewer sheds in the System.In response to the sewer collapse and other wet-weather peak capacity issues, the County initiated a three-phase preventive maintenance program (Program). In the first phase, the County began a self-evaluation of the entire collection System including closed circuit television (CCTV) inspection and flow monitoring at strategic locations. This served as a foundation to initiate the second phase of the Program, a proactive sewer rehabilitation program and a pump station modernization program focusing on extending the useful life of sewer System structures. The third phase consisted of separating the County's inspection and cleaning activities to increase efficiency and reduce Sanitary Sewer Overflows (SSO's).As the Program progressed, senior management recognized the need to provide additional engineering support and to improve communication between field and planning personnel to continuously support System management. To address these issues, management developed a comprehensive work plan that included:Outsourcing of sewer lining and easement clearing workDiscontinuing ineffective repair and rehabilitation effortsConducting a detailed System capacity analysisDeveloping an automated System inventory by its planning engineersImplementing the field use of new technologies (SCADA, 360 degree TV cameras, and a computerized Sewer Maintenance Management System).In addition, the Program also included improved financial planning techniques, integrating System revenue/cost, funding, and financing concepts to ensure that capital improvement requirements for the sewer rehabilitation program could be met on a pay-as-you-go basis. By proactively integrating engineering, finance, and operations and maintenance considerations, the County established an effective preventive maintenance program as well as the financial position to support long-term funding needs.The County continues to develop integrated System management tools to support the broad range of wastewater management objectives. To assist managers in financial planning, the County uses both a 5-year financial forecast and a 25-year financial plan to evaluate the impacts of operation and maintenance records and capital budgets on System customers. Another planned step, linking GIS and asset maintenance records with the Capital Improvement Program (CIP), will provide County staff with more efficient access to asset management data. In the future, The County envisions a data information system that will link equipment maintenance histories, capacity utilization, real-time locations of SSO's, and asset features in an integrated decision support network for System managers.With more than ten years of financial planning experience in support of an evolving asset management program, the County recognizes substantial benefits. The Program's integrated approach to asset management has stabilized annual operational and maintenance costs and largely eliminated the need to conduct large-scale reactive maintenance projects. More importantly, annual SSO occurrences have fallen well below industry averages.On average, annual operating and maintenance charges average 9 million while preventive maintenance and rehabilitation expenditures and another 6 million a year. Combined, these expenses average slightly less than 15% of the Fairfax County Wastewater Management Program's annual expenditures. The competitive sewer charges are adequate to cover pay-as-you-go sewer infrastructure capital costs in addition to the traditional operation and maintenance and debt service payments for treatment plant upgrade and expansion projects. And as part of the rate structure design, the debt coverage ratio is routinely greater than 2.0, evidence that funds are available after paying operating and debt expenses to support an aggressive System rehabilitation Program.
Fairfax County's collection and transmission system, which was constructed beginning in the early 1940's, grew rapidly in the 1980's. The quality and material of construction in the early years of the System varied widely since stringent design and review/acceptance standards and formal system inspection and maintenance procedures were not developed and implemented until the 1980's. Then, in 1989,...
Author(s)
Edgar R. JonesThomas J. RussellGilbert Osei-Kwadwo
SourceProceedings of the Water Environment Federation
SubjectSession 10 – Strategies to Assess and Improve Performance
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:6L.441;1-
DOI10.2175/193864702785300827
Volume / Issue2002 / 6
Content sourceUtility Management Conference
First / last page(s)441 - 469
Copyright2002
Word count620

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Edgar R. Jones# Thomas J. Russell# Gilbert Osei-Kwadwo. Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-289607CITANCHOR>.
Edgar R. Jones# Thomas J. Russell# Gilbert Osei-Kwadwo. Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-289607CITANCHOR.
Edgar R. Jones# Thomas J. Russell# Gilbert Osei-Kwadwo
Bringing It All Together: Integrating Collections System Management Efforts To Achieve Superior Performance
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-289607CITANCHOR