COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 20:20:15 Adam Phillips
  • 2020-03-26 22:12:18 Adam Phillips
  • 2020-03-26 22:12:17 Adam Phillips
  • 2020-01-31 21:06:33 Administrator
  • 2020-01-31 21:06:32 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO

COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO

COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO
Abstract
There is a section of the town of Grand Junction, Colorado over five square miles in area where acombined sanitary and storm sewer system existed. The system had significant capacity constraintsduring storm events that resulted in problems with sanitary sewer conveyance, local flooding, andwastewater treatment. In 1996 the City of Grand Junction started serious planning for a project with the objective to solve the growing problems with their combined sewer system in the old part of downtown. The City was experiencing basement backups and minor overflows in the collection system, as well as increased flows at the wastewater treatment plant (WWTP) during wet weather. After considerable study, the City scoped a project to separate the sanitary and storm sewer systems.This would be done through the construction of a new storm sewer system throughout the area. The existing inlets would be utilized but disconnected from the sanitary sewer. This proposed system would then discharge into the Colorado River at five new discharge points.This Project was an exercise in careful management of many influences, resources and systems. Theengineering analysis and design of the system faced many challenges ranging from tight constraints to minimal grade to data management. From a regulatory standpoint, there were numerous obstacles and opportunities. They ranged from stormwater quality requirements as called for in NPDES Ph II to the effect of new river discharges on endangered species. There were also public relations challenges caused by ten miles of open cut construction in an extremely crowded right-of-way. Likeall projects, funding was a concern. Grant money was secured for a fixed amount for the project prior to commencement of final design. This meant that budget control through the design and construction was critical.
There is a section of the town of Grand Junction, Colorado over five square miles in area where acombined sanitary and storm sewer system existed. The system had significant capacity constraintsduring storm events that resulted in problems with sanitary sewer conveyance, local flooding, andwastewater treatment. In 1996 the City of Grand Junction started serious planning for a project with the...
Author(s)
Ken MatthewsBret GuilloryTrent Prall
SourceProceedings of the Water Environment Federation
SubjectSession 9: Effective Resource Management and Performance
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2006
ISSN1938-6478
SICI1938-6478(20060101)2006:4L.579;1-
DOI10.2175/193864706783796457
Volume / Issue2006 / 4
Content sourceCollection Systems Conference
First / last page(s)579 - 590
Copyright2006
Word count289

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO
Pricing
Non-member price: $11.50
Member price:
-293254
Get access
-293254
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO
Abstract
There is a section of the town of Grand Junction, Colorado over five square miles in area where acombined sanitary and storm sewer system existed. The system had significant capacity constraintsduring storm events that resulted in problems with sanitary sewer conveyance, local flooding, andwastewater treatment. In 1996 the City of Grand Junction started serious planning for a project with the objective to solve the growing problems with their combined sewer system in the old part of downtown. The City was experiencing basement backups and minor overflows in the collection system, as well as increased flows at the wastewater treatment plant (WWTP) during wet weather. After considerable study, the City scoped a project to separate the sanitary and storm sewer systems.This would be done through the construction of a new storm sewer system throughout the area. The existing inlets would be utilized but disconnected from the sanitary sewer. This proposed system would then discharge into the Colorado River at five new discharge points.This Project was an exercise in careful management of many influences, resources and systems. Theengineering analysis and design of the system faced many challenges ranging from tight constraints to minimal grade to data management. From a regulatory standpoint, there were numerous obstacles and opportunities. They ranged from stormwater quality requirements as called for in NPDES Ph II to the effect of new river discharges on endangered species. There were also public relations challenges caused by ten miles of open cut construction in an extremely crowded right-of-way. Likeall projects, funding was a concern. Grant money was secured for a fixed amount for the project prior to commencement of final design. This meant that budget control through the design and construction was critical.
There is a section of the town of Grand Junction, Colorado over five square miles in area where acombined sanitary and storm sewer system existed. The system had significant capacity constraintsduring storm events that resulted in problems with sanitary sewer conveyance, local flooding, andwastewater treatment. In 1996 the City of Grand Junction started serious planning for a project with the...
Author(s)
Ken MatthewsBret GuilloryTrent Prall
SourceProceedings of the Water Environment Federation
SubjectSession 9: Effective Resource Management and Performance
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2006
ISSN1938-6478
SICI1938-6478(20060101)2006:4L.579;1-
DOI10.2175/193864706783796457
Volume / Issue2006 / 4
Content sourceCollection Systems Conference
First / last page(s)579 - 590
Copyright2006
Word count289

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Ken Matthews# Bret Guillory# Trent Prall. COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 25 Jun. 2025. <https://www.accesswater.org?id=-293254CITANCHOR>.
Ken Matthews# Bret Guillory# Trent Prall. COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 25, 2025. https://www.accesswater.org/?id=-293254CITANCHOR.
Ken Matthews# Bret Guillory# Trent Prall
COMBINED SEWER ELIMINATION PROJECT GRAND JUNCTION, COLORADO
Access Water
Water Environment Federation
December 22, 2018
June 25, 2025
https://www.accesswater.org/?id=-293254CITANCHOR