lastID = -294519
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:45:42 Adam Phillips
  • 2022-05-04 21:45:41 Adam Phillips
  • 2020-03-26 22:11:03 Adam Phillips
  • 2020-03-26 22:11:02 Adam Phillips
  • 2020-02-01 06:01:35 Administrator
  • 2020-02-01 06:01:34 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR

UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR

UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR
Abstract
Prior evaluations of the in-lake portion of the City of Lake Oswego's Lake Interceptor sewer system determined that nearly 19,000 feet of the existing 12-inch to 36-inch-diameter cast iron and concrete cylinder pipe have serious hydraulic capacity and structural support deficiencies. The capacity deficiencies have resulted in overflows of untreated sewage during severe wet weather conditions on a few isolated occasions. Continued growth will result in greater frequency of these events. The line at both the west and east ends of the lake is buried while much of the line in the main lake, more than 9,000 feet, is supported above the lake bed on a pile foundation that would not withstand a moderate seismic event.The City undertook this predesign project to evaluate alternatives to replace the existing interceptor and support system so that capacity and structural deficiencies would be reliably addressed for the long-term. This paper reviews the alternatives initially considered and screened out for much of the system—continued O&M only, construct new tunnel under or around the lake, replace/rehabilitate existing system in-place—as well as the three alternatives carried forward for more detailed evaluation: the around-the-lake option and the two in-lake solutions: pile supported and buoyant.The around-the-lake option requires construction of six pump stations, 23,000 feet of force mains, and 13,000 feet of new gravity sewers. Most of these facilities would require significant rock excavation. The new pump stations would be located along the lakeshore at or near the points where existing tributary sewers enter the interceptor. This alternative also requires significant work in the lake's west end. Major disruption to local residents is expected during construction.A new pile-supported pipeline requires placing piles on a new alignment in the most geologically stable location, furthest from the steep slopes of the lake shore and the formations near the middle of the lake. The piles would typically extend to bedrock, which varies from approximately 35 to 150 feet below the lakebed. The pipe material selected for the new interceptor must be rigid enough to span the distance between the pile supports without excessive deflection (upward when empty and downward when flowing full). Corrosion of steel or ductile iron components is a significant concern.A new buoyant interceptor was explored in detail. This alternative would utilize anchors at the bottom of the lake and flexible tethers to hold the pipe to the required elevation. HDPE, while an ideal pipe material for this application in certain respects would both shrink and grow more than 14 feet from a neutral temperature length due to the seasonal lake temperature range of nearly 35 degrees F. Various methods of accommodating this movement, as well as anchor and tether options are presented.Manholes for a new in-water pipeline, whether buoyant or pile supported, would be submerged with their top elevations a safe distance below the lake water surface elevation. Access to the interceptor would be through a standpipe that would be clamped by divers to a mating surface on the top of each submerged manhole. Once the standpipe has been placed, the water would be pumped out and a maintenance worker would descend the standpipe to open the water-tight manhole cover and allow equipment installation.Predesign cost estimates for all alternatives greatly exceed those made during feasibility studies in 2001. As such, the City finds itself having to make difficult choices between funding of competing improvements on its capital improvement program. In addition to affordability and technical feasibility issues, public involvement efforts, permitting strategies, longevity, and O&M issues are discussed.
Prior evaluations of the in-lake portion of the City of Lake Oswego's Lake Interceptor sewer system determined that nearly 19,000 feet of the existing 12-inch to 36-inch-diameter cast iron and concrete cylinder pipe have serious hydraulic capacity and structural support deficiencies. The capacity deficiencies have resulted in overflows of untreated sewage during severe wet weather conditions on a...
Author(s)
Jon HollandPat McDougal
SourceProceedings of the Water Environment Federation
SubjectSession 7: Designing for Success: Engineering for the Long-Term
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:4L.396;1-
DOI10.2175/193864707787975147
Volume / Issue2007 / 4
Content sourceCollection Systems Conference
First / last page(s)396 - 423
Copyright2007
Word count597

