lastID = -296613
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:39:26 Adam Phillips
  • 2022-05-04 21:39:25 Adam Phillips
  • 2020-03-26 22:07:30 Adam Phillips
  • 2020-02-01 03:58:15 Administrator
  • 2020-02-01 03:58:14 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program

Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program

Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program
Abstract
Many utilities throughout the Unites States are facing the reality that their underground sewer assets are deteriorating and many have reached the end of their useful lives. In addition, the Capacity Maintenance Operation and Management (CMOM) portion of the proposed SSO Rule is being included in many NPDES permits as well as Consent Decrees.In April 2007, Sanitation District No. 1 of Northern Kentucky (SD1), which serves over 97,000 customer accounts in Campbell, Kenton, and Boone Counties, entered into a Consent Decree with USEPA Region 4 and the Kentucky Division of Water (KDOW) to address CSOs and SSOs in the sewer system. The Consent Decree requires the District to conduct a CMOM self assessment as well as a Nine Minimum Controls Compliance (NMC) Evaluation to document their degree of compliance with NMC and CMOM requirements.One result of the audit and compliance evaluation was the development of an aggressive and comprehensive Continuous Sewer Assessment Program (CSAP) that will include O&M goals related to the NMC and CMOM in the same program. This presentation will document the development and implementation of the District's CSAP, which began operation in January 2008. The overall goal of the program is to cost-effectively minimize O&M related spills and to implement system renewal and rehabilitation in a way that targets dollars where they have the highest benefit. For the collection system, the benefit is a reduction in sewer failures and failure consequences.The CSAP comprises six individual O&M programs that include a prioritized, structured, and perpetual approach to preventative O&M, sewer assessment and sewer rehabilitation. The overall structure of the program is based on an Asset Management approach. That is, the program will be set up to prioritize assets based on their consequence and likelihood of failure. This approach helps ensure cost-effective use of rate-payers money considering that there are many other needs that the District must address as part of the Consent Decree implementation. The six individual O;amp;M programs include:Trouble Call Program (TCP): The trouble call program is the program where the Districtreactively responds to calls from customers who suspect they have a problem related to their sanitary sewer.Preventive O&M Program (POMP): The Preventive O&M program comprises activities designed to proactively prevent system failure such as pipe collapses and blockages that can cause or exacerbate overflows in the sewers system.Sonar Program (SOP): The Sonar program is an assessment program the District currently uses for the interceptors in the combined system and large trunk sewers in the separate system with high base flows that preclude CCTV inspection.Sanitary Sewer Evaluation Survey (SSES) Program: The SSES program comprises activities designed to help find sources of I/I, evaluate the potential to cost effectively remove I/I, and subsequent activities designed to cost effectively remove I/I sources in targeted areas.Large Diameter Sewer Assessment Program (LDSAP) : The LDSAP program is targeted toward District larger sewers where the consequence of failure (criticality) is high.Manhole Inspection Program: The manhole inspections will be performed at the same time as the sewer inspections associated with the above sewer programs.A key feature of the POMP is the priority-basin approach. The Districts sewer system is divided into approximately 250 gravity drainage basins, 182 of which are in the separate sewer system. These 182 basins comprise the priority basin area. The priority basin approach essentially means that assessment and rehabilitation activities will focus on an entire basin at a time. This allows for efficient use of CCTV and engineering resources while still focusing on areas that need the most attention. There are three exceptions to this approach. These are pipes located within 50' of a stream, immediately downstream of an SSO, or pipes within an SSES area. These areas were deemed to be high priority and should not wait for its tributary basin to be completed.Each basin was given a priority score based on a combination of structural and service condition criteria. These criteria were scored for each basin based on a significant amount of information available from the District's gbaMS (George Butler Master Series) CMMS (computerized maintenance management software) which is used to track the inventory and work order associated with the District's assets. Information used in the analysis included CCTV data, work order histories, failure history, Preventative Maintenance history, and its vicinity to a known SSO.The CSAP was split into two phases; the Assessment Phase and then the Implementation Phase which includes a Cleaning Program and Rehabilitation Program Component. The program was designed to inspect the entire District's service area at least once within 10 years, but will include the assessment of an equivalent system length within 5 years from reoccurring inspections. This is due to the fact that some critical assets may be inspected twice before some are assessed once. This is the necessary result of the Asset Management approach.A process flow chart was then developed that includes a detailed decision-making procedure for conducting initial inspections as well as re-inspection and re-cleaning frequencies, which depend on the asset's observed condition and criticality. The process flow chart also includes a method to assign assets a rehabilitation priority score of 1-3 based on several factors. The rehabilitation priority score is one of several criteria that will be used to develop, prioritize and implementrehabilitation projects.The program also includes the development of an interim access database software tool that will automate the process flowchart that was developed. This tool takes the structural and maintenance SCREAM scores from the CCTV results and then lists the next step in the assessment process with a target date. These dates can then be used to develop timely work orders that will then be tracked in the District's gbaMS CMMS software. The interim tool will be replaced in the near future with a permanent tool that will work with gbaMS to automatically generate work orders for the next action based on the inspection results.With limited external funding sources for infrastructure improvements, municipal utilities are challenged to develop cost-effective O&M programs. A prioritized and proactive approach for sewer system assessment and rehabilitation provides a way to identify and justify to the stakeholders and regulators those sewers and manholes where rehabilitation dollars will have the greatest benefit.
