lastID = -294463
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 16:50:41 Adam Phillips
  • 2022-05-04 16:50:40 Adam Phillips
  • 2020-03-27 00:43:23 Adam Phillips
  • 2020-03-27 00:43:22 Adam Phillips
  • 2020-02-01 06:05:44 Administrator
  • 2020-02-01 06:05:43 Administrator
  • 2020-02-01 06:05:42 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators

Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators

Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators
Abstract
This paper presents the upgrade of the Upper Blackstone Water Pollution Abatement District's (UBWPADs) sludge incinerators to meet the requirements of an Administrative Consent Order (ACO) and to improve the performance of the incinerators. Initially UBWPAD had three (3) MHFs installed in the mid 1970's. The incinerators were upgraded in 1996 by the inclusion of the Re-Heat Oxidation (RHOX) process (i.e. the addition of Electrodynamic Venturis (EDVs) and regenerative thermal oxidizers (RTO's) to improve control of volatile organic compounds (VOCs) and carbon monoxide (CO).Following this upgrade there were numerous bypass events (i.e. release of uncontrolled emissions to the atmosphere through the furnace's emergency dump stack). The uncontrolled emissions caused regulatory problems for the District. In addition, the District had problems with plugging of the RTOs due to the poor performance of the EDV systems in removing particulate matter. In the past, the RTOs would become so plugged with particulate matter after about 3 to 4 months of operation that the unit would have to be taken off line and water washed. Lastly, the District had continual problems with slagging and clinker formation in the furnaces which caused unexpected furnace outages and which significantly increased the manpower requirements to operate and maintain the furnaces. Due to the slagging and clinker problems, the District had voluntarily reduced the furnace throughput to not more than 1.3 dry tons per hr (DTPH), even though each unit had a rated capacity of 2.3 DTPH, based on a 23% solids feed.To address the above operational problems, the District decided to upgrade the MHFs. The upgrade essentially consisted of the installation of new wet electrostatic precipitators (WESPs) and flue gas recirculation (FGR) systems on the multiple hearth furnaces (MHFs). The WESPs were installed to improve the particulate removal of the incinerators' existing air pollution control (APC) systems. The FGR systems were installed primarily to reduce the slag and clinker formation in the furnaces which were causing excessive furnace downtime and requiring significant manpower for slag and clinker removal.Construction of the upgrade was completed in November of 2006 and performance testing of the WESPs was completed in December 2006. Air emissions testing at the outlet of the WESPs demonstrated that the new wet scrubbing and WESP systems achieved average outlet grain loadings of 0.000755 grains per dry standard cubic foot corrected to 7% oxygen (gr/dscf7%) and 0.000416 gr/dscf7% on Incinerators 1 and 2, respectively. These particulate emissions were well below the permit limit of 0.014 gr/dscf.After four months of operation the operating RTO was inspected and there was no build up of particulate matter and no need to water wash or clean the media. Thus the new APC systems were accomplishing their design objective which was to prevent plugging of the RTOs. At the 4 month interval, the operating MHF was also inspected and there was essentially no clinker or slag formation and no need to deslag the furnace. Hence the FGR system was accomplishing its intended purpose which was to prevent clinker and slag formation in the MHFs.
This paper presents the upgrade of the Upper Blackstone Water Pollution Abatement District's (UBWPADs) sludge incinerators to meet the requirements of an Administrative Consent Order (ACO) and to improve the performance of the incinerators. Initially UBWPAD had three (3) MHFs installed in the mid 1970's. The incinerators were upgraded in 1996 by the inclusion of the Re-Heat Oxidation (RHOX)...
Author(s)
Frank SapienzaThomas WalshKarla SangreyLouis BarryJane MaddenRobert Gaudes
SourceProceedings of the Water Environment Federation
SubjectSession 15: Bioenergy II
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:3L.880;1-
DOI10.2175/193864707787975642
Volume / Issue2007 / 3
Content sourceResiduals and Biosolids Conference
First / last page(s)880 - 892
Copyright2007
Word count510

