lastID = -290819
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 18:30:54 Adam Phillips
  • 2022-05-06 18:30:53 Adam Phillips
  • 2020-02-01 00:49:17 Administrator
  • 2020-02-01 00:49:16 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN

KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN

KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN
Abstract
This paper presents the methodology and results of engineering evaluations conducted to develop the Sanitary Sewer Overflow (SSO) Long Term Control Plan (LTCP) for the City of Norfolk, Virginia. This sanitary sewer system (System) is one of the oldest in the nation with some active sewers installed in 1913; it comprises 143 sewersheds, 867 miles of pipes and 152 pumping stations within 52.4 square miles. The LTCP needs assessment is based on the results of the field investigation program, the conditions of the sewers system assets and hydraulic modeling.The existing conditions are an indication of potential asset deficiencies (and their causes) that need to be corrected. Parameters investigated for each sewershed include: pipe age and material, defect history, estimated I/I rates, record of SSOs, manhole conditions, structural conditions, surcharging, presence of inflow sources, geographic distribution of service calls and recurrent problems, and estimated wastewater flow produced in gallons per capita per day (GPCD) for various design storms. Field information used to determine sewershed characteristics included results of: manhole inspections, flow; rainfall; and groundwater monitoring, digital imaging of sewers and smoke testing. The sewershed conditions were entered into a project GIS, which was used as a tool for condition assessment.Twenty-six temporary sewer flow meters throughout the City gathered flow data from September 2001 through March 2002. October and November 2001 were the driest months with accumulated monthly rainfall of 0.8 and 0.15 inches, respectively and were used for determining the dry weather Average Daily Flow (ADF). Dry day flows recorded at 15-minute intervals were averaged to determine the shape of the diurnal curve for each area and to estimate infiltration. The RDI/I factor, expressed as a percentage of the total accumulated rainfall that entered the System, ranged from 0.1% to 5.3% with an average of 1.3% for all of the monitoring sites. This RDI/I factor was applied to other storms such as the 2, 10, and 25-year return frequency rainfall events.Water consumption data for the period of February 2001 through March 2002 was used to determine the portion of metered water consumption returned to the sewer system as sewage flow. Sewage Return Factors (SRFs) were developed for each sewershed based on land use. The SRF for Primarily Residential use is 80% and for Mixed Use is 87%. Dry weather infiltration in each sewershed was estimated by multiplying the sewershed land area by a unit infiltration rate. Infiltration rates for individual sewersheds range from a low of 14% to a high of 70% of ADF. The estimated total dry weather infiltration flow is 7.9 MGD, which is about 40% of the estimated dry weather ADF of 19.7 MGD.The rating of the asset conditions determines the relative need for corrective actions in each sewershed and was based on the individual ratings for parameters such as: pipe age, pipe material, defect history, DWF infiltration, SSOs on record, manhole conditions1, manholes surcharged, % manholes subject to inflow, % houselines CCTV inspected2, records of service calls and wastewater flow expressed in GPCD for the 1-year storm.Hydraulic Modeling results indicated that flows closely matched the actual metered flows during Wet Weather. To estimate the performance of the System under wet weather flows the storms with frequencies of recurrence of 1, 2, 10 and 25 years were superimposed on the ADF. Results of these simulations were used to identify the System capacity and rehabilitation needs for SSO Control.Each of the sewersheds was evaluated based on application of the field program results, hydraulic modeling results and a detailed assessment of the sewer system asset conditions. Project priority ratings were used to establish priorities for gravity sewers, pumping stations and force mains. The resulting projects were organized into the City's SSO LTCP.The Virginia Department of Environmental Quality has characterized the City's SSES and associated SSO Control LTCP as a “Success Story”.
This paper presents the methodology and results of engineering evaluations conducted to develop the Sanitary Sewer Overflow (SSO) Long Term Control Plan (LTCP) for the City of Norfolk, Virginia. This sanitary sewer system (System) is one of the oldest in the nation with some active sewers installed in 1913; it comprises 143 sewersheds, 867 miles of pipes and 152 pumping stations within 52.4 square...
Author(s)
Peter S. FortinFederico E. MaischRick Underhill
SourceProceedings of the Water Environment Federation
SubjectSession 45: Wet Weather Issues—And There Are Plenty
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:12L.466;1-
DOI10.2175/193864704784138791
Volume / Issue2004 / 12
Content sourceWEFTEC
First / last page(s)466 - 484
Copyright2004
Word count655

