lastID = -292113
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 18:42:00 Adam Phillips
  • 2020-01-31 18:48:09 Administrator
  • 2020-01-31 18:48:08 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE

A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE

A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE
Abstract
Historic mining activities at the London Fault Mine in Park County, Colorado, generate uncontrolled mine drainage which impacts water quality in South Mosquito Creek and Mosquito Creek. Water quality impacts have lead to 303(d) listing for both streams based on exceedances of chronic zinc table value water quality standards and the need for a total maximum daily load (TMDL). Historically, zinc concentrations in South Mosquito Creek zinc ranged from 110 µg/L to 749 µg/L and 95 µg/L to 750 µg/L in Mosquito Creek. The chronic zinc table value standards for South Mosquito Creek and Mosquito Creek are 250 µg/L and 110 µg/L, respectively.Historically, two mine adits at the London Fault Mine, the Extension Tunnel and the Water Tunnel, have had uncontrolled discharges of metals laden water to South Mosquito Creek which impacts the quality of Mosquito Creek, located downstream. Currently, only the Water Tunnel is permitted under the Colorado Discharge Permit System and the Extension Tunnel is unregulated, but provides a zinc load to South Mosquito Creek five times greater than the Water Tunnel. Since multiple years of discharge permit negotiations for the Extension Tunnel have been unsuccessful, alternative approaches to regulate both discharges were investigated, including obtaining funding from the owner (THF Reality) of the water right at the Water Tunnel to support site-specific studies.Since limited funding was available from the owner of the London Fault Mine, Brown and Caldwell, through support from THF Reality, developed a multi-pronged approach to support appropriate South Mosquito Creek and Mosquito Creek beneficial uses while cost effectively allowing the Water Tunnel discharge to provide augmentation water for downstream water supply needs. The multi-pronged approach included: (1) evaluating treatment alternatives for both the Extension Tunnel and Water Tunnel to meet the proposed draft TMDL wasteload allocation for zinc; and (2) develop site-specific zinc water quality standards to reflect South Mosquito Creek and Mosquito Creek actual physical, chemical and biological conditions.Through the multi-pronged process a technology-based approach was developed and approved by the Colorado Water Quality Control Division and Commission. The technology-based approach focused on developing site-specific chronic zinc water quality standards using ambient (85th percentile) water quality as the standard, with treatment of the Extension Tunnel discharge. This approach provided substantial improvements to South Mosquito Creek and Mosquito Creek water quality, substantial cost savings by treating the Extension Tunnel discharge versus the Water Tunnel discharge and TMDL compliance.
Historic mining activities at the London Fault Mine in Park County, Colorado, generate uncontrolled mine drainage which impacts water quality in South Mosquito Creek and Mosquito Creek. Water quality impacts have lead to 303(d) listing for both streams based on exceedances of chronic zinc table value water quality standards and the need for a total maximum daily load (TMDL). Historically, zinc...
Author(s)
Bret Linenfelser
SourceProceedings of the Water Environment Federation
SubjectSession 9: Surface Water Quality & Ecology: Permitting - There are Options
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:16L.860;1-
DOI10.2175/193864705783868214
Volume / Issue2005 / 16
Content sourceWEFTEC
First / last page(s)860 - 876
Copyright2005
Word count409

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE
Pricing
Non-member price: $11.50
Member price:
-292113
Get access
-292113
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE
Abstract
Historic mining activities at the London Fault Mine in Park County, Colorado, generate uncontrolled mine drainage which impacts water quality in South Mosquito Creek and Mosquito Creek. Water quality impacts have lead to 303(d) listing for both streams based on exceedances of chronic zinc table value water quality standards and the need for a total maximum daily load (TMDL). Historically, zinc concentrations in South Mosquito Creek zinc ranged from 110 µg/L to 749 µg/L and 95 µg/L to 750 µg/L in Mosquito Creek. The chronic zinc table value standards for South Mosquito Creek and Mosquito Creek are 250 µg/L and 110 µg/L, respectively.Historically, two mine adits at the London Fault Mine, the Extension Tunnel and the Water Tunnel, have had uncontrolled discharges of metals laden water to South Mosquito Creek which impacts the quality of Mosquito Creek, located downstream. Currently, only the Water Tunnel is permitted under the Colorado Discharge Permit System and the Extension Tunnel is unregulated, but provides a zinc load to South Mosquito Creek five times greater than the Water Tunnel. Since multiple years of discharge permit negotiations for the Extension Tunnel have been unsuccessful, alternative approaches to regulate both discharges were investigated, including obtaining funding from the owner (THF Reality) of the water right at the Water Tunnel to support site-specific studies.Since limited funding was available from the owner of the London Fault Mine, Brown and Caldwell, through support from THF Reality, developed a multi-pronged approach to support appropriate South Mosquito Creek and Mosquito Creek beneficial uses while cost effectively allowing the Water Tunnel discharge to provide augmentation water for downstream water supply needs. The multi-pronged approach included: (1) evaluating treatment alternatives for both the Extension Tunnel and Water Tunnel to meet the proposed draft TMDL wasteload allocation for zinc; and (2) develop site-specific zinc water quality standards to reflect South Mosquito Creek and Mosquito Creek actual physical, chemical and biological conditions.Through the multi-pronged process a technology-based approach was developed and approved by the Colorado Water Quality Control Division and Commission. The technology-based approach focused on developing site-specific chronic zinc water quality standards using ambient (85th percentile) water quality as the standard, with treatment of the Extension Tunnel discharge. This approach provided substantial improvements to South Mosquito Creek and Mosquito Creek water quality, substantial cost savings by treating the Extension Tunnel discharge versus the Water Tunnel discharge and TMDL compliance.
Historic mining activities at the London Fault Mine in Park County, Colorado, generate uncontrolled mine drainage which impacts water quality in South Mosquito Creek and Mosquito Creek. Water quality impacts have lead to 303(d) listing for both streams based on exceedances of chronic zinc table value water quality standards and the need for a total maximum daily load (TMDL). Historically, zinc...
Author(s)
Bret Linenfelser
SourceProceedings of the Water Environment Federation
SubjectSession 9: Surface Water Quality & Ecology: Permitting - There are Options
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:16L.860;1-
DOI10.2175/193864705783868214
Volume / Issue2005 / 16
Content sourceWEFTEC
First / last page(s)860 - 876
Copyright2005
Word count409

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Bret Linenfelser. A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-292113CITANCHOR>.
Bret Linenfelser. A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-292113CITANCHOR.
Bret Linenfelser
A COMBINED USE ATTAINABILITY ANALYSIS AND TECHNOLOGY-BASED APPROACH TO SETTING ZINC STANDARDS FOR TMDL COMPLIANCE
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-292113CITANCHOR