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators
Pricing
Non-member price: $11.50
Member price:
-294463
Get access
-294463
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators
Abstract
This paper presents the upgrade of the Upper Blackstone Water Pollution Abatement District's (UBWPADs) sludge incinerators to meet the requirements of an Administrative Consent Order (ACO) and to improve the performance of the incinerators. Initially UBWPAD had three (3) MHFs installed in the mid 1970's. The incinerators were upgraded in 1996 by the inclusion of the Re-Heat Oxidation (RHOX) process (i.e. the addition of Electrodynamic Venturis (EDVs) and regenerative thermal oxidizers (RTO's) to improve control of volatile organic compounds (VOCs) and carbon monoxide (CO).Following this upgrade there were numerous bypass events (i.e. release of uncontrolled emissions to the atmosphere through the furnace's emergency dump stack). The uncontrolled emissions caused regulatory problems for the District. In addition, the District had problems with plugging of the RTOs due to the poor performance of the EDV systems in removing particulate matter. In the past, the RTOs would become so plugged with particulate matter after about 3 to 4 months of operation that the unit would have to be taken off line and water washed. Lastly, the District had continual problems with slagging and clinker formation in the furnaces which caused unexpected furnace outages and which significantly increased the manpower requirements to operate and maintain the furnaces. Due to the slagging and clinker problems, the District had voluntarily reduced the furnace throughput to not more than 1.3 dry tons per hr (DTPH), even though each unit had a rated capacity of 2.3 DTPH, based on a 23% solids feed.To address the above operational problems, the District decided to upgrade the MHFs. The upgrade essentially consisted of the installation of new wet electrostatic precipitators (WESPs) and flue gas recirculation (FGR) systems on the multiple hearth furnaces (MHFs). The WESPs were installed to improve the particulate removal of the incinerators' existing air pollution control (APC) systems. The FGR systems were installed primarily to reduce the slag and clinker formation in the furnaces which were causing excessive furnace downtime and requiring significant manpower for slag and clinker removal.Construction of the upgrade was completed in November of 2006 and performance testing of the WESPs was completed in December 2006. Air emissions testing at the outlet of the WESPs demonstrated that the new wet scrubbing and WESP systems achieved average outlet grain loadings of 0.000755 grains per dry standard cubic foot corrected to 7% oxygen (gr/dscf7%) and 0.000416 gr/dscf7% on Incinerators 1 and 2, respectively. These particulate emissions were well below the permit limit of 0.014 gr/dscf.After four months of operation the operating RTO was inspected and there was no build up of particulate matter and no need to water wash or clean the media. Thus the new APC systems were accomplishing their design objective which was to prevent plugging of the RTOs. At the 4 month interval, the operating MHF was also inspected and there was essentially no clinker or slag formation and no need to deslag the furnace. Hence the FGR system was accomplishing its intended purpose which was to prevent clinker and slag formation in the MHFs.
This paper presents the upgrade of the Upper Blackstone Water Pollution Abatement District's (UBWPADs) sludge incinerators to meet the requirements of an Administrative Consent Order (ACO) and to improve the performance of the incinerators. Initially UBWPAD had three (3) MHFs installed in the mid 1970's. The incinerators were upgraded in 1996 by the inclusion of the Re-Heat Oxidation (RHOX)...
Author(s)
Frank SapienzaThomas WalshKarla SangreyLouis BarryJane MaddenRobert Gaudes
SourceProceedings of the Water Environment Federation
SubjectSession 15: Bioenergy II
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:3L.880;1-
DOI10.2175/193864707787975642
Volume / Issue2007 / 3
Content sourceResiduals and Biosolids Conference
First / last page(s)880 - 892
Copyright2007
Word count510

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Frank Sapienza# Thomas Walsh# Karla Sangrey# Louis Barry# Jane Madden# Robert Gaudes. Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 24 Aug. 2025. <https://www.accesswater.org?id=-294463CITANCHOR>.
Frank Sapienza# Thomas Walsh# Karla Sangrey# Louis Barry# Jane Madden# Robert Gaudes. Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed August 24, 2025. https://www.accesswater.org/?id=-294463CITANCHOR.
Frank Sapienza# Thomas Walsh# Karla Sangrey# Louis Barry# Jane Madden# Robert Gaudes
Upgrade of UBWPAD's Multiple Hearth Furnace Sludge Incinerators
Access Water
Water Environment Federation
December 22, 2018
August 24, 2025
https://www.accesswater.org/?id=-294463CITANCHOR