Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:37:33 Adam Phillips
  • 2022-05-04 21:37:32 Adam Phillips
  • 2020-03-26 22:09:31 Adam Phillips
  • 2020-03-26 22:09:30 Adam Phillips
  • 2020-02-01 03:31:04 Administrator
  • 2020-02-01 03:31:03 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation

Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation

Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation
Abstract
The City of Irvine, CA (City) uses reclaimed water produced at its Michelson Water Reclamation Plant (MWRP) for landscape irrigation and sanitary flushing, and is planning to increase production capacity from current 18 million gallons per day (mgd) to 33 mgd.In order to ensure sufficient wastewater feed for the planned expansion at MWRP, the Harvard Avenue Trunk Sewer (HATS), which currently flows to the Orange County Sanitation District (OCSD), must be re-routed to the plant. IRWD currently pays OCSD to treat the HATS flow at its wastewater treatment Plant No. 1 facility in Fountain Valley, CA.The re-routing of the 9 mgd build-out flow of the HATS to MWRP would have the dual benefit of providing the wastewater feed needed at MWRP to produce the additional reclaimed water, plus eliminating the payment of fees to OCSD. This makes the economics of this project particularly attractive.This paper is an account of the various schemes that were evaluated to re-route the HATS flow to MWRP. The fully developed urban project area required collaborative brain storming sessions with the Client to identify the potentially feasible alternative schemes. Alternatives included: pump station and forcemain, gravity line and lift station, and gravity line alone, at various locations and alignments.Diurnal flows were updated using data collected over 6 months to generate design diurnal curves for the project (Figure 2). The curves were used to estimate the current and future inflows to the system and identify available unused capacities in existing trunk sewers. The Storm Water Management Model (SWMM) was used extensively to analyze the hydraulics of the various alternatives, identify bottlenecks and surcharge locations, and to size and optimize the components of the proposed schemes. The final selected alternative consists of a diversion structure, gravity line to a pump station equipped with dual odor control facilities, forcemain that leads to a vortex drop structure, and a junction structure to connect to an existing trunk sewer.The project was so attractive that the City expedited implementation by opting for the “design-build” method of project delivery so as to have the project on-line by February 2008. The Engineer prepared the design-build RFP package, which specified the Design Basis and the 15% design of the selected alternative. The project was awarded in April 2007, with a contractual completion date of July 2008.This project is a show-case example of how thorough Engineering Studies combined with a collaborative approach with the Client can lead to effective implementation of the optimized solution in a timely manner.
The City of Irvine, CA (City) uses reclaimed water produced at its Michelson Water Reclamation Plant (MWRP) for landscape irrigation and sanitary flushing, and is planning to increase production capacity from current 18 million gallons per day (mgd) to 33 mgd.In order to ensure sufficient wastewater feed for the planned expansion at MWRP, the Harvard Avenue Trunk Sewer (HATS), which currently...
Author(s)
Shahriar EftekharzadehMelissa IngalsbeSteve Malloy
SourceProceedings of the Water Environment Federation
SubjectSession 7: Modeling that Makes a Difference
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:5L.491;1-
DOI10.2175/193864708788812875
Volume / Issue2008 / 5
Content sourceCollection Systems Conference
First / last page(s)491 - 502
Copyright2008
Word count424

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation
Pricing
Non-member price: $11.50
Member price:
-295660
Get access
-295660
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation
Abstract
The City of Irvine, CA (City) uses reclaimed water produced at its Michelson Water Reclamation Plant (MWRP) for landscape irrigation and sanitary flushing, and is planning to increase production capacity from current 18 million gallons per day (mgd) to 33 mgd.In order to ensure sufficient wastewater feed for the planned expansion at MWRP, the Harvard Avenue Trunk Sewer (HATS), which currently flows to the Orange County Sanitation District (OCSD), must be re-routed to the plant. IRWD currently pays OCSD to treat the HATS flow at its wastewater treatment Plant No. 1 facility in Fountain Valley, CA.The re-routing of the 9 mgd build-out flow of the HATS to MWRP would have the dual benefit of providing the wastewater feed needed at MWRP to produce the additional reclaimed water, plus eliminating the payment of fees to OCSD. This makes the economics of this project particularly attractive.This paper is an account of the various schemes that were evaluated to re-route the HATS flow to MWRP. The fully developed urban project area required collaborative brain storming sessions with the Client to identify the potentially feasible alternative schemes. Alternatives included: pump station and forcemain, gravity line and lift station, and gravity line alone, at various locations and alignments.Diurnal flows were updated using data collected over 6 months to generate design diurnal curves for the project (Figure 2). The curves were used to estimate the current and future inflows to the system and identify available unused capacities in existing trunk sewers. The Storm Water Management Model (SWMM) was used extensively to analyze the hydraulics of the various alternatives, identify bottlenecks and surcharge locations, and to size and optimize the components of the proposed schemes. The final selected alternative consists of a diversion structure, gravity line to a pump station equipped with dual odor control facilities, forcemain that leads to a vortex drop structure, and a junction structure to connect to an existing trunk sewer.The project was so attractive that the City expedited implementation by opting for the “design-build” method of project delivery so as to have the project on-line by February 2008. The Engineer prepared the design-build RFP package, which specified the Design Basis and the 15% design of the selected alternative. The project was awarded in April 2007, with a contractual completion date of July 2008.This project is a show-case example of how thorough Engineering Studies combined with a collaborative approach with the Client can lead to effective implementation of the optimized solution in a timely manner.
The City of Irvine, CA (City) uses reclaimed water produced at its Michelson Water Reclamation Plant (MWRP) for landscape irrigation and sanitary flushing, and is planning to increase production capacity from current 18 million gallons per day (mgd) to 33 mgd.In order to ensure sufficient wastewater feed for the planned expansion at MWRP, the Harvard Avenue Trunk Sewer (HATS), which currently...
Author(s)
Shahriar EftekharzadehMelissa IngalsbeSteve Malloy
SourceProceedings of the Water Environment Federation
SubjectSession 7: Modeling that Makes a Difference
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:5L.491;1-
DOI10.2175/193864708788812875
Volume / Issue2008 / 5
Content sourceCollection Systems Conference
First / last page(s)491 - 502
Copyright2008
Word count424

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Shahriar Eftekharzadeh# Melissa Ingalsbe# Steve Malloy. Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-295660CITANCHOR>.
Shahriar Eftekharzadeh# Melissa Ingalsbe# Steve Malloy. Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-295660CITANCHOR.
Shahriar Eftekharzadeh# Melissa Ingalsbe# Steve Malloy
Re-Routing of a Major Urban Trunk Sewer to Expand Water Reclamation
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-295660CITANCHOR