lastID = -296570
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 20:13:26 Adam Phillips
  • 2022-05-04 20:13:25 Adam Phillips
  • 2020-03-26 22:08:29 Adam Phillips
  • 2020-03-26 22:08:28 Adam Phillips
  • 2020-01-31 19:03:25 Administrator
  • 2020-01-31 19:03:24 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main

A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main

A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main
Abstract
The City of Lake Worth and Palm Beach County (FL) share operating ownership of a 14.1 mile wastewater regional force main (RFM) serving six additional municipalities and over 475,000 residents. Installed in 1972–79, the FM extends from the Master Pump Station within Lake Worth 4.45 miles as 36” pre-stressed concrete cylinder pipe (PCCP) and from the city limits 9.65 miles into the county as 42” – 54” ductile iron pipe (DIP) terminating at the East Central Regional Water Reclamation Facility (ECRWRF) within the City of West Palm Beach. Flow is characterized primarily as domestic and commercial with an average daily flow (ADF) of 20 MGD; pressure averages 20–25 psig with periodic peaks of about 45 psig. Because the RFM is manifolded it serves as the primary conduit of wastewater to the treatment plant – there is are no redundant or bypass lines to resort to if the line fails, it cannot be taken out of services for more than a few hours, and incoming flow would be forced to spill to an ocean outfall. Recent failures of the DIP portion resulting in spills and regulatory action from FL DEP heightened the awareness of the served jurisdictions of the potential for a catastrophic failure and led to an investigation of the integrity of the entire line. Defects that included deterioration of the pipe crown and at joints were found in 48” pipe along with a failure in an adjoining 16” line which ultimately ties into a 30” force main that connects with the RFM. Using state-of-the-art assessment technologies including ultrasonic and broadband electro-magnetic (BEM) scanning, measurements were made of the existing DIP thickness including a profile of the wall at selected locations. Similarly, acoustical emission technology (AET) was applied to the PCCP segments to “listen” to active distress signals from tensioning wires stretching or breaking within the pipe wall. Using historical operating and maintenance records and a field study of air release valves, a determination was made regarding useful life of the pipeline, likely failure points, remaining wall thickness of the DIP segments, and what areas should be rehabilitated or replaced. A phased program of “renewal” was then developed for the RFM to be implemented by Lake Worth and the Palm Beach County Water Utilities Department that reduced forecasted potential replacements costs from 24 million to 1.9 million.
The City of Lake Worth and Palm Beach County (FL) share operating ownership of a 14.1 mile wastewater regional force main (RFM) serving six additional municipalities and over 475,000 residents. Installed in 1972–79, the FM extends from the Master Pump Station within Lake Worth 4.45 miles as 36” pre-stressed concrete cylinder pipe (PCCP) and from the city limits 9.65 miles into the...
Author(s)
Neal D. StubblefieldHenry GlausCameron WhiteRobert MorrisonShields Brian
SourceProceedings of the Water Environment Federation
SubjectSession 3 - Pump Station and Force Main Solutions
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.230;1-
DOI10.2175/193864709793847258
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)230 - 253
Copyright2009
Word count403
Subject keywordsFailureforce mainrehabilitation

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main
Pricing
Non-member price: $11.50
Member price:
-296570
Get access
-296570
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main
Abstract
The City of Lake Worth and Palm Beach County (FL) share operating ownership of a 14.1 mile wastewater regional force main (RFM) serving six additional municipalities and over 475,000 residents. Installed in 1972–79, the FM extends from the Master Pump Station within Lake Worth 4.45 miles as 36” pre-stressed concrete cylinder pipe (PCCP) and from the city limits 9.65 miles into the county as 42” – 54” ductile iron pipe (DIP) terminating at the East Central Regional Water Reclamation Facility (ECRWRF) within the City of West Palm Beach. Flow is characterized primarily as domestic and commercial with an average daily flow (ADF) of 20 MGD; pressure averages 20–25 psig with periodic peaks of about 45 psig. Because the RFM is manifolded it serves as the primary conduit of wastewater to the treatment plant – there is are no redundant or bypass lines to resort to if the line fails, it cannot be taken out of services for more than a few hours, and incoming flow would be forced to spill to an ocean outfall. Recent failures of the DIP portion resulting in spills and regulatory action from FL DEP heightened the awareness of the served jurisdictions of the potential for a catastrophic failure and led to an investigation of the integrity of the entire line. Defects that included deterioration of the pipe crown and at joints were found in 48” pipe along with a failure in an adjoining 16” line which ultimately ties into a 30” force main that connects with the RFM. Using state-of-the-art assessment technologies including ultrasonic and broadband electro-magnetic (BEM) scanning, measurements were made of the existing DIP thickness including a profile of the wall at selected locations. Similarly, acoustical emission technology (AET) was applied to the PCCP segments to “listen” to active distress signals from tensioning wires stretching or breaking within the pipe wall. Using historical operating and maintenance records and a field study of air release valves, a determination was made regarding useful life of the pipeline, likely failure points, remaining wall thickness of the DIP segments, and what areas should be rehabilitated or replaced. A phased program of “renewal” was then developed for the RFM to be implemented by Lake Worth and the Palm Beach County Water Utilities Department that reduced forecasted potential replacements costs from 24 million to 1.9 million.
The City of Lake Worth and Palm Beach County (FL) share operating ownership of a 14.1 mile wastewater regional force main (RFM) serving six additional municipalities and over 475,000 residents. Installed in 1972–79, the FM extends from the Master Pump Station within Lake Worth 4.45 miles as 36” pre-stressed concrete cylinder pipe (PCCP) and from the city limits 9.65 miles into the...
Author(s)
Neal D. StubblefieldHenry GlausCameron WhiteRobert MorrisonShields Brian
SourceProceedings of the Water Environment Federation
SubjectSession 3 - Pump Station and Force Main Solutions
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.230;1-
DOI10.2175/193864709793847258
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)230 - 253
Copyright2009
Word count403
Subject keywordsFailureforce mainrehabilitation

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Neal D. Stubblefield# Henry Glaus# Cameron White# Robert Morrison# Shields Brian. A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 1 Jul. 2025. <https://www.accesswater.org?id=-296570CITANCHOR>.
Neal D. Stubblefield# Henry Glaus# Cameron White# Robert Morrison# Shields Brian. A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 1, 2025. https://www.accesswater.org/?id=-296570CITANCHOR.
Neal D. Stubblefield# Henry Glaus# Cameron White# Robert Morrison# Shields Brian
A “Swiss Army Knife” Approach: Condition Based Assessment of a South Florida Sewage Force Main
Access Water
Water Environment Federation
December 22, 2018
July 1, 2025
https://www.accesswater.org/?id=-296570CITANCHOR