Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-06-14 20:17:06 Adam Phillips
  • 2022-06-14 20:17:05 Adam Phillips
  • 2020-03-26 23:27:47 Adam Phillips
  • 2020-02-01 01:52:17 Administrator
  • 2020-02-01 01:52:16 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned

Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned

Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned
Abstract
Nantucket is an Island resort community located approximately 26 miles off the southern coast of Massachusetts Access to the Island is limited to boat or airplane, which makes delivery of building materials, chemicals, and other supplies difficult and costly to arrange. Interruptions in travel are frequently experienced during the winter due to rough seas, or fog. These conditions make it difficult and costly to implement heavy construction on the Island.The Surfside WWTF has historically provided chemically enhanced primary treatment using coagulants such as aluminum hydroxide and anionic polymer. Effluent is discharged into the Islands sole source aquifer using open sand rapid infiltration basins. In late 2002 the Town received an administrative consent order from the Massachusetts Department of Environmental Protection (DEP) to upgrade the level of treatment from primary to advanced treatment to achieve effluent total nitrogen concentrations of 10.0 mg/L or less on a year round basis, and to increase the capacity of the existing facility from 1.8 million gallons per day (mgd) up to 3.5 mgd‥ The Town began work on a sequencing batch reactor (SBR) to provide biological nutrient removal (BNR), and performed a value engineering (VE) study using the Preliminary (30 Percent) Design Report to verify selection of the BNR process. The VE team recommended that the Town consider the use of MBR technology for the upgrade and expansion for the following reasons:Sole source aquifer, possible requirements to implement extensive water reuse program.Potential for more stringent effluent discharge limits in the future due to the sole source aquifer.Sole source concrete supplier on the Island, important to minimize quantities of concrete used in the upgrade and expansion to control costs.Limited site availability due to extensive on-site area used for rapid infiltration basins, and close proximity to the Atlantic Ocean.Although the MBR process was estimated to have a slightly higher life-cycle cost compared to the SBR design. However, the Town elected to proceed with the MBR design based on these non-economic considerations.During the design the following types of MBR equipment were chosen for consideration based on each manufacturer list of installations, length of service, track record, and site visits to other operating MBR facilities:Immersed hollow fiber gravity or pumped flow.Immersed flat plate gravity or pumped flow.It was decided to allow all four system types in the specifications to maximize competitive bidding. The base contract drawings showed a immersed flat plate gravity flow arrangement in order to define the required tank volume, and process layout. The specifications outlined the process performance parameters, and equipment requirements, and evaluation criteria for the pre-selection.Manufacturers were required to arrange their system to fit within the confines of the structure designed. Tank volumes could be re-proportioned by the manufacturer, but the total volume of the MBR process tanks could not be reduced. Manufacturers were required to submit detailed layout and electrical drawings, pricing data on all components, energy consumption, cleaning frequency, and chemical usage information on detailed proposal forms one month prior to the general bid. Each manufacturer submittal was rated on the following:Life-cycle cost (capital and O&M)Number of similar size applications and track recordPretreatment requirementsCleaning requirements and frequencyAfter a two week review period the most favorable system was selected and the pre-selected vendor was published by addendum that included detailed arrangement and electrical drawings and guaranteed maximum purchase price as a bid allowance.This paper will outline the MBR design parameters, evaluation criteria, life cycle costs, and lessons learned during the complex pre-selection process for this large project.
Nantucket is an Island resort community located approximately 26 miles off the southern coast of Massachusetts Access to the Island is limited to boat or airplane, which makes delivery of building materials, chemicals, and other supplies difficult and costly to arrange. Interruptions in travel are frequently experienced during the winter due to rough seas, or fog. These conditions make it...
Author(s)
Thomas E. PareceRobert B. Stallings
SourceProceedings of the Water Environment Federation
SubjectSession 13: System Selection, Specifications, and Procurement – What Engineers, Owners, and Operators Need to Know
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:1L.763;1-
DOI10.2175/193864708788803596
Volume / Issue2008 / 1
Content sourceMembranes Conference
First / last page(s)763 - 770
Copyright2008
Word count600

