lastID = -291276
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-27 00:06:01 Adam Phillips
  • 2020-03-27 00:06:00 Adam Phillips
  • 2020-02-01 03:12:31 Administrator
  • 2020-02-01 03:12:30 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES

PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES

PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES
Abstract
The City of Los Angeles Hyperion Wastewater Treatment Plant (HTP), located on the pacific coast, is surrounded by densely populated upscale residential communities. Odors and pollutant emissions are a prime concern for HTP and the Primary Clarifiers are a significant potential source of odors and emissions.Currently, the Primary Clarifiers are served by three separate odor control facilities with a combined ventilation rate of 31,200 cubic feet per minute (cfm). The existing odor control facilities consist of single stage wet scrubbers, followed by carbon adsorbers. The existing facilities are old and outdated, requiring extensive and escalating maintenance and operation expenses. Furthermore, measurements indicate an average hydrogen sulfide (H2S) removal rate below of the required by the process description, is being achieved by the exiting system.The potential for increasing odor complaints from the neighboring residential community, as well as the need to modernize the aging facilities, triggered extensive studies of the Primary Clarifier air scrubbing systems. After extensive investigations, pilot programs and studies, the City of Los Angeles Bureau of Engineering designed and is in the process of constructing a single, centralized odor control facility for its Primary Clarification process. The new facility will employ a 3-stage wet chemical scrubber followed by carbon adsorption vessels. When constructed, the new facility will exhaust and treat 120,000 scfm of foul air, providing a Primary Clarifier ventilation rate of six (6) air changes per hour.An extensive network of fiberglass ducts and control dampers will convey foul air from each Primary Clarifier to the Centralized Primary Clarifier Air Treatment System via a main supply duct. The new centralized facility will consist of six (6) independent trains. Each train includes: a stainless steel centrifugal fan, a fiberglass reinforced plastic (FRP) 3- Stage Chemical Scrubber and two FRP double-bed Carbon Adsorption vessels.Each fan draws foul air from the main 7-foot diameter collector duct routed 20-feet above ground. Foul air enters the first stage of the chemical scrubber where contact with a mixture of re-circulation and fresh sodium hydroxide (NaOH) and sodium hypochlorite (NaOCl) occurs. In the second stage, provisions are made to use a solution of sulfuric acid (H2SO4) & NaOCl to minimize chemical consumption. The third stage uses NaOH to reduce residual chlorine odors.After exiting the 3-stage scrubber, the air stream enters the two double-bed carbon adsorption towers, which are operated in parallel. The activated carbon functions as a polisher to remove the remaining sulfur compounds, VOC's and odors.HTP has a chemical distribution system, which supplies chemicals to the local tanks at this facility. These tanks hold a 5 to 7 day supply of chemicals, which are fed to the scrubbers by gravity.Aside from the improved odor control, the benefits of this project include reduced operation and maintenance costs due to consolidation of three facilities into one. In addition, the modular design of the 3-stage scrubber simplifies design and construction of the facility. It also allows for the standardization of the equipment.The estimated construction cost is 6,500,000 and should take approximately 12 months to build. When completed, the City of Los Angeles Hyperion Wastewater Treatment Plant will own a state of the art foul air treatment facility.
The City of Los Angeles Hyperion Wastewater Treatment Plant (HTP), located on the pacific coast, is surrounded by densely populated upscale residential communities. Odors and pollutant emissions are a prime concern for HTP and the Primary Clarifiers are a significant potential source of odors and emissions.Currently, the Primary Clarifiers are served by three separate odor control facilities with...
Author(s)
Roman VerbaAlfred MataVarouj AbkianR. Tim Haug
SourceProceedings of the Water Environment Federation
SubjectSession 5: Multi-Staged Odor Control Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:3L.362;1-
DOI10.2175/193864704784327494
Volume / Issue2004 / 3
Content sourceOdors and Air Pollutants Conference
First / last page(s)362 - 369
Copyright2004
Word count537