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN
Pricing
Non-member price: $11.50
Member price:
-290819
Get access
-290819
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN
Abstract
This paper presents the methodology and results of engineering evaluations conducted to develop the Sanitary Sewer Overflow (SSO) Long Term Control Plan (LTCP) for the City of Norfolk, Virginia. This sanitary sewer system (System) is one of the oldest in the nation with some active sewers installed in 1913; it comprises 143 sewersheds, 867 miles of pipes and 152 pumping stations within 52.4 square miles. The LTCP needs assessment is based on the results of the field investigation program, the conditions of the sewers system assets and hydraulic modeling.The existing conditions are an indication of potential asset deficiencies (and their causes) that need to be corrected. Parameters investigated for each sewershed include: pipe age and material, defect history, estimated I/I rates, record of SSOs, manhole conditions, structural conditions, surcharging, presence of inflow sources, geographic distribution of service calls and recurrent problems, and estimated wastewater flow produced in gallons per capita per day (GPCD) for various design storms. Field information used to determine sewershed characteristics included results of: manhole inspections, flow; rainfall; and groundwater monitoring, digital imaging of sewers and smoke testing. The sewershed conditions were entered into a project GIS, which was used as a tool for condition assessment.Twenty-six temporary sewer flow meters throughout the City gathered flow data from September 2001 through March 2002. October and November 2001 were the driest months with accumulated monthly rainfall of 0.8 and 0.15 inches, respectively and were used for determining the dry weather Average Daily Flow (ADF). Dry day flows recorded at 15-minute intervals were averaged to determine the shape of the diurnal curve for each area and to estimate infiltration. The RDI/I factor, expressed as a percentage of the total accumulated rainfall that entered the System, ranged from 0.1% to 5.3% with an average of 1.3% for all of the monitoring sites. This RDI/I factor was applied to other storms such as the 2, 10, and 25-year return frequency rainfall events.Water consumption data for the period of February 2001 through March 2002 was used to determine the portion of metered water consumption returned to the sewer system as sewage flow. Sewage Return Factors (SRFs) were developed for each sewershed based on land use. The SRF for Primarily Residential use is 80% and for Mixed Use is 87%. Dry weather infiltration in each sewershed was estimated by multiplying the sewershed land area by a unit infiltration rate. Infiltration rates for individual sewersheds range from a low of 14% to a high of 70% of ADF. The estimated total dry weather infiltration flow is 7.9 MGD, which is about 40% of the estimated dry weather ADF of 19.7 MGD.The rating of the asset conditions determines the relative need for corrective actions in each sewershed and was based on the individual ratings for parameters such as: pipe age, pipe material, defect history, DWF infiltration, SSOs on record, manhole conditions1, manholes surcharged, % manholes subject to inflow, % houselines CCTV inspected2, records of service calls and wastewater flow expressed in GPCD for the 1-year storm.Hydraulic Modeling results indicated that flows closely matched the actual metered flows during Wet Weather. To estimate the performance of the System under wet weather flows the storms with frequencies of recurrence of 1, 2, 10 and 25 years were superimposed on the ADF. Results of these simulations were used to identify the System capacity and rehabilitation needs for SSO Control.Each of the sewersheds was evaluated based on application of the field program results, hydraulic modeling results and a detailed assessment of the sewer system asset conditions. Project priority ratings were used to establish priorities for gravity sewers, pumping stations and force mains. The resulting projects were organized into the City's SSO LTCP.The Virginia Department of Environmental Quality has characterized the City's SSES and associated SSO Control LTCP as a “Success Story”.
This paper presents the methodology and results of engineering evaluations conducted to develop the Sanitary Sewer Overflow (SSO) Long Term Control Plan (LTCP) for the City of Norfolk, Virginia. This sanitary sewer system (System) is one of the oldest in the nation with some active sewers installed in 1913; it comprises 143 sewersheds, 867 miles of pipes and 152 pumping stations within 52.4 square...
Author(s)
Peter S. FortinFederico E. MaischRick Underhill
SourceProceedings of the Water Environment Federation
SubjectSession 45: Wet Weather Issues—And There Are Plenty
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:12L.466;1-
DOI10.2175/193864704784138791
Volume / Issue2004 / 12
Content sourceWEFTEC
First / last page(s)466 - 484
Copyright2004
Word count655

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Peter S. Fortin# Federico E. Maisch# Rick Underhill. KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 2 Jul. 2025. <https://www.accesswater.org?id=-290819CITANCHOR>.
Peter S. Fortin# Federico E. Maisch# Rick Underhill. KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 2, 2025. https://www.accesswater.org/?id=-290819CITANCHOR.
Peter S. Fortin# Federico E. Maisch# Rick Underhill
KEEP IT IN THE PIPE - A SUCCESSFUL METHODOLOGY FOR CONDUCTING A SSES AND DEVELOPING A COST EFFECTIVE SSO LONG TERM CONTROL PLAN
Access Water
Water Environment Federation
December 22, 2018
July 2, 2025
https://www.accesswater.org/?id=-290819CITANCHOR