lastID = -291818
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-02-01 03:50:54 Administrator
  • 2020-02-01 03:50:53 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR

REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR

REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR
Abstract
General Description Many wastewater utilities use an abbreviated period of the year upon which to base the calculation of customer account sewer charges. However, the recalculation of the actual charge usually does not occur for some time after the period of the rate calculations. The actual rate which will be used to calculate the charge is most often approved by the regulatory or rate setting authority at a period of time prior to the time of the calculation of the customer account charge. This rate is also frequently calculated using prior year system water use data since sewers are not metered. The time lapse between these two actions creates a gap whereby the actual charges when calculated will not generate the revenue upon which the rate was based.The City of Phoenix has developed a concept and process through the implementation of a “Sewer Flow Stabilization Factor” that ensures that the rate approved will always generate the revenue needed or projected. The adjustment process is defined and included in the Phoenix City Code. The City has also built into its automated billing system an automatic recalculation that includes this adjustment process. Since its inception in 1993, the City has been able to project annual wastewater revenues to within 99% accuracy. This presentation will explore the reason for the original development, the process, and its benefits as could be applied to all utilities. Who Benefits Having accurate customer sewer charges that can be adjusted to match as closely as possible the actual customer sewer flow benefits both the utility and the customer. Being able to safely adjust the sewer charge each year to match what is most appropriately matches the customers actual flow maintains a more accurate record to project sewer system and plant capacity. This, in turn, reduces the overall capital costs by helping the engineering staff of the utility better forecast needs. At the same time the customer is more satisfied that his or her sewer is being adjusted annually to better match their flow. The utility is benefited by the assurance that the revenues projected will be generated. Universal Application Any utility that uses water usage for a brief period of the year, such as December, January, and February, or any other time for that matter would benefit by considering this concept. For the process as described above, it totally eliminates the flaws inherent in customer sewer flow revenue projection.
General Description Many wastewater utilities use an abbreviated period of the year upon which to base the calculation of customer account sewer charges. However, the recalculation of the actual charge usually does not occur for some time after the period of the rate calculations. The actual rate which will be used to calculate the charge is most often approved by the regulatory or rate setting...
Author(s)
Edward G. Blundon
SourceProceedings of the Water Environment Federation
SubjectSession 41: Utility Management: Making Sure Your Income Exceeds Your Outgo: Money is What Keeps Your System Going
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:12L.3355;1-
DOI10.2175/193864705783866126
Volume / Issue2005 / 12
Content sourceWEFTEC
First / last page(s)3355 - 3365
Copyright2005
Word count408

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR
Pricing
Non-member price: $11.50
Member price:
-291818
Get access
-291818
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR
Abstract
General Description Many wastewater utilities use an abbreviated period of the year upon which to base the calculation of customer account sewer charges. However, the recalculation of the actual charge usually does not occur for some time after the period of the rate calculations. The actual rate which will be used to calculate the charge is most often approved by the regulatory or rate setting authority at a period of time prior to the time of the calculation of the customer account charge. This rate is also frequently calculated using prior year system water use data since sewers are not metered. The time lapse between these two actions creates a gap whereby the actual charges when calculated will not generate the revenue upon which the rate was based.The City of Phoenix has developed a concept and process through the implementation of a “Sewer Flow Stabilization Factor” that ensures that the rate approved will always generate the revenue needed or projected. The adjustment process is defined and included in the Phoenix City Code. The City has also built into its automated billing system an automatic recalculation that includes this adjustment process. Since its inception in 1993, the City has been able to project annual wastewater revenues to within 99% accuracy. This presentation will explore the reason for the original development, the process, and its benefits as could be applied to all utilities. Who Benefits Having accurate customer sewer charges that can be adjusted to match as closely as possible the actual customer sewer flow benefits both the utility and the customer. Being able to safely adjust the sewer charge each year to match what is most appropriately matches the customers actual flow maintains a more accurate record to project sewer system and plant capacity. This, in turn, reduces the overall capital costs by helping the engineering staff of the utility better forecast needs. At the same time the customer is more satisfied that his or her sewer is being adjusted annually to better match their flow. The utility is benefited by the assurance that the revenues projected will be generated. Universal Application Any utility that uses water usage for a brief period of the year, such as December, January, and February, or any other time for that matter would benefit by considering this concept. For the process as described above, it totally eliminates the flaws inherent in customer sewer flow revenue projection.
General Description Many wastewater utilities use an abbreviated period of the year upon which to base the calculation of customer account sewer charges. However, the recalculation of the actual charge usually does not occur for some time after the period of the rate calculations. The actual rate which will be used to calculate the charge is most often approved by the regulatory or rate setting...
Author(s)
Edward G. Blundon
SourceProceedings of the Water Environment Federation
SubjectSession 41: Utility Management: Making Sure Your Income Exceeds Your Outgo: Money is What Keeps Your System Going
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:12L.3355;1-
DOI10.2175/193864705783866126
Volume / Issue2005 / 12
Content sourceWEFTEC
First / last page(s)3355 - 3365
Copyright2005
Word count408

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Edward G. Blundon. REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 12 Jun. 2025. <https://www.accesswater.org?id=-291818CITANCHOR>.
Edward G. Blundon. REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 12, 2025. https://www.accesswater.org/?id=-291818CITANCHOR.
Edward G. Blundon
REVENUE PROTECTION: THE SEWER FLOW STABILIZATION FACTOR
Access Water
Water Environment Federation
December 22, 2018
June 12, 2025
https://www.accesswater.org/?id=-291818CITANCHOR