lastID = -295822
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-01-31 19:58:41 Administrator
  • 2020-01-31 19:58:40 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis

Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis

Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis
Abstract
The Harmony Creek Water Pollution Control Plant (WPCP) is an activated sludge facility with a rated capacity of 68 100 m3/d which services the Courtice Urban area and the City of Oshawa in the Regional Municipality of Durham (the Region), located east of the City of Toronto, Ontario, Canada. The WPCP consists of 2 plants – Plant 1 constructed in 1952 and Plant 2 constructed in 1972.With the recent commissioning of the new Courtice WPCP, Plant 1 became redundant and was abandoned. This facility is expected to be decommissioned shortly. Plant 2 will require efficient and timely maintenance attention to ensure long-term operational viability.The purpose of this project was two-fold: to conduct a condition assessment of the significant assets in the facility and to provide a valuation of the facility from the ‘bottom up’ rather than from the ‘top down’.The project consisted of the following phases: taking inventory of all the assets of Plant 2, completing a condition assessment of each asset, assigning a present value to each asset, estimating annual maintenance costs as well as estimating future rehabilitation and replacement costs, and developing estimated cash flow projections on an annual basis over a 25-year time horizon. The work was conducted in 2007.The predominant practice in asset management studies has been to conduct a high-level assessment of major process areas, valuating the assets based on rules-of-thumb. By contrast, the approach adopted in this project was a relatively detailed valuation of each piece of equipment/structure based on its initial installation cost and/or its estimated present replacement cost.These cost estimates were totaled to estimate the aggregate value of the facility and to estimate the annual maintenance costs as well as future rehabilitation and replacement costs.Prior to conducting the condition assessment at the WPCP, an inventory of key assets was developed through site visits and discussions with the operating staff at the facility. Each key asset was broken down to the component and sub-component level and assigned an alpha-numeric coding system compatible with the existing computerized maintenance management system (CMMS).The evaluation of the assets was limited to visual inspection of components, process equipment, and building and site works for the purpose of identifying their conditions and existing deficiencies. In addition, the maintenance records on file at the WPCP were reviewed and operator input sought to assist with the asset evaluation process.Each asset was evaluated for soundness, functionality, maintenance costs and age and assigned a grade to reflect the overall condition of the asset based on a consistent rating system.The criticality of each asset was assessed based on the following criteria: impact on the environment, impact on health and safety, impact on treatment process and magnitude of remedial costs. In evaluating the criticality of each asset, each criterion was weighted equally.The expected life spans used in this study were: 20 years for equipment and 60 years for structural assets. However, it was found that many of the equipment assets at the Harmony Creek WPCP had exceeded the normal expected life spans while continuing to operate satisfactorily with normal maintenance attention. Therefore, these assets were given a reasonable extended life span based on their current condition ratings. The modified life expectancies were then used to schedule the rehabilitation and replacement of each of these assets.To provide a starting point for the valuation of the assets, the approximate cost of the asset at the time of installation/construction was determined. In the absence of original cost information, present-day equipment costs were used to estimate original costs through the application of appropriate ENR indices.The book value of each asset as of 2007 was calculated based on the straight-line depreciation of the asset over its normal expected life span (20 years for equipment assets and 60 years for structural assets). On this basis, the book value of each asset was assumed to be zero at the end of its normal expected life span.In the absence of documented operating and maintenance costs, the estimates of annual maintenance costs were based on 1.5% of the replacement cost of the equipment asset. Maintenance costs of the structural/building and general site components were included in the annual operating and maintenance cost estimates at particular intervals when repairs were anticipated to be required.Rehabilitation of an asset was defined as a major overhaul and/or rebuilding of the asset and was assumed to cost 50% of the replacement cost of the asset in 2007 dollars. An algorithm was developed for estimating the rehabilitation date of the asset based on its age.The replacement cost of each asset was estimated by obtaining budget pricing from equipment suppliers and adding 100% to the cost of supply to arrive at an estimate of the installed cost. For structural/building assets, 25% was added to the construction cost estimate for the asset to cover the costs of excavation, backfilling and other associated costs.The estimated maintenance, rehabilitation and replacement costs were then used to develop a cash flow projection on an annual basis over a 25-year time horizon for Plant 2 of the Harmony Creek WPCP.The developed asset evaluation method has provided the Region with an efficient tool to track and anticipate forthcoming maintenance, rehabilitation, and replacement costs. This approach not only gives the Region a high-level valuation of assets but also a breakdown to the component and subcomponent levels.The systematic approach developed in this project can be adopted at other facilities, if a detailed asset valuation and future investment profile is required and can be easily adapted to various time horizons for cash flow projections.
The Harmony Creek Water Pollution Control Plant (WPCP) is an activated sludge facility with a rated capacity of 68 100 m3/d which services the Courtice Urban area and the City of Oshawa in the Regional Municipality of Durham (the Region), located east of the City of Toronto, Ontario, Canada. The WPCP consists of 2 plants – Plant 1 constructed in 1952 and Plant 2 constructed in 1972.With the...
Author(s)
Marek KrynskiPeter TakaokaRina Kurian
SourceProceedings of the Water Environment Federation
SubjectSession 110: Asset Management: There Are Many Routes to the Asset Management Goal
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:7L.8093;1-
DOI10.2175/193864708790894016
Volume / Issue2008 / 7
Content sourceWEFTEC
First / last page(s)8093 - 8102
Copyright2008
Word count930

