Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 12:37:55 Adam Phillips
  • 2022-05-06 12:37:54 Adam Phillips
  • 2020-02-01 04:07:06 Administrator
  • 2020-02-01 04:07:05 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises

Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises

Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises
Abstract
Gwinnett County Department of Public Utilities (GCDPU) retained Hazen and Sawyer (H&S) to conduct an odor control study along the 36-inch force main from the Alcovy River Pump Station to the F. Wayne Hill Water Resources Center (WRC). Upon the completion of the initial investigation, it was concluded that the odors released from the sewer force main were significantly influenced by the force main hydraulics; specifically surging. Surging was attributed to the current operation of the Alcovy River Pump Station. A surge analysis was required to minimize or eliminate foul air release while continuing to provide surge protection for the sewer infrastructure. The issue at hand was how to mitigate foul air being released while continuing to provide surge protection for the sewer infrastructure. Odor control and surge analysis are traditionally evaluated independently because sewer collection systems are generally characterized as gravity flows with limited pressure flows. However, in this case, the force main was approximately 10 miles long.The challenge here was how to concurrently attenuate surge pressure and reduce odor through air release valves that were originally part of the surge protection system. The goal was to optimize surge protection without requiring construction of costly new odor control facilities to treat foul air. This paper will discuss the modeling simulations, recommended improvements, and present both capital and Operation and Maintenance (O&M) cost resulting in significant savings to GCDPU.A surge model was developed by taking an existing hydraulic model from WaterCAD™ and converting it to KYPIPE SURGE2006™ (University of Kentucky). Different alternatives were evaluated with the focus on maintaining a full pressure pipe while the pumps were not in operation, thereby minimizing air pockets and foul air being released through the air release valves when the pumps start or stop. Based on the model results it was recommended that a 5,300-gallon sewer-service type of bladder tank and two control valves would be needed to mitigate the foul air volume, and hence alleviate the odor problem. The bladder tank dissipated the surge within the system, while the control valves maintained a full pipe when the pumps cycled off. The project goal was achieved – the elimination of chemical treatment for odor control and the protection of the pump station and force main systems from surge.
Gwinnett County Department of Public Utilities (GCDPU) retained Hazen and Sawyer (H&S) to conduct an odor control study along the 36-inch force main from the Alcovy River Pump Station to the F. Wayne Hill Water Resources Center (WRC). Upon the completion of the initial investigation, it was concluded that the odors released from the sewer force main were significantly influenced by the force...
Author(s)
Crystal M. BongeZ. Michael Wang
SourceProceedings of the Water Environment Federation
SubjectSession 96: Emission Sources and Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2007
ISSN1938-6478
SICI1938-6478(20071001)2007:10L.7690;1-
DOI10.2175/193864707787168422
Volume / Issue2007 / 10
Content sourceWEFTEC
First / last page(s)7690 - 7703
Copyright2007
Word count389
Subject keywordsODOR CONTROLSURGEFORCE MAINPUMP CYCLE

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises
Pricing
Non-member price: $11.50
Member price:
-293618
Get access
-293618
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises
Abstract
Gwinnett County Department of Public Utilities (GCDPU) retained Hazen and Sawyer (H&S) to conduct an odor control study along the 36-inch force main from the Alcovy River Pump Station to the F. Wayne Hill Water Resources Center (WRC). Upon the completion of the initial investigation, it was concluded that the odors released from the sewer force main were significantly influenced by the force main hydraulics; specifically surging. Surging was attributed to the current operation of the Alcovy River Pump Station. A surge analysis was required to minimize or eliminate foul air release while continuing to provide surge protection for the sewer infrastructure. The issue at hand was how to mitigate foul air being released while continuing to provide surge protection for the sewer infrastructure. Odor control and surge analysis are traditionally evaluated independently because sewer collection systems are generally characterized as gravity flows with limited pressure flows. However, in this case, the force main was approximately 10 miles long.The challenge here was how to concurrently attenuate surge pressure and reduce odor through air release valves that were originally part of the surge protection system. The goal was to optimize surge protection without requiring construction of costly new odor control facilities to treat foul air. This paper will discuss the modeling simulations, recommended improvements, and present both capital and Operation and Maintenance (O&M) cost resulting in significant savings to GCDPU.A surge model was developed by taking an existing hydraulic model from WaterCAD™ and converting it to KYPIPE SURGE2006™ (University of Kentucky). Different alternatives were evaluated with the focus on maintaining a full pressure pipe while the pumps were not in operation, thereby minimizing air pockets and foul air being released through the air release valves when the pumps start or stop. Based on the model results it was recommended that a 5,300-gallon sewer-service type of bladder tank and two control valves would be needed to mitigate the foul air volume, and hence alleviate the odor problem. The bladder tank dissipated the surge within the system, while the control valves maintained a full pipe when the pumps cycled off. The project goal was achieved – the elimination of chemical treatment for odor control and the protection of the pump station and force main systems from surge.
Gwinnett County Department of Public Utilities (GCDPU) retained Hazen and Sawyer (H&S) to conduct an odor control study along the 36-inch force main from the Alcovy River Pump Station to the F. Wayne Hill Water Resources Center (WRC). Upon the completion of the initial investigation, it was concluded that the odors released from the sewer force main were significantly influenced by the force...
Author(s)
Crystal M. BongeZ. Michael Wang
SourceProceedings of the Water Environment Federation
SubjectSession 96: Emission Sources and Control
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2007
ISSN1938-6478
SICI1938-6478(20071001)2007:10L.7690;1-
DOI10.2175/193864707787168422
Volume / Issue2007 / 10
Content sourceWEFTEC
First / last page(s)7690 - 7703
Copyright2007
Word count389
Subject keywordsODOR CONTROLSURGEFORCE MAINPUMP CYCLE

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2025 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Crystal M. Bonge# Z. Michael Wang. Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises. Water Environment Federation, 2018. Web. 25 Oct. 2025. <https://www.accesswater.org?id=-293618CITANCHOR>.
Crystal M. Bonge# Z. Michael Wang. Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises. Water Environment Federation, 2018. Accessed October 25, 2025. https://www.accesswater.org/?id=-293618CITANCHOR.
Crystal M. Bonge# Z. Michael Wang
Sewer Force Main Odor Control and Surge Analysis: A Case Study for Optimum Design without Compromises
Access Water
Water Environment Federation
December 22, 2018
October 25, 2025
https://www.accesswater.org/?id=-293618CITANCHOR