lastID = -290252
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Insystem Storage Capacity Enhances Sewer System Operation
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:28:40 Adam Phillips
  • 2020-03-26 22:16:58 Adam Phillips
  • 2020-02-01 00:33:37 Administrator
  • 2020-02-01 00:33:36 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Insystem Storage Capacity Enhances Sewer System Operation

Insystem Storage Capacity Enhances Sewer System Operation

Insystem Storage Capacity Enhances Sewer System Operation

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Insystem Storage Capacity Enhances Sewer System Operation
Abstract
Bangor, Maine has been addressing control of Combined Sewer Overflows since 1987. In 1992, a Combined Sewer Overflow Facilities Plan was prepared, which included a variety of recommendations for CSO Control. For three locations, insystem storage with subsequent treatment was the recommended method of controlling combined sewer overflows.Although the specific intent of these projects was reduction of CSO discharges, operators have discovered that the additional collection system capacity has also provided significant benefits regarding management, operations, and maintenance. The experiences of the system operators should be of interest to all communities looking at options of complying with the proposed cMOM requirements.In 1998, Bangor conceived, designed, and constructed the 1.2 million-gallon Davis Brook Storage Facility, a unique and innovative in-line tunnel-like structure constructed of V-bottom pre-cast concrete box sections. The project was a radical departure from the conventional storage tank approach and was extremely successful from a construction and operational perspective, and very cost-effective with a total cost of only 1.3 million.In 2000, Bangor constructed the City's second storage project, the 1.2 million-gallon Kenduskeag East Storage Facility. Bangor again utilized pre-cast concrete box sections to construct this offline structure underneath an existing public parking lot. Constructed at a total cost of 2.4 million, this project has contributed to a significant reduction of CSO discharges in the downtown area of Bangor.In 2002, Bangor constructed the City's third storage project, the 1.4 million-gallon Barkersville Storage Facility. This 2 million project is another in-line tunnel-like facility constructed of Vbottom precast box sections, controlled by a SCADA-operated gate system.Bangor now has 3.8 million gallons of extra capacity within its sewer system, provided at a total cost of only 5.7 million, compared to projected costs of 18.8 million for constructed-in-place facilities. There has been considerable interest to date regarding Bangor's approach to CSO storage, especially the use of precast V-bottom box sections, and the significant time and cost savings of this method of insystem storage.Now that the operators have gained some experience with these new facilities, they have found several benefits beyond significant reduction of CSO discharges. Some of these benefits are:Real-time flow management within the system,Leveling peak flows into the treatment plant,Avoiding operation of the plant's CSO by-pass function,Stopping flows to undertake downstream maintenance,Computer graphic displays of system flow levels,Interceptor flushing, andControl of peak electrical demand at the Treatment Plant.
Bangor, Maine has been addressing control of Combined Sewer Overflows since 1987. In 1992, a Combined Sewer Overflow Facilities Plan was prepared, which included a variety of recommendations for CSO Control. For three locations, insystem storage with subsequent treatment was the recommended method of controlling combined sewer overflows.Although the specific intent of these projects was reduction...
Author(s)
John L. MurphyJames D. RingBradley Moore
SourceProceedings of the Water Environment Federation
SubjectSession 7 CSOs – Manage or Separate
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:3L.563;1-
DOI10.2175/193864703784830207
Volume / Issue2003 / 3
Content sourceCollection Systems Conference
First / last page(s)563 - 583
Copyright2003
Word count400

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Insystem Storage Capacity Enhances Sewer System Operation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Insystem Storage Capacity Enhances Sewer System Operation
Pricing
Non-member price: $11.50
Member price:
-290252
Get access
-290252
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Insystem Storage Capacity Enhances Sewer System Operation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Insystem Storage Capacity Enhances Sewer System Operation
Abstract
Bangor, Maine has been addressing control of Combined Sewer Overflows since 1987. In 1992, a Combined Sewer Overflow Facilities Plan was prepared, which included a variety of recommendations for CSO Control. For three locations, insystem storage with subsequent treatment was the recommended method of controlling combined sewer overflows.Although the specific intent of these projects was reduction of CSO discharges, operators have discovered that the additional collection system capacity has also provided significant benefits regarding management, operations, and maintenance. The experiences of the system operators should be of interest to all communities looking at options of complying with the proposed cMOM requirements.In 1998, Bangor conceived, designed, and constructed the 1.2 million-gallon Davis Brook Storage Facility, a unique and innovative in-line tunnel-like structure constructed of V-bottom pre-cast concrete box sections. The project was a radical departure from the conventional storage tank approach and was extremely successful from a construction and operational perspective, and very cost-effective with a total cost of only 1.3 million.In 2000, Bangor constructed the City's second storage project, the 1.2 million-gallon Kenduskeag East Storage Facility. Bangor again utilized pre-cast concrete box sections to construct this offline structure underneath an existing public parking lot. Constructed at a total cost of 2.4 million, this project has contributed to a significant reduction of CSO discharges in the downtown area of Bangor.In 2002, Bangor constructed the City's third storage project, the 1.4 million-gallon Barkersville Storage Facility. This 2 million project is another in-line tunnel-like facility constructed of Vbottom precast box sections, controlled by a SCADA-operated gate system.Bangor now has 3.8 million gallons of extra capacity within its sewer system, provided at a total cost of only 5.7 million, compared to projected costs of 18.8 million for constructed-in-place facilities. There has been considerable interest to date regarding Bangor's approach to CSO storage, especially the use of precast V-bottom box sections, and the significant time and cost savings of this method of insystem storage.Now that the operators have gained some experience with these new facilities, they have found several benefits beyond significant reduction of CSO discharges. Some of these benefits are:Real-time flow management within the system,Leveling peak flows into the treatment plant,Avoiding operation of the plant's CSO by-pass function,Stopping flows to undertake downstream maintenance,Computer graphic displays of system flow levels,Interceptor flushing, andControl of peak electrical demand at the Treatment Plant.
Bangor, Maine has been addressing control of Combined Sewer Overflows since 1987. In 1992, a Combined Sewer Overflow Facilities Plan was prepared, which included a variety of recommendations for CSO Control. For three locations, insystem storage with subsequent treatment was the recommended method of controlling combined sewer overflows.Although the specific intent of these projects was reduction...
Author(s)
John L. MurphyJames D. RingBradley Moore
SourceProceedings of the Water Environment Federation
SubjectSession 7 CSOs – Manage or Separate
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:3L.563;1-
DOI10.2175/193864703784830207
Volume / Issue2003 / 3
Content sourceCollection Systems Conference
First / last page(s)563 - 583
Copyright2003
Word count400

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
John L. Murphy# James D. Ring# Bradley Moore. Insystem Storage Capacity Enhances Sewer System Operation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-290252CITANCHOR>.
John L. Murphy# James D. Ring# Bradley Moore. Insystem Storage Capacity Enhances Sewer System Operation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-290252CITANCHOR.
John L. Murphy# James D. Ring# Bradley Moore
Insystem Storage Capacity Enhances Sewer System Operation
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-290252CITANCHOR