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis
Pricing
Non-member price: $11.50
Member price:
-295822
Get access
-295822
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis
Abstract
The Harmony Creek Water Pollution Control Plant (WPCP) is an activated sludge facility with a rated capacity of 68 100 m3/d which services the Courtice Urban area and the City of Oshawa in the Regional Municipality of Durham (the Region), located east of the City of Toronto, Ontario, Canada. The WPCP consists of 2 plants – Plant 1 constructed in 1952 and Plant 2 constructed in 1972.With the recent commissioning of the new Courtice WPCP, Plant 1 became redundant and was abandoned. This facility is expected to be decommissioned shortly. Plant 2 will require efficient and timely maintenance attention to ensure long-term operational viability.The purpose of this project was two-fold: to conduct a condition assessment of the significant assets in the facility and to provide a valuation of the facility from the ‘bottom up’ rather than from the ‘top down’.The project consisted of the following phases: taking inventory of all the assets of Plant 2, completing a condition assessment of each asset, assigning a present value to each asset, estimating annual maintenance costs as well as estimating future rehabilitation and replacement costs, and developing estimated cash flow projections on an annual basis over a 25-year time horizon. The work was conducted in 2007.The predominant practice in asset management studies has been to conduct a high-level assessment of major process areas, valuating the assets based on rules-of-thumb. By contrast, the approach adopted in this project was a relatively detailed valuation of each piece of equipment/structure based on its initial installation cost and/or its estimated present replacement cost.These cost estimates were totaled to estimate the aggregate value of the facility and to estimate the annual maintenance costs as well as future rehabilitation and replacement costs.Prior to conducting the condition assessment at the WPCP, an inventory of key assets was developed through site visits and discussions with the operating staff at the facility. Each key asset was broken down to the component and sub-component level and assigned an alpha-numeric coding system compatible with the existing computerized maintenance management system (CMMS).The evaluation of the assets was limited to visual inspection of components, process equipment, and building and site works for the purpose of identifying their conditions and existing deficiencies. In addition, the maintenance records on file at the WPCP were reviewed and operator input sought to assist with the asset evaluation process.Each asset was evaluated for soundness, functionality, maintenance costs and age and assigned a grade to reflect the overall condition of the asset based on a consistent rating system.The criticality of each asset was assessed based on the following criteria: impact on the environment, impact on health and safety, impact on treatment process and magnitude of remedial costs. In evaluating the criticality of each asset, each criterion was weighted equally.The expected life spans used in this study were: 20 years for equipment and 60 years for structural assets. However, it was found that many of the equipment assets at the Harmony Creek WPCP had exceeded the normal expected life spans while continuing to operate satisfactorily with normal maintenance attention. Therefore, these assets were given a reasonable extended life span based on their current condition ratings. The modified life expectancies were then used to schedule the rehabilitation and replacement of each of these assets.To provide a starting point for the valuation of the assets, the approximate cost of the asset at the time of installation/construction was determined. In the absence of original cost information, present-day equipment costs were used to estimate original costs through the application of appropriate ENR indices.The book value of each asset as of 2007 was calculated based on the straight-line depreciation of the asset over its normal expected life span (20 years for equipment assets and 60 years for structural assets). On this basis, the book value of each asset was assumed to be zero at the end of its normal expected life span.In the absence of documented operating and maintenance costs, the estimates of annual maintenance costs were based on 1.5% of the replacement cost of the equipment asset. Maintenance costs of the structural/building and general site components were included in the annual operating and maintenance cost estimates at particular intervals when repairs were anticipated to be required.Rehabilitation of an asset was defined as a major overhaul and/or rebuilding of the asset and was assumed to cost 50% of the replacement cost of the asset in 2007 dollars. An algorithm was developed for estimating the rehabilitation date of the asset based on its age.The replacement cost of each asset was estimated by obtaining budget pricing from equipment suppliers and adding 100% to the cost of supply to arrive at an estimate of the installed cost. For structural/building assets, 25% was added to the construction cost estimate for the asset to cover the costs of excavation, backfilling and other associated costs.The estimated maintenance, rehabilitation and replacement costs were then used to develop a cash flow projection on an annual basis over a 25-year time horizon for Plant 2 of the Harmony Creek WPCP.The developed asset evaluation method has provided the Region with an efficient tool to track and anticipate forthcoming maintenance, rehabilitation, and replacement costs. This approach not only gives the Region a high-level valuation of assets but also a breakdown to the component and subcomponent levels.The systematic approach developed in this project can be adopted at other facilities, if a detailed asset valuation and future investment profile is required and can be easily adapted to various time horizons for cash flow projections.
The Harmony Creek Water Pollution Control Plant (WPCP) is an activated sludge facility with a rated capacity of 68 100 m3/d which services the Courtice Urban area and the City of Oshawa in the Regional Municipality of Durham (the Region), located east of the City of Toronto, Ontario, Canada. The WPCP consists of 2 plants – Plant 1 constructed in 1952 and Plant 2 constructed in 1972.With the...
Author(s)
Marek KrynskiPeter TakaokaRina Kurian
SourceProceedings of the Water Environment Federation
SubjectSession 110: Asset Management: There Are Many Routes to the Asset Management Goal
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2008
ISSN1938-6478
SICI1938-6478(20080101)2008:7L.8093;1-
DOI10.2175/193864708790894016
Volume / Issue2008 / 7
Content sourceWEFTEC
First / last page(s)8093 - 8102
Copyright2008
Word count930

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Marek Krynski# Peter Takaoka# Rina Kurian. Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 9 May. 2025. <https://www.accesswater.org?id=-295822CITANCHOR>.
Marek Krynski# Peter Takaoka# Rina Kurian. Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed May 9, 2025. https://www.accesswater.org/?id=-295822CITANCHOR.
Marek Krynski# Peter Takaoka# Rina Kurian
Asset Management at Harmony Creek Water Pollution Control Plant: A Detailed Approach to a High-Level Analysis
Access Water
Water Environment Federation
December 22, 2018
May 9, 2025
https://www.accesswater.org/?id=-295822CITANCHOR