lastID = -290646
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Book cover
MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 01:39:11 Administrator
  • 2020-02-01 01:39:10 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT

MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT

MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT
Abstract
In 1990, Tangipahoa Parish Sewerage District No. 1 was required to provide sewer service to an area Southeast of the City of Hammond, but lying out of the city limits, which consisted of a densely populated area of subdivisions and apartment complexes with individual or no waste treatment. None of the existing subdivision treatment plants could be expanded to service the entire eighteen (18) square mile area nor would the City of Hammond provide sewer service to the area. Several older developments had collection lines but no treatment, resulting in the discharge of large quantities of untreated waste. Further, the area was too affluent to qualify for a grant for the entire area. In addition to a sewer collection system, the area would require a sewerage treatment facility capable of treating a minimum of 200,000 gpd and a maximum of 500,000 gpd. No existing treatment process would provide the level of treatment required for the funds that were available for the project. Because of the fixed cost of the collection system only two hundred fifty thousand dollars (250,000.00) was available to acquire the site and build the waste treatment facility. Further, the facility had to have low operating cost due to the fact that the District did not have a tax base and had to operate solely on sewer service charges.Tangipahoa Parish Sewer District No. 1, whose jurisdiction the area fell under, sought and received a low interest loan from FmHA. However, the maximum amount that could be borrowed was eight hundred thousand dollars (800,000.00). Because of the fixed cost of the collection system, only two hundred fifty thousand dollars (250,000.00) was available to acquire the site and build the waste treatment facility.Therefore, in 1991, a new type of facility was designed and constructed specifically for this application in order to reduce construction and operation cost and improve reliability. The facility was based on empirical design parameters amassed by the District since its inception. This facility was so successful that a second facility was constructed in the Velma Community in 1995 using LCDBG funds. Both facilities have been extensively tested to empirically determine their operating parameters and to verify the design used. The effluent test results for the Southeast Hammond Facility for the last five years have been summarized in Table 1.A facility capable of treating the specified waste load to tertiary limits was constructed for one hundred eighty three thousand dollars (183,000.00) on a five-acre (5) tract which was purchased for twenty thousand (20,000.00). The facility consists of an Aerated Lagoon followed by a High Rate Clarifier, which re-circulates the M.L.V.S.S. This is followed by a diffused air basin which discharges over a rock filter wall to an anoxic basin. The discharge from the anoxic basin is passively re-aerated prior to entering a manmade wetland which polishes and disinfects the waste stream. The effluent then enters a final basin after passing over a rock filter wall. In this basin chlorinated water is added, if necessary. The facility treated its initial waste load of 200,000 gpd and met its discharge limits without chlorination, and with only one of its three high rate clarifiers in operation, see attached results. The facility currently treats 440,000 gpd and the effluent BOD5 is normally less than 10.0 ppm and frequently less than 3.0 ppm. The facility currently costs one thousand six hundred sixty one dollars and sixty-seven cents (1,661.67) per month to operate. This cost, which is from the Districts most recent audit, includes power, labor, chemicals, and maintenance cost. Because of the success of this design the District is currently constructing two (2) additional regional facilities using R.U.S. funds which will replace six (6) conventional facilities and operate for one half (½) the current cost.The facility constructed by the District provides a low cost innovative alternate to currently accepted methods of waste treatment. The cost of construction is fifty (50) cents per gallon and the cost of operation is less than one half (½) cents per gallon per month. Therefore, this innovative method of waste treatment, which is a site specific design, can be an economic waste treatment alternative for smaller communities, especially those with limited resources for labor and operation who are forced to hire unskilled personnel.
In 1990, Tangipahoa Parish Sewerage District No. 1 was required to provide sewer service to an area Southeast of the City of Hammond, but lying out of the city limits, which consisted of a densely populated area of subdivisions and apartment complexes with individual or no waste treatment. None of the existing subdivision treatment plants could be expanded to service the entire eighteen (18)...
Author(s)
Robert G. Barrilleaux
SourceProceedings of the Water Environment Federation
SubjectSession 36 Decentralized Treatment and International Issues: Wetlands: Enhancing Waste Treatment for Small Communities
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:9L.286;1-
DOI10.2175/193864703784639778
Volume / Issue2003 / 9
Content sourceWEFTEC
First / last page(s)286 - 290
Copyright2003
Word count714