Many utilities throughout the Unites States are facing the reality that their underground sewer assets are deteriorating and many have reached the end of their useful lives. In addition, the Capacity Maintenance Operation and Management (CMOM) portion of the proposed SSO Rule is being included in many NPDES permits as well as Consent Decrees.In April 2007, Sanitation District No. 1 of Northern...
Author(s)
Brandon VatterSean FitzGerald
SourceProceedings of the Water Environment Federation
SubjectSession 11 - Planning Pays Off
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.734;1-
DOI10.2175/193864709793847339
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)734 - 757
Copyright2009
Word count1,038
Subject keywordssanitary sewer overflowsCMOMasset managementCCTVCSAPcriticalitystructural assessment

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program
Pricing
Non-member price: $11.50
Member price:
-296613
Get access
-296613
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program
Abstract
Many utilities throughout the Unites States are facing the reality that their underground sewer assets are deteriorating and many have reached the end of their useful lives. In addition, the Capacity Maintenance Operation and Management (CMOM) portion of the proposed SSO Rule is being included in many NPDES permits as well as Consent Decrees.In April 2007, Sanitation District No. 1 of Northern Kentucky (SD1), which serves over 97,000 customer accounts in Campbell, Kenton, and Boone Counties, entered into a Consent Decree with USEPA Region 4 and the Kentucky Division of Water (KDOW) to address CSOs and SSOs in the sewer system. The Consent Decree requires the District to conduct a CMOM self assessment as well as a Nine Minimum Controls Compliance (NMC) Evaluation to document their degree of compliance with NMC and CMOM requirements.One result of the audit and compliance evaluation was the development of an aggressive and comprehensive Continuous Sewer Assessment Program (CSAP) that will include O&M goals related to the NMC and CMOM in the same program. This presentation will document the development and implementation of the District's CSAP, which began operation in January 2008. The overall goal of the program is to cost-effectively minimize O&M related spills and to implement system renewal and rehabilitation in a way that targets dollars where they have the highest benefit. For the collection system, the benefit is a reduction in sewer failures and failure consequences.The CSAP comprises six individual O&M programs that include a prioritized, structured, and perpetual approach to preventative O&M, sewer assessment and sewer rehabilitation. The overall structure of the program is based on an Asset Management approach. That is, the program will be set up to prioritize assets based on their consequence and likelihood of failure. This approach helps ensure cost-effective use of rate-payers money considering that there are many other needs that the District must address as part of the Consent Decree implementation. The six individual O;amp;M programs include:Trouble Call Program (TCP): The trouble call program is the program where the Districtreactively responds to calls from customers who suspect they have a problem related to their sanitary sewer.Preventive O&M Program (POMP): The Preventive O&M program comprises activities designed to proactively prevent system failure such as pipe collapses and blockages that can cause or exacerbate overflows in the sewers system.Sonar Program (SOP): The Sonar program is an assessment program the District currently uses for the interceptors in the combined system and large trunk sewers in the separate system with high base flows that preclude CCTV inspection.Sanitary Sewer Evaluation Survey (SSES) Program: The SSES program comprises activities designed to help find sources of I/I, evaluate the potential to cost effectively remove I/I, and subsequent activities designed to cost effectively remove I/I sources in targeted areas.Large Diameter Sewer Assessment Program (LDSAP) : The LDSAP program is targeted toward District larger sewers where the consequence of failure (criticality) is high.Manhole Inspection Program: The manhole inspections will be performed at the same time as the sewer inspections associated with the above sewer programs.A key feature of the POMP is the priority-basin approach. The Districts sewer system is divided into approximately 250 gravity drainage basins, 182 of which are in the separate sewer system. These 182 basins comprise the priority basin area. The priority basin approach