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned
Pricing
Non-member price: $11.50
Member price:
-295382
Get access
-295382
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned
Abstract
Nantucket is an Island resort community located approximately 26 miles off the southern coast of Massachusetts Access to the Island is limited to boat or airplane, which makes delivery of building materials, chemicals, and other supplies difficult and costly to arrange. Interruptions in travel are frequently experienced during the winter due to rough seas, or fog. These conditions make it difficult and costly to implement heavy construction on the Island.The Surfside WWTF has historically provided chemically enhanced primary treatment using coagulants such as aluminum hydroxide and anionic polymer. Effluent is discharged into the Islands sole source aquifer using open sand rapid infiltration basins. In late 2002 the Town received an administrative consent order from the Massachusetts Department of Environmental Protection (DEP) to upgrade the level of treatment from primary to advanced treatment to achieve effluent total nitrogen concentrations of 10.0 mg/L or less on a year round basis, and to increase the capacity of the existing facility from 1.8 million gallons per day (mgd) up to 3.5 mgd‥ The Town began work on a sequencing batch reactor (SBR) to provide biological nutrient removal (BNR), and performed a value engineering (VE) study using the Preliminary (30 Percent) Design Report to verify selection of the BNR process. The VE team recommended that the Town consider the use of MBR technology for the upgrade and expansion for the following reasons:Sole source aquifer, possible requirements to implement extensive water reuse program.Potential for more stringent effluent discharge limits in the future due to the sole source aquifer.Sole source concrete supplier on the Island, important to minimize quantities of concrete used in the upgrade and expansion to control costs.Limited site availability due to extensive on-site area used for rapid infiltration basins, and close proximity to the Atlantic Ocean.Although the MBR process was estimated to have a slightly higher life-cycle cost compared to the SBR design. However, the Town elected to proceed with the MBR design based on these non-economic considerations.During the design the following types of MBR equipment were chosen for consideration based on each manufacturer list of installations, length of service, track record, and site visits to other operating MBR facilities:Immersed hollow fiber gravity or pumped flow.Immersed flat plate gravity or pumped flow.It was decided to allow all four system types in the specifications to maximize competitive bidding. The base contract drawings showed a immersed flat plate gravity flow arrangement in order to define the required tank volume, and process layout. The specifications outlined the process performance parameters, and equipment requirements, and evaluation criteria for the pre-selection.Manufacturers were required to arrange their system to fit within the confines of the structure designed. Tank volumes could be re-proportioned by the manufacturer, but the total volume of the MBR process tanks could not be reduced. Manufacturers were required to submit detailed layout and electrical drawings, pricing data on all components, energy consumption, cleaning frequency, and chemical usage information on detailed proposal forms one month prior to the general bid. Each manufacturer submittal was rated on the following:Life-cycle cost (capital and O&M)Number of similar size applications and track recordPretreatment requirementsCleaning requirements and frequencyAfter a two week review period the most favorable system was selected and the pre-selected vendor was published by addendum that included detailed arrangement and electrical drawings and guaranteed maximum purchase price as a bid allowance.This paper will outline the MBR design parameters, evaluation criteria, life cycle costs, and lessons learned during the complex pre-selection process for this large project.
Nantucket is an Island resort community located approximately 26 miles off the southern coast of Massachusetts Access to the Island is limited to boat or airplane, which makes delivery of building materials, chemicals, and other supplies difficult and costly to arrange. Interruptions in travel are frequently experienced during the winter due to rough seas, or fog. These conditions make it...
Author(s)
Thomas E. PareceRobert B. Stallings
SourceProceedings of the Water Environment Federation
SubjectSession 13: System Selection, Specifications, and Procurement – What Engineers, Owners, and Operators Need to Know
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:1L.763;1-
DOI10.2175/193864708788803596
Volume / Issue2008 / 1
Content sourceMembranes Conference
First / last page(s)763 - 770
Copyright2008
Word count600

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Thomas E. Parece# Robert B. Stallings. Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 30 Jun. 2025. <https://www.accesswater.org?id=-295382CITANCHOR>.
Thomas E. Parece# Robert B. Stallings. Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 30, 2025. https://www.accesswater.org/?id=-295382CITANCHOR.
Thomas E. Parece# Robert B. Stallings
Navigating the Pre-Selection of Membrane Bioreactor (MBR) Equipment in Nantucket, Massachusetts – Lessons Learned
Access Water
Water Environment Federation
December 22, 2018
June 30, 2025
https://www.accesswater.org/?id=-295382CITANCHOR