lastID = -292433
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:27:57 Adam Phillips
  • 2022-05-04 21:27:56 Adam Phillips
  • 2020-03-26 22:13:43 Adam Phillips
  • 2020-03-26 22:13:42 Adam Phillips
  • 2020-02-01 00:25:58 Administrator
  • 2020-02-01 00:25:57 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON

INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON

INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON
Abstract
Infiltration and inflow (I/I) of clean water into the sanitary sewer system affects the required capacity of wastewater conveyance and treatment facilities. Faced with the high cost of adding system capacity, the Wastewater Treatment Division in King County, Washington initiated a multi-year Regional I/I Control Program. Ten “pilot projects” were conducted in selected drainage basins to demonstrate the cost effectiveness of rehabilitating the existing sewer system compared with the cost of new facilities. Pre-rehabilitation flow monitoring data were collected to target locations for the pilot rehabilitation projects, and the County collaborated with local agencies to select candidate pilot projects.Based on detailed Sanitary Sewer Evaluation Surveys (SSES), designers selected sewer mains, manholes, laterals, and side sewer components for rehabilitation, and used primarily trenchless rehabilitation techniques and technologies (cured-in-place pipe (CIPP), pipe bursting, chemical grouting of manholes, service connection liners (SCLs), and service connection and lateral liners (SCLLs) to gain first-hand experience and information about sewer system repair. Pre- and post-rehabilitation rainfall and meter flow data were utilized in a model to determine rehabilitation effectiveness. Rainfall was quantified using data from a County-wide rain gauge network and estimated using CALAMAR (calculating rainfall with the aid of radar). MOUSE modeling software was used for continuous simulation of rainfall-dependent I/I and for quantifying the I/I entering the sewer system in each basin.Rehabilitation technologies produced measurable I/I reduction in 8 of the 10 pilot projects. The results suggest that a high percentage of I/I originates on private property. Where only sewer mains or manholes were rehabilitated, IyI reduction was less. The final construction cost for the pilot projects was 7.8 million. Experience some of the pilot projects showed that rehabilitating sewer mains at the same time that side sewers and laterals are rehabilitated can be done for a relatively small increase in cost.
Infiltration and inflow (I/I) of clean water into the sanitary sewer system affects the required capacity of wastewater conveyance and treatment facilities. Faced with the high cost of adding system capacity, the Wastewater Treatment Division in King County, Washington initiated a multi-year Regional I/I Control Program. Ten “pilot projects” were conducted in selected drainage basins...
Author(s)
Eric BergstromBob SwarnerMarcos Lopez
SourceProceedings of the Water Environment Federation
SubjectSession 10: I/I Deposition, and Delivery: Changing Your Approach
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:4L.600;1-
DOI10.2175/193864705784291402
Volume / Issue2005 / 4
Content sourceCollection Systems Conference
First / last page(s)600 - 623
Copyright2005
Word count311

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON
Pricing
Non-member price: $11.50
Member price:
-292433
Get access
-292433
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON
Abstract
Infiltration and inflow (I/I) of clean water into the sanitary sewer system affects the required capacity of wastewater conveyance and treatment facilities. Faced with the high cost of adding system capacity, the Wastewater Treatment Division in King County, Washington initiated a multi-year Regional I/I Control Program. Ten “pilot projects” were conducted in selected drainage basins to demonstrate the cost effectiveness of rehabilitating the existing sewer system compared with the cost of new facilities. Pre-rehabilitation flow monitoring data were collected to target locations for the pilot rehabilitation projects, and the County collaborated with local agencies to select candidate pilot projects.Based on detailed Sanitary Sewer Evaluation Surveys (SSES), designers selected sewer mains, manholes, laterals, and side sewer components for rehabilitation, and used primarily trenchless rehabilitation techniques and technologies (cured-in-place pipe (CIPP), pipe bursting, chemical grouting of manholes, service connection liners (SCLs), and service connection and lateral liners (SCLLs) to gain first-hand experience and information about sewer system repair. Pre- and post-rehabilitation rainfall and meter flow data were utilized in a model to determine rehabilitation effectiveness. Rainfall was quantified using data from a County-wide rain gauge network and estimated using CALAMAR (calculating rainfall with the aid of radar). MOUSE modeling software was used for continuous simulation of rainfall-dependent I/I and for quantifying the I/I entering the sewer system in each basin.Rehabilitation technologies produced measurable I/I reduction in 8 of the 10 pilot projects. The results suggest that a high percentage of I/I originates on private property. Where only sewer mains or manholes were rehabilitated, IyI reduction was less. The final construction cost for the pilot projects was 7.8 million. Experience some of the pilot projects showed that rehabilitating sewer mains at the same time that side sewers and laterals are rehabilitated can be done for a relatively small increase in cost.
Infiltration and inflow (I/I) of clean water into the sanitary sewer system affects the required capacity of wastewater conveyance and treatment facilities. Faced with the high cost of adding system capacity, the Wastewater Treatment Division in King County, Washington initiated a multi-year Regional I/I Control Program. Ten “pilot projects” were conducted in selected drainage basins...
Author(s)
Eric BergstromBob SwarnerMarcos Lopez
SourceProceedings of the Water Environment Federation
SubjectSession 10: I/I Deposition, and Delivery: Changing Your Approach
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:4L.600;1-
DOI10.2175/193864705784291402
Volume / Issue2005 / 4
Content sourceCollection Systems Conference
First / last page(s)600 - 623
Copyright2005
Word count311

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Eric Bergstrom# Bob Swarner# Marcos Lopez. INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 12 Jun. 2025. <https://www.accesswater.org?id=-292433CITANCHOR>.
Eric Bergstrom# Bob Swarner# Marcos Lopez. INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 12, 2025. https://www.accesswater.org/?id=-292433CITANCHOR.
Eric Bergstrom# Bob Swarner# Marcos Lopez
INFILTRATION AND INFLOW (I/I) REDUCTION IN 10 PILOT PROJECTS KING COUNTY, WASHINGTON
Access Water
Water Environment Federation
December 22, 2018
June 12, 2025
https://www.accesswater.org/?id=-292433CITANCHOR