essentially means that assessment and rehabilitation activities will focus on an entire basin at a time. This allows for efficient use of CCTV and engineering resources while still focusing on areas that need the most attention. There are three exceptions to this approach. These are pipes located within 50' of a stream, immediately downstream of an SSO, or pipes within an SSES area. These areas were deemed to be high priority and should not wait for its tributary basin to be completed.Each basin was given a priority score based on a combination of structural and service condition criteria. These criteria were scored for each basin based on a significant amount of information available from the District's gbaMS (George Butler Master Series) CMMS (computerized maintenance management software) which is used to track the inventory and work order associated with the District's assets. Information used in the analysis included CCTV data, work order histories, failure history, Preventative Maintenance history, and its vicinity to a known SSO.The CSAP was split into two phases; the Assessment Phase and then the Implementation Phase which includes a Cleaning Program and Rehabilitation Program Component. The program was designed to inspect the entire District's service area at least once within 10 years, but will include the assessment of an equivalent system length within 5 years from reoccurring inspections. This is due to the fact that some critical assets may be inspected twice before some are assessed once. This is the necessary result of the Asset Management approach.A process flow chart was then developed that includes a detailed decision-making procedure for conducting initial inspections as well as re-inspection and re-cleaning frequencies, which depend on the asset's observed condition and criticality. The process flow chart also includes a method to assign assets a rehabilitation priority score of 1-3 based on several factors. The rehabilitation priority score is one of several criteria that will be used to develop, prioritize and implementrehabilitation projects.The program also includes the development of an interim access database software tool that will automate the process flowchart that was developed. This tool takes the structural and maintenance SCREAM scores from the CCTV results and then lists the next step in the assessment process with a target date. These dates can then be used to develop timely work orders that will then be tracked in the District's gbaMS CMMS software. The interim tool will be replaced in the near future with a permanent tool that will work with gbaMS to automatically generate work orders for the next action based on the inspection results.With limited external funding sources for infrastructure improvements, municipal utilities are challenged to develop cost-effective O&M programs. A prioritized and proactive approach for sewer system assessment and rehabilitation provides a way to identify and justify to the stakeholders and regulators those sewers and manholes where rehabilitation dollars will have the greatest benefit.
Many utilities throughout the Unites States are facing the reality that their underground sewer assets are deteriorating and many have reached the end of their useful lives. In addition, the Capacity Maintenance Operation and Management (CMOM) portion of the proposed SSO Rule is being included in many NPDES permits as well as Consent Decrees.In April 2007, Sanitation District No. 1 of Northern...
Author(s)
Brandon VatterSean FitzGerald
SourceProceedings of the Water Environment Federation
SubjectSession 11 - Planning Pays Off
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2009
ISSN1938-6478
SICI1938-6478(20090101)2009:2L.734;1-
DOI10.2175/193864709793847339
Volume / Issue2009 / 2
Content sourceCollection Systems Conference
First / last page(s)734 - 757
Copyright2009
Word count1,038
Subject keywordssanitary sewer overflowsCMOMasset managementCCTVCSAPcriticalitystructural assessment

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Brandon Vatter# Sean FitzGerald. Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 8 Jun. 2025. <https://www.accesswater.org?id=-296613CITANCHOR>.
Brandon Vatter# Sean FitzGerald. Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 8, 2025. https://www.accesswater.org/?id=-296613CITANCHOR.
Brandon Vatter# Sean FitzGerald
Sanitation District No. 1 Implements Innovative and Aggressive Continuous Sewer System Assessment Program
Access Water
Water Environment Federation
December 22, 2018
June 8, 2025
https://www.accesswater.org/?id=-296613CITANCHOR