lastID = -290826
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 18:31:11 Adam Phillips
  • 2022-05-06 18:31:10 Adam Phillips
  • 2020-01-31 20:51:19 Administrator
  • 2020-01-31 20:51:18 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study

Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study

Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study
Abstract
Pogues Run is an 11 mile long urban stream, with an approximately 13 square mile watershed, which drains into the White River near downtown Indianapolis. The lower portion of Pogues Run is enclosed in 2.2 miles of underground Box Culvert through downtown Indianapolis.Due to limited capacity, the Box Culvert entrance would overtop during extreme flooding events, creating potential overland flow through downtown Indianapolis and near-east side neighborhoods. The resulting regulatory floodplain severely limited the City's revitalization and development efforts for impacted areas. In addition to flooding, Pogues Run suffers from unfavorable water quality. While these water quality problems may not be entirely traced to the CSO discharges, water quality in Pogues Run and the White River has seriously deteriorated as a result of the 23 CSO outfalls along Pogues Run.To address the problems facing Pogues Run, a multi-million dollar comprehensive plan has been formulated into three (3) phases. Phase 1 includes construction of two multi-purpose flood control basins, channel improvements, and removal/replacement of several bridges. Phase 2 includes consolidation, modification, and reduction of several Pogues Run CSOs. Phase 3 includes the conversion of the Pogues Run Box Culvert into a CSO storage facility.Due to the multi-objective nature of the project and its funding needs, many agencies and neighborhood groups with varied and potentially conflicting interests were involved. Issues such as short-term funding, handling special waste, compensatory wetland creation, allowance for dam overtopping, and even the project's name and purpose had to be dealt with.Implementation for several elements of Phase 1 projects has been started. Construction of both multi-purpose flood control basins has been completed. During construction of the second basin, large amounts of Asbestos Containing Material (ACM) were discovered. This necessitated the redesign of the second basin, in order to avoid disturbance to the ACM area. The City of Indianapolis, in cooperation with the Indiana DOT (INDOT) and the design consultant, developed a solution which would compensate for flood storage lost due to the avoidance of the ACM area. A Memorandum of Understanding was negotiated between the City of Indianapolis and INDOT to clarify the responsibilities of both parties for proposed revisions to the design, allowing for the successful completion of the project.The paper and presentation will focus on the challenges involved with the project during the design and construction of the two multi-purpose flood control basins included in Phase 1 of the project along with the ongoing work of Phases 2 and 3.
Pogues Run is an 11 mile long urban stream, with an approximately 13 square mile watershed, which drains into the White River near downtown Indianapolis. The lower portion of Pogues Run is enclosed in 2.2 miles of underground Box Culvert through downtown Indianapolis.Due to limited capacity, the Box Culvert entrance would overtop during extreme flooding events, creating potential overland flow...
Author(s)
David L. McCormickJeremy R. MorrisCarlton RaySandy Shafer
SourceProceedings of the Water Environment Federation
SubjectSession 46: Monitoring for Watershed Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:12L.569;1-
DOI10.2175/193864704784138728
Volume / Issue2004 / 12
Content sourceWEFTEC
First / last page(s)569 - 582
Copyright2004
Word count420

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study
Pricing
Non-member price: $11.50
Member price:
-290826
Get access
-290826
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study
Abstract
Pogues Run is an 11 mile long urban stream, with an approximately 13 square mile watershed, which drains into the White River near downtown Indianapolis. The lower portion of Pogues Run is enclosed in 2.2 miles of underground Box Culvert through downtown Indianapolis.Due to limited capacity, the Box Culvert entrance would overtop during extreme flooding events, creating potential overland flow through downtown Indianapolis and near-east side neighborhoods. The resulting regulatory floodplain severely limited the City's revitalization and development efforts for impacted areas. In addition to flooding, Pogues Run suffers from unfavorable water quality. While these water quality problems may not be entirely traced to the CSO discharges, water quality in Pogues Run and the White River has seriously deteriorated as a result of the 23 CSO outfalls along Pogues Run.To address the problems facing Pogues Run, a multi-million dollar comprehensive plan has been formulated into three (3) phases. Phase 1 includes construction of two multi-purpose flood control basins, channel improvements, and removal/replacement of several bridges. Phase 2 includes consolidation, modification, and reduction of several Pogues Run CSOs. Phase 3 includes the conversion of the Pogues Run Box Culvert into a CSO storage facility.Due to the multi-objective nature of the project and its funding needs, many agencies and neighborhood groups with varied and potentially conflicting interests were involved. Issues such as short-term funding, handling special waste, compensatory wetland creation, allowance for dam overtopping, and even the project's name and purpose had to be dealt with.Implementation for several elements of Phase 1 projects has been started. Construction of both multi-purpose flood control basins has been completed. During construction of the second basin, large amounts of Asbestos Containing Material (ACM) were discovered. This necessitated the redesign of the second basin, in order to avoid disturbance to the ACM area. The City of Indianapolis, in cooperation with the Indiana DOT (INDOT) and the design consultant, developed a solution which would compensate for flood storage lost due to the avoidance of the ACM area. A Memorandum of Understanding was negotiated between the City of Indianapolis and INDOT to clarify the responsibilities of both parties for proposed revisions to the design, allowing for the successful completion of the project.The paper and presentation will focus on the challenges involved with the project during the design and construction of the two multi-purpose flood control basins included in Phase 1 of the project along with the ongoing work of Phases 2 and 3.
Pogues Run is an 11 mile long urban stream, with an approximately 13 square mile watershed, which drains into the White River near downtown Indianapolis. The lower portion of Pogues Run is enclosed in 2.2 miles of underground Box Culvert through downtown Indianapolis.Due to limited capacity, the Box Culvert entrance would overtop during extreme flooding events, creating potential overland flow...
Author(s)
David L. McCormickJeremy R. MorrisCarlton RaySandy Shafer
SourceProceedings of the Water Environment Federation
SubjectSession 46: Monitoring for Watershed Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:12L.569;1-
DOI10.2175/193864704784138728
Volume / Issue2004 / 12
Content sourceWEFTEC
First / last page(s)569 - 582
Copyright2004
Word count420

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
David L. McCormick# Jeremy R. Morris# Carlton Ray# Sandy Shafer. Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-290826CITANCHOR>.
David L. McCormick# Jeremy R. Morris# Carlton Ray# Sandy Shafer. Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-290826CITANCHOR.
David L. McCormick# Jeremy R. Morris# Carlton Ray# Sandy Shafer
Challenges in the Design and Construction of a Multi-Objective Water Resources Project: A Case Study
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-290826CITANCHOR