lastID = -289932
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 04:59:04 Administrator
  • 2020-02-01 04:59:03 Administrator
  • 2020-02-01 04:59:02 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES

THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES

THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES
Abstract
One of the key analytical parameters used to assess the performance of typical municipal wastewater processes is the determination of the settled sludge volume (SV) within the aeration basin. Commonly, this measurement method is performed on a bench scale using a settlometer. This method is sensitive to sampling technique, agitation methods, variations in suspension, process temperature, dimensions of the settling column, and the amount of time between sampling and the start of the determination; all of which can significantly affect results. The test is time-consuming and because of this it is typically performed only once per day.To help eliminate the difficulty in performing the SV measurement, an on-line instrument has been designed to continuously perform the measurement on-site. The methodology includes purging the previous sample, accepting a new sample, and performing the measurement. The instrument design includes a uniquely shaped settlometer vessel. This specially designed vessel increases the settling rate and reduces the analysis time. This decreased time has been correlated to the standardized laboratory methods for the 30-minute SV standard protocol across a wide number of samples. Thus, shortened cycle time for the process SV measurement is the result.Two on-line SV instruments were installed in the aeration basins of two different municipal wastewater plants. These installations provided data that can be compared directly to the utilities' laboratory values generated from their treatment process. These installations sites also provided the opportunity to calculate Sludge Volume Index (SVI) when the total suspended solids (TSS) measurements from the aeration basin are measured concurrently. The use of this process monitoring technology to determine the critical SVI of the wastewater plant provides information to allow plant performance to be controlled real-time.This paper presents comparisons between the SVI values generated using laboratory methods and the process methodology. These comparisons also demonstrate how the increased frequency of the process measurements provided additional details that were missed when less frequent laboratory analysis were performed. Data from these comparisons come from the two different water reclamation plants. The process control SVI data will be correlated to final effluent parameters such as effluent biological oxygen demand (BOD), and TSS. In addition, more practical application issues such as process instrument maintenance protocols will be discussed.
One of the key analytical parameters used to assess the performance of typical municipal wastewater processes is the determination of the settled sludge volume (SV) within the aeration basin. Commonly, this measurement method is performed on a bench scale using a settlometer. This method is sensitive to sampling technique, agitation methods, variations in suspension, process temperature,...
Author(s)
Michael J. SadarMiguel MolinaLeah OxenfordRay Kemp
SourceProceedings of the Water Environment Federation
SubjectSession 15 - Automation and Information Technology: See Me! Feel Me! Touch Me!: On Line Instrumentation for Automation and Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:11L.448;1-
DOI10.2175/193864703784756039
Volume / Issue2003 / 11
Content sourceWEFTEC
First / last page(s)448 - 463
Copyright2003
Word count379

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES
Pricing
Non-member price: $11.50
Member price:
-289932
Get access
-289932
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES
Abstract
One of the key analytical parameters used to assess the performance of typical municipal wastewater processes is the determination of the settled sludge volume (SV) within the aeration basin. Commonly, this measurement method is performed on a bench scale using a settlometer. This method is sensitive to sampling technique, agitation methods, variations in suspension, process temperature, dimensions of the settling column, and the amount of time between sampling and the start of the determination; all of which can significantly affect results. The test is time-consuming and because of this it is typically performed only once per day.To help eliminate the difficulty in performing the SV measurement, an on-line instrument has been designed to continuously perform the measurement on-site. The methodology includes purging the previous sample, accepting a new sample, and performing the measurement. The instrument design includes a uniquely shaped settlometer vessel. This specially designed vessel increases the settling rate and reduces the analysis time. This decreased time has been correlated to the standardized laboratory methods for the 30-minute SV standard protocol across a wide number of samples. Thus, shortened cycle time for the process SV measurement is the result.Two on-line SV instruments were installed in the aeration basins of two different municipal wastewater plants. These installations provided data that can be compared directly to the utilities' laboratory values generated from their treatment process. These installations sites also provided the opportunity to calculate Sludge Volume Index (SVI) when the total suspended solids (TSS) measurements from the aeration basin are measured concurrently. The use of this process monitoring technology to determine the critical SVI of the wastewater plant provides information to allow plant performance to be controlled real-time.This paper presents comparisons between the SVI values generated using laboratory methods and the process methodology. These comparisons also demonstrate how the increased frequency of the process measurements provided additional details that were missed when less frequent laboratory analysis were performed. Data from these comparisons come from the two different water reclamation plants. The process control SVI data will be correlated to final effluent parameters such as effluent biological oxygen demand (BOD), and TSS. In addition, more practical application issues such as process instrument maintenance protocols will be discussed.
One of the key analytical parameters used to assess the performance of typical municipal wastewater processes is the determination of the settled sludge volume (SV) within the aeration basin. Commonly, this measurement method is performed on a bench scale using a settlometer. This method is sensitive to sampling technique, agitation methods, variations in suspension, process temperature,...
Author(s)
Michael J. SadarMiguel MolinaLeah OxenfordRay Kemp
SourceProceedings of the Water Environment Federation
SubjectSession 15 - Automation and Information Technology: See Me! Feel Me! Touch Me!: On Line Instrumentation for Automation and Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:11L.448;1-
DOI10.2175/193864703784756039
Volume / Issue2003 / 11
Content sourceWEFTEC
First / last page(s)448 - 463
Copyright2003
Word count379

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Michael J. Sadar# Miguel Molina# Leah Oxenford# Ray Kemp. THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 2 Sep. 2025. <https://www.accesswater.org?id=-289932CITANCHOR>.
Michael J. Sadar# Miguel Molina# Leah Oxenford# Ray Kemp. THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 2, 2025. https://www.accesswater.org/?id=-289932CITANCHOR.
Michael J. Sadar# Miguel Molina# Leah Oxenford# Ray Kemp
THE DETERMINATION OF SETTLED SLUDGE VOLUME AND SLUDGE VOLUME INDEX USING PROCESS METHODOLOGIES
Access Water
Water Environment Federation
December 22, 2018
September 2, 2025
https://www.accesswater.org/?id=-289932CITANCHOR