lastID = -290700
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 00:34:06 Administrator
  • 2020-02-01 00:34:05 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE

INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE

INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE
Abstract
At a complex manufacturing site in the Southeast, being addressed under the RCRA corrective action program, 9 solid waste management units (SWMUs) and 3 areas of concern (AOCs) were examined in the corrective measures study (CMS). A variety of conventional and innovative technologies were selected for migration control and source control. The cornerstone of the corrective measures is a permeable reactive barrier (PRB) using zero valence iron to reduce chlorinated volatile organic compounds (VOCs) and hexavalent chromium. This migration control measure, which will be the largest of its kind at 8,700 tons of iron filings, will protect human health and the environment by treating groundwater in situ prior to its discharge to the adjacent stream.Given the nature of releases, chemical properties and distribution of contaminants, and hydrogeological characteristics of the site, complete groundwater clean-up would be difficult, and in some areas technically impracticable, to achieve within a reasonable timeframe. Furthermore, the Baseline Risk Assessment established that the site does not pose unacceptable human health risk, except for potential risks associated with hypothetical future use of the uppermost aquifer for drinking water purposes. Therefore, the primary objective in any evaluation of potential additional corrective measures was to focus on source and migration control of contaminants through containment, removal, or destruction, and “make progress toward the ultimate goal of returning contaminated groundwater to its maximum beneficial use” as stated in USEPA's groundwater protection strategy.In consideration of the site characteristics, land use, current conditions, and previous and on-going source control measures, the following principal objectives were recommended for corrective action at the facility: (1) implement corrective measures which are protective of human health and the environment, based upon current potential exposures; (2) for affected groundwater which has migrated beyond the facility boundary (i.e., downgradient from the PRB), clean up to state groundwater quality standards; (3) prevent further degradation of soil and groundwater with appropriate source control corrective measures, and utilize the PRB as a site-wide migration control measure; (4) comply with standards for management of waste during corrective measure implementation; (5) develop and implement use restrictions/institutional controls for site soil and groundwater to prevent future exposures; and (6) implement the approved Performance Monitoring Plan to track the progress of the corrective action program.Short-term protection goals, intermediate performance goals, and final cleanup goals have been formulated. Based upon the risk assessment, “Current Human Exposures Under Control,” an EPA environmental indicator (EI), has been achieved. As a short-term goal, the PRB will be installed to effect the other EI, “Migration of Contaminated Groundwater Under Control.”One intermediate performance goal is recommended: implement the selected corrective measures for source control. The final cleanup goals suggested for this facility are the state groundwater quality standards. The logical point of compliance is groundwater immediately downgradient of the PRB installation. A technical impracticability (TI) zone has been designated for upgradient areas.Based on the CMS evaluation process, eight site-specific components were selected as part of the final recommended corrective measures for the site. The EPA has unconditionally approved the CMS report.
At a complex manufacturing site in the Southeast, being addressed under the RCRA corrective action program, 9 solid waste management units (SWMUs) and 3 areas of concern (AOCs) were examined in the corrective measures study (CMS). A variety of conventional and innovative technologies were selected for migration control and source control. The cornerstone of the corrective measures is a permeable...
Author(s)
Jeffrey L. PintenichDale R. ShowersRobert E. Ash
SourceProceedings of the Water Environment Federation
SubjectSession 65: Remediation and Leachate Treatment
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:10L.290;1-
DOI10.2175/193864704784131581
Volume / Issue2004 / 10
Content sourceWEFTEC
First / last page(s)290 - 314
Copyright2004
Word count508

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE
Pricing
Non-member price: $11.50
Member price:
-290700
Get access
-290700
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE
Abstract
At a complex manufacturing site in the Southeast, being addressed under the RCRA corrective action program, 9 solid waste management units (SWMUs) and 3 areas of concern (AOCs) were examined in the corrective measures study (CMS). A variety of conventional and innovative technologies were selected for migration control and source control. The cornerstone of the corrective measures is a permeable reactive barrier (PRB) using zero valence iron to reduce chlorinated volatile organic compounds (VOCs) and hexavalent chromium. This migration control measure, which will be the largest of its kind at 8,700 tons of iron filings, will protect human health and the environment by treating groundwater in situ prior to its discharge to the adjacent stream.Given the nature of releases, chemical properties and distribution of contaminants, and hydrogeological characteristics of the site, complete groundwater clean-up would be difficult, and in some areas technically impracticable, to achieve within a reasonable timeframe. Furthermore, the Baseline Risk Assessment established that the site does not pose unacceptable human health risk, except for potential risks associated with hypothetical future use of the uppermost aquifer for drinking water purposes. Therefore, the primary objective in any evaluation of potential additional corrective measures was to focus on source and migration control of contaminants through containment, removal, or destruction, and “make progress toward the ultimate goal of returning contaminated groundwater to its maximum beneficial use” as stated in USEPA's groundwater protection strategy.In consideration of the site characteristics, land use, current conditions, and previous and on-going source control measures, the following principal objectives were recommended for corrective action at the facility: (1) implement corrective measures which are protective of human health and the environment, based upon current potential exposures; (2) for affected groundwater which has migrated beyond the facility boundary (i.e., downgradient from the PRB), clean up to state groundwater quality standards; (3) prevent further degradation of soil and groundwater with appropriate source control corrective measures, and utilize the PRB as a site-wide migration control measure; (4) comply with standards for management of waste during corrective measure implementation; (5) develop and implement use restrictions/institutional controls for site soil and groundwater to prevent future exposures; and (6) implement the approved Performance Monitoring Plan to track the progress of the corrective action program.Short-term protection goals, intermediate performance goals, and final cleanup goals have been formulated. Based upon the risk assessment, “Current Human Exposures Under Control,” an EPA environmental indicator (EI), has been achieved. As a short-term goal, the PRB will be installed to effect the other EI, “Migration of Contaminated Groundwater Under Control.”One intermediate performance goal is recommended: implement the selected corrective measures for source control. The final cleanup goals suggested for this facility are the state groundwater quality standards. The logical point of compliance is groundwater immediately downgradient of the PRB installation. A technical impracticability (TI) zone has been designated for upgradient areas.Based on the CMS evaluation process, eight site-specific components were selected as part of the final recommended corrective measures for the site. The EPA has unconditionally approved the CMS report.
At a complex manufacturing site in the Southeast, being addressed under the RCRA corrective action program, 9 solid waste management units (SWMUs) and 3 areas of concern (AOCs) were examined in the corrective measures study (CMS). A variety of conventional and innovative technologies were selected for migration control and source control. The cornerstone of the corrective measures is a permeable...
Author(s)
Jeffrey L. PintenichDale R. ShowersRobert E. Ash
SourceProceedings of the Water Environment Federation
SubjectSession 65: Remediation and Leachate Treatment
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:10L.290;1-
DOI10.2175/193864704784131581
Volume / Issue2004 / 10
Content sourceWEFTEC
First / last page(s)290 - 314
Copyright2004
Word count508

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Jeffrey L. Pintenich# Dale R. Showers# Robert E. Ash. INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-290700CITANCHOR>.
Jeffrey L. Pintenich# Dale R. Showers# Robert E. Ash. INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-290700CITANCHOR.
Jeffrey L. Pintenich# Dale R. Showers# Robert E. Ash
INTEGRATED CORRECTIVE MEASURES AT A COMPLEX SITE
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-290700CITANCHOR