HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-01-31 23:51:41 Administrator
  • 2020-01-31 23:51:40 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING

HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING

HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING
Abstract
King County, Washington is currently designing their new 38 million-gallon-per-day (mgd) Brightwater Wastewater Treatment Plant to include membrane bioreactors (MBR) for secondary treatment, combined with enhanced primary treatment for peak flow management. Enhanced primary treatment was of interest as a method of reducing MBR size for Brightwater. The County initially selected ballasted sedimentation for the peak flow primary treatment role. Chemically enhanced primary treatment (CEPT) using conventional primary clarifiers was not initially considered a viable alternative due to low surface overflow rates assumed necessary for adequate performance. A review of reported results from CEPT operation at several plants on the west coast and King County's own past pilot efforts yielded little useful data at high SORs. However, substantial capital cost savings would be realized if CEPT proved successful at SORS of 3,500 to 5,000 gallons per day per square foot (gpd/ft2 and gpd/sf). In a separate investigation, the County was interested in the potential of CEPT to contribute to additional capacity at their East Section Reclamation Plant (South Plant). Recognizing the limited data for CEPT at high overflow rates, the County undertook further full scale pilot testing to understand both potential performance at high overflows and test new chemical blends that had been reported to significantly improve CEPT performance. Full scale testing conducted at the South Plant over the winter of 2004/2005 demonstrated BOD removals above 40 percent at surface overflow rates (SORs) of 5,000 gallons per day per square foot and above 60 percent at SORs of 3,600 gpd/ft2. Based on this outstanding performance at high surface overflow rates, the County found that CEPT was cost effective for its Brightwater Plant and selected it in lieu of ballasted flocculation. The County is currently considering the potential to re-rate South Plant to recognize significant capacity through use of CEPT for peak flow treatment.CEPT, with use of modern chemical mixtures and proper chemical dosing protocols, makes sense for intermittent usage during high flow events for a number of potential applications. Plant re-rating using the technology could avoid the construction of new treatment units in many instances.
King County, Washington is currently designing their new 38 million-gallon-per-day (mgd) Brightwater Wastewater Treatment Plant to include membrane bioreactors (MBR) for secondary treatment, combined with enhanced primary treatment for peak flow management. Enhanced primary treatment was of interest as a method of reducing MBR size for Brightwater. The County initially selected ballasted...
Author(s)
Steve KrugelHenryk Melcer
SourceProceedings of the Water Environment Federation
SubjectSession 31: Municipal Wastewater Treatment Processes: Primary and Secondary Clarifiers
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:13L.2596;1-
DOI10.2175/193864705783865505
Volume / Issue2005 / 13
Content sourceWEFTEC
First / last page(s)2596 - 2609
Copyright2005
Word count361

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING
Pricing
Non-member price: $11.50
Member price:
-291923
Get access
-291923
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING
Abstract
King County, Washington is currently designing their new 38 million-gallon-per-day (mgd) Brightwater Wastewater Treatment Plant to include membrane bioreactors (MBR) for secondary treatment, combined with enhanced primary treatment for peak flow management. Enhanced primary treatment was of interest as a method of reducing MBR size for Brightwater. The County initially selected ballasted sedimentation for the peak flow primary treatment role. Chemically enhanced primary treatment (CEPT) using conventional primary clarifiers was not initially considered a viable alternative due to low surface overflow rates assumed necessary for adequate performance. A review of reported results from CEPT operation at several plants on the west coast and King County's own past pilot efforts yielded little useful data at high SORs. However, substantial capital cost savings would be realized if CEPT proved successful at SORS of 3,500 to 5,000 gallons per day per square foot (gpd/ft2 and gpd/sf). In a separate investigation, the County was interested in the potential of CEPT to contribute to additional capacity at their East Section Reclamation Plant (South Plant). Recognizing the limited data for CEPT at high overflow rates, the County undertook further full scale pilot testing to understand both potential performance at high overflows and test new chemical blends that had been reported to significantly improve CEPT performance. Full scale testing conducted at the South Plant over the winter of 2004/2005 demonstrated BOD removals above 40 percent at surface overflow rates (SORs) of 5,000 gallons per day per square foot and above 60 percent at SORs of 3,600 gpd/ft2. Based on this outstanding performance at high surface overflow rates, the County found that CEPT was cost effective for its Brightwater Plant and selected it in lieu of ballasted flocculation. The County is currently considering the potential to re-rate South Plant to recognize significant capacity through use of CEPT for peak flow treatment.CEPT, with use of modern chemical mixtures and proper chemical dosing protocols, makes sense for intermittent usage during high flow events for a number of potential applications. Plant re-rating using the technology could avoid the construction of new treatment units in many instances.
King County, Washington is currently designing their new 38 million-gallon-per-day (mgd) Brightwater Wastewater Treatment Plant to include membrane bioreactors (MBR) for secondary treatment, combined with enhanced primary treatment for peak flow management. Enhanced primary treatment was of interest as a method of reducing MBR size for Brightwater. The County initially selected ballasted...
Author(s)
Steve KrugelHenryk Melcer
SourceProceedings of the Water Environment Federation
SubjectSession 31: Municipal Wastewater Treatment Processes: Primary and Secondary Clarifiers
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:13L.2596;1-
DOI10.2175/193864705783865505
Volume / Issue2005 / 13
Content sourceWEFTEC
First / last page(s)2596 - 2609
Copyright2005
Word count361

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Steve Krugel# Henryk Melcer. HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 1 Oct. 2025. <https://www.accesswater.org?id=-291923CITANCHOR>.
Steve Krugel# Henryk Melcer. HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 1, 2025. https://www.accesswater.org/?id=-291923CITANCHOR.
Steve Krugel# Henryk Melcer
HIGH RATE CHEMICALLY ENHANCED PRIMARY TREATMENT AS A TOOL FOR WET WEATHER PLANT OPTIMIZATION AND RE-RATING
Access Water
Water Environment Federation
December 22, 2018
October 1, 2025
https://www.accesswater.org/?id=-291923CITANCHOR