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES
Pricing
Non-member price: $11.50
Member price:
-291276
Get access
-291276
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES
Abstract
The City of Los Angeles Hyperion Wastewater Treatment Plant (HTP), located on the pacific coast, is surrounded by densely populated upscale residential communities. Odors and pollutant emissions are a prime concern for HTP and the Primary Clarifiers are a significant potential source of odors and emissions.Currently, the Primary Clarifiers are served by three separate odor control facilities with a combined ventilation rate of 31,200 cubic feet per minute (cfm). The existing odor control facilities consist of single stage wet scrubbers, followed by carbon adsorbers. The existing facilities are old and outdated, requiring extensive and escalating maintenance and operation expenses. Furthermore, measurements indicate an average hydrogen sulfide (H2S) removal rate below of the required by the process description, is being achieved by the exiting system.The potential for increasing odor complaints from the neighboring residential community, as well as the need to modernize the aging facilities, triggered extensive studies of the Primary Clarifier air scrubbing systems. After extensive investigations, pilot programs and studies, the City of Los Angeles Bureau of Engineering designed and is in the process of constructing a single, centralized odor control facility for its Primary Clarification process. The new facility will employ a 3-stage wet chemical scrubber followed by carbon adsorption vessels. When constructed, the new facility will exhaust and treat 120,000 scfm of foul air, providing a Primary Clarifier ventilation rate of six (6) air changes per hour.An extensive network of fiberglass ducts and control dampers will convey foul air from each Primary Clarifier to the Centralized Primary Clarifier Air Treatment System via a main supply duct. The new centralized facility will consist of six (6) independent trains. Each train includes: a stainless steel centrifugal fan, a fiberglass reinforced plastic (FRP) 3- Stage Chemical Scrubber and two FRP double-bed Carbon Adsorption vessels.Each fan draws foul air from the main 7-foot diameter collector duct routed 20-feet above ground. Foul air enters the first stage of the chemical scrubber where contact with a mixture of re-circulation and fresh sodium hydroxide (NaOH) and sodium hypochlorite (NaOCl) occurs. In the second stage, provisions are made to use a solution of sulfuric acid (H2SO4) & NaOCl to minimize chemical consumption. The third stage uses NaOH to reduce residual chlorine odors.After exiting the 3-stage scrubber, the air stream enters the two double-bed carbon adsorption towers, which are operated in parallel. The activated carbon functions as a polisher to remove the remaining sulfur compounds, VOC's and odors.HTP has a chemical distribution system, which supplies chemicals to the local tanks at this facility. These tanks hold a 5 to 7 day supply of chemicals, which are fed to the scrubbers by gravity.Aside from the improved odor control, the benefits of this project include reduced operation and maintenance costs due to consolidation of three facilities into one. In addition, the modular design of the 3-stage scrubber simplifies design and construction of the facility. It also allows for the standardization of the equipment.The estimated construction cost is 6,500,000 and should take approximately 12 months to build. When completed, the City of Los Angeles Hyperion Wastewater Treatment Plant will own a state of the art foul air treatment facility.
The City of Los Angeles Hyperion Wastewater Treatment Plant (HTP), located on the pacific coast, is surrounded by densely populated upscale residential communities. Odors and pollutant emissions are a prime concern for HTP and the Primary Clarifiers are a significant potential source of odors and emissions.Currently, the Primary Clarifiers are served by three separate odor control facilities with...
Author(s)
Roman VerbaAlfred MataVarouj AbkianR. Tim Haug
SourceProceedings of the Water Environment Federation
SubjectSession 5: Multi-Staged Odor Control Systems
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2004
ISSN1938-6478
SICI1938-6478(20040101)2004:3L.362;1-
DOI10.2175/193864704784327494
Volume / Issue2004 / 3
Content sourceOdors and Air Pollutants Conference
First / last page(s)362 - 369
Copyright2004
Word count537

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Roman Verba# Alfred Mata# Varouj Abkian# R. Tim Haug. PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 9 Jul. 2025. <https://www.accesswater.org?id=-291276CITANCHOR>.
Roman Verba# Alfred Mata# Varouj Abkian# R. Tim Haug. PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 9, 2025. https://www.accesswater.org/?id=-291276CITANCHOR.
Roman Verba# Alfred Mata# Varouj Abkian# R. Tim Haug
PRIMARY BATTERIES ODOR CONTROL CENTRALIZATION AT THE HYPERION WASTEWTER TREATMENT PLANT OF THE CITY OF LOS ANGELES
Access Water
Water Environment Federation
December 22, 2018
July 9, 2025
https://www.accesswater.org/?id=-291276CITANCHOR