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR
Pricing
Non-member price: $11.50
Member price:
-294519
Get access
-294519
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR
Abstract
Prior evaluations of the in-lake portion of the City of Lake Oswego's Lake Interceptor sewer system determined that nearly 19,000 feet of the existing 12-inch to 36-inch-diameter cast iron and concrete cylinder pipe have serious hydraulic capacity and structural support deficiencies. The capacity deficiencies have resulted in overflows of untreated sewage during severe wet weather conditions on a few isolated occasions. Continued growth will result in greater frequency of these events. The line at both the west and east ends of the lake is buried while much of the line in the main lake, more than 9,000 feet, is supported above the lake bed on a pile foundation that would not withstand a moderate seismic event.The City undertook this predesign project to evaluate alternatives to replace the existing interceptor and support system so that capacity and structural deficiencies would be reliably addressed for the long-term. This paper reviews the alternatives initially considered and screened out for much of the system—continued O&M only, construct new tunnel under or around the lake, replace/rehabilitate existing system in-place—as well as the three alternatives carried forward for more detailed evaluation: the around-the-lake option and the two in-lake solutions: pile supported and buoyant.The around-the-lake option requires construction of six pump stations, 23,000 feet of force mains, and 13,000 feet of new gravity sewers. Most of these facilities would require significant rock excavation. The new pump stations would be located along the lakeshore at or near the points where existing tributary sewers enter the interceptor. This alternative also requires significant work in the lake's west end. Major disruption to local residents is expected during construction.A new pile-supported pipeline requires placing piles on a new alignment in the most geologically stable location, furthest from the steep slopes of the lake shore and the formations near the middle of the lake. The piles would typically extend to bedrock, which varies from approximately 35 to 150 feet below the lakebed. The pipe material selected for the new interceptor must be rigid enough to span the distance between the pile supports without excessive deflection (upward when empty and downward when flowing full). Corrosion of steel or ductile iron components is a significant concern.A new buoyant interceptor was explored in detail. This alternative would utilize anchors at the bottom of the lake and flexible tethers to hold the pipe to the required elevation. HDPE, while an ideal pipe material for this application in certain respects would both shrink and grow more than 14 feet from a neutral temperature length due to the seasonal lake temperature range of nearly 35 degrees F. Various methods of accommodating this movement, as well as anchor and tether options are presented.Manholes for a new in-water pipeline, whether buoyant or pile supported, would be submerged with their top elevations a safe distance below the lake water surface elevation. Access to the interceptor would be through a standpipe that would be clamped by divers to a mating surface on the top of each submerged manhole. Once the standpipe has been placed, the water would be pumped out and a maintenance worker would descend the standpipe to open the water-tight manhole cover and allow equipment installation.Predesign cost estimates for all alternatives greatly exceed those made during feasibility studies in 2001. As such, the City finds itself having to make difficult choices between funding of competing improvements on its capital improvement program. In addition to affordability and technical feasibility issues, public involvement efforts, permitting strategies, longevity, and O&M issues are discussed.
Prior evaluations of the in-lake portion of the City of Lake Oswego's Lake Interceptor sewer system determined that nearly 19,000 feet of the existing 12-inch to 36-inch-diameter cast iron and concrete cylinder pipe have serious hydraulic capacity and structural support deficiencies. The capacity deficiencies have resulted in overflows of untreated sewage during severe wet weather conditions on a...
Author(s)
Jon HollandPat McDougal
SourceProceedings of the Water Environment Federation
SubjectSession 7: Designing for Success: Engineering for the Long-Term
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2007
ISSN1938-6478
SICI1938-6478(20070101)2007:4L.396;1-
DOI10.2175/193864707787975147
Volume / Issue2007 / 4
Content sourceCollection Systems Conference
First / last page(s)396 - 423
Copyright2007
Word count597

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Jon Holland# Pat McDougal. UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 25 Sep. 2025. <https://www.accesswater.org?id=-294519CITANCHOR>.
Jon Holland# Pat McDougal. UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 25, 2025. https://www.accesswater.org/?id=-294519CITANCHOR.
Jon Holland# Pat McDougal
UNDERWATER SEWER REPLACEMENT OPTIONS – NO EASY ANSWERS IN, UNDER, OR AROUND LAKE OSWEGO, OR
Access Water
Water Environment Federation
December 22, 2018
September 25, 2025
https://www.accesswater.org/?id=-294519CITANCHOR