lastID = -290842
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:31:23 Adam Phillips
  • 2022-05-06 11:31:22 Adam Phillips
  • 2020-02-01 02:36:44 Administrator
  • 2020-02-01 02:36:43 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS

OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS

OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS
Abstract
Secondary clarifier performance at Michelson Water Reclamation Plant (MWRP) has been the subject of many studies over the last decade. Improving the performance of the clarifiers is crucial for enhancing the performance of the plant in general and the downstream tertiary filters in particular. The secondary clarifiers also represent the main treatment capacity bottleneck in the activated sludge process at the plant. Increasing secondary clarifier capacity would unlock the capacity of the whole treatment plant and increase the production of recycled water.In 2001, Irvine Ranch Water District (IRWD) initiated a project to optimize the secondary clarifiers. The project included field testing, mathematical modeling, design and construction of clarifier modifications and performance verification testing. Based on the field-testing and mathematical modeling, the most cost effective modifications were identified, designed and constructed. A parallel comparison between a modified and an unmodified clarifier indicated that modifications have improved performance and reduced effluent suspended solids concentration by more than 80 percent. Stress testing indicated that modifications have increased clarifier capacity significantly, by approximately 30 percent from 13.5 mgd to 17.5 mgd. As a result of the improved performance, the District revised its plan of building two new secondary clarifiers to building only one new secondary clarifier.
Secondary clarifier performance at Michelson Water Reclamation Plant (MWRP) has been the subject of many studies over the last decade. Improving the performance of the clarifiers is crucial for enhancing the performance of the plant in general and the downstream tertiary filters in particular. The secondary clarifiers also represent the main treatment capacity bottleneck in the activated sludge...
Author(s)
Chuck BorkmanKelly LewH.Z. GergesBruce Willey
SourceProceedings of the Water Environment Federation
SubjectSession 42: Primary and Secondary Clarifiers
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:12L.96;1-
DOI10.2175/193864704784138719
Volume / Issue2004 / 12
Content sourceWEFTEC
First / last page(s)96 - 105
Copyright2004
Word count215

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS
Pricing
Non-member price: $11.50
Member price:
-290842
Get access
-290842
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS
Abstract
Secondary clarifier performance at Michelson Water Reclamation Plant (MWRP) has been the subject of many studies over the last decade. Improving the performance of the clarifiers is crucial for enhancing the performance of the plant in general and the downstream tertiary filters in particular. The secondary clarifiers also represent the main treatment capacity bottleneck in the activated sludge process at the plant. Increasing secondary clarifier capacity would unlock the capacity of the whole treatment plant and increase the production of recycled water.In 2001, Irvine Ranch Water District (IRWD) initiated a project to optimize the secondary clarifiers. The project included field testing, mathematical modeling, design and construction of clarifier modifications and performance verification testing. Based on the field-testing and mathematical modeling, the most cost effective modifications were identified, designed and constructed. A parallel comparison between a modified and an unmodified clarifier indicated that modifications have improved performance and reduced effluent suspended solids concentration by more than 80 percent. Stress testing indicated that modifications have increased clarifier capacity significantly, by approximately 30 percent from 13.5 mgd to 17.5 mgd. As a result of the improved performance, the District revised its plan of building two new secondary clarifiers to building only one new secondary clarifier.
Secondary clarifier performance at Michelson Water Reclamation Plant (MWRP) has been the subject of many studies over the last decade. Improving the performance of the clarifiers is crucial for enhancing the performance of the plant in general and the downstream tertiary filters in particular. The secondary clarifiers also represent the main treatment capacity bottleneck in the activated sludge...
Author(s)
Chuck BorkmanKelly LewH.Z. GergesBruce Willey
SourceProceedings of the Water Environment Federation
SubjectSession 42: Primary and Secondary Clarifiers
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:12L.96;1-
DOI10.2175/193864704784138719
Volume / Issue2004 / 12
Content sourceWEFTEC
First / last page(s)96 - 105
Copyright2004
Word count215

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Chuck Borkman# Kelly Lew# H.Z. Gerges# Bruce Willey. OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 12 Jun. 2025. <https://www.accesswater.org?id=-290842CITANCHOR>.
Chuck Borkman# Kelly Lew# H.Z. Gerges# Bruce Willey. OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 12, 2025. https://www.accesswater.org/?id=-290842CITANCHOR.
Chuck Borkman# Kelly Lew# H.Z. Gerges# Bruce Willey
OPTIMIZING CLARIFIER INLET AND OUTLET ARRANGEMENTS LEADS TO IMPROVED PERFORMANCE AND BIG SAVINGS
Access Water
Water Environment Federation
December 22, 2018
June 12, 2025
https://www.accesswater.org/?id=-290842CITANCHOR