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT
Pricing
Non-member price: $11.50
Member price:
-290646
Get access
-290646
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT
Abstract
In 1990, Tangipahoa Parish Sewerage District No. 1 was required to provide sewer service to an area Southeast of the City of Hammond, but lying out of the city limits, which consisted of a densely populated area of subdivisions and apartment complexes with individual or no waste treatment. None of the existing subdivision treatment plants could be expanded to service the entire eighteen (18) square mile area nor would the City of Hammond provide sewer service to the area. Several older developments had collection lines but no treatment, resulting in the discharge of large quantities of untreated waste. Further, the area was too affluent to qualify for a grant for the entire area. In addition to a sewer collection system, the area would require a sewerage treatment facility capable of treating a minimum of 200,000 gpd and a maximum of 500,000 gpd. No existing treatment process would provide the level of treatment required for the funds that were available for the project. Because of the fixed cost of the collection system only two hundred fifty thousand dollars (250,000.00) was available to acquire the site and build the waste treatment facility. Further, the facility had to have low operating cost due to the fact that the District did not have a tax base and had to operate solely on sewer service charges.Tangipahoa Parish Sewer District No. 1, whose jurisdiction the area fell under, sought and received a low interest loan from FmHA. However, the maximum amount that could be borrowed was eight hundred thousand dollars (800,000.00). Because of the fixed cost of the collection system, only two hundred fifty thousand dollars (250,000.00) was available to acquire the site and build the waste treatment facility.Therefore, in 1991, a new type of facility was designed and constructed specifically for this application in order to reduce construction and operation cost and improve reliability. The facility was based on empirical design parameters amassed by the District since its inception. This facility was so successful that a second facility was constructed in the Velma Community in 1995 using LCDBG funds. Both facilities have been extensively tested to empirically determine their operating parameters and to verify the design used. The effluent test results for the Southeast Hammond Facility for the last five years have been summarized in Table 1.A facility capable of treating the specified waste load to tertiary limits was constructed for one hundred eighty three thousand dollars (183,000.00) on a five-acre (5) tract which was purchased for twenty thousand (20,000.00). The facility consists of an Aerated Lagoon followed by a High Rate Clarifier, which re-circulates the M.L.V.S.S. This is followed by a diffused air basin which discharges over a rock filter wall to an anoxic basin. The discharge from the anoxic basin is passively re-aerated prior to entering a manmade wetland which polishes and disinfects the waste stream. The effluent then enters a final basin after passing over a rock filter wall. In this basin chlorinated water is added, if necessary. The facility treated its initial waste load of 200,000 gpd and met its discharge limits without chlorination, and with only one of its three high rate clarifiers in operation, see attached results. The facility currently treats 440,000 gpd and the effluent BOD5 is normally less than 10.0 ppm and frequently less than 3.0 ppm. The facility currently costs one thousand six hundred sixty one dollars and sixty-seven cents (1,661.67) per month to operate. This cost, which is from the Districts most recent audit, includes power, labor, chemicals, and maintenance cost. Because of the success of this design the District is currently constructing two (2) additional regional facilities using R.U.S. funds which will replace six (6) conventional facilities and operate for one half (½) the current cost.The facility constructed by the District provides a low cost innovative alternate to currently accepted methods of waste treatment. The cost of construction is fifty (50) cents per gallon and the cost of operation is less than one half (½) cents per gallon per month. Therefore, this innovative method of waste treatment, which is a site specific design, can be an economic waste treatment alternative for smaller communities, especially those with limited resources for labor and operation who are forced to hire unskilled personnel.
In 1990, Tangipahoa Parish Sewerage District No. 1 was required to provide sewer service to an area Southeast of the City of Hammond, but lying out of the city limits, which consisted of a densely populated area of subdivisions and apartment complexes with individual or no waste treatment. None of the existing subdivision treatment plants could be expanded to service the entire eighteen (18)...
Author(s)
Robert G. Barrilleaux
SourceProceedings of the Water Environment Federation
SubjectSession 36 Decentralized Treatment and International Issues: Wetlands: Enhancing Waste Treatment for Small Communities
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:9L.286;1-
DOI10.2175/193864703784639778
Volume / Issue2003 / 9
Content sourceWEFTEC
First / last page(s)286 - 290
Copyright2003
Word count714

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2025 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Robert G. Barrilleaux. MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 25 Oct. 2025. <https://www.accesswater.org?id=-290646CITANCHOR>.
Robert G. Barrilleaux. MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 25, 2025. https://www.accesswater.org/?id=-290646CITANCHOR.
Robert G. Barrilleaux
MODIFIED AERATED LAGOON WITH TERTIARY WETLAND TREATMENT
Access Water
Water Environment Federation
December 22, 2018
October 25, 2025
https://www.accesswater.org/?id=-290646CITANCHOR