lastID = -297745
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Reforestation of the Mission Reach of the San Antonio River
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 14:50:14 Adam Phillips
  • 2022-05-06 14:50:13 Adam Phillips
  • 2020-03-26 22:01:17 Adam Phillips
  • 2020-02-01 03:39:51 Administrator
  • 2020-02-01 03:39:50 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Reforestation of the Mission Reach of the San Antonio River

Reforestation of the Mission Reach of the San Antonio River

Reforestation of the Mission Reach of the San Antonio River

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Reforestation of the Mission Reach of the San Antonio River
Abstract
The Mission Reach Ecosystem Restoration and Recreation (MR-ERR), part of the overall 13-mile San Antonio River Improvements Project, is addressed as an in-progress case study of an urban riparian re-forestation project. The project is a 160 million-dollar Federal, County, and City investment within urban San Antonio, Texas. This project is one of the largest civil works project within the United States Army Corps of Engineers (USACE) Fort Worth District. The task is to restore the 8-mile MR-ERR segment to natural upland and aquatic ecosystems by creating wildlife habitat in the form of vegetation, rock riffles, embayments and restored river remnants. Ironically, the San Antonio River was originally channelized by the USACE in the 1950's as a flood damage reduction project, and the ecosystem restoration project is taking place under the original congressional project authorization.The site's pre-project condition is best described as an earthen trapezoidal ditch with an incised channel in the bottom. The channel is actively eroding, and evidence of head cutting is evident. Due to maintenance practices aimed at ensuring the channel effectively functions as a floodway, no woody vegetation is permitted within the pre-project site. The project increases the available right-of-way for the channel, enabling the overbank slopes to be reduced, the sinuosity of the river to be increased, and the re-forestation of the floodway. This must be done while maintaining the flood damage reduction benefits of the channel. The re-forested communities consist of native species combinations based upon observations of nearby communities.A riffle-run-pool stream model is utilized in the restoration project to evaluate and balance sediment transport concerns, evaluate sinuosity and determine proposed grade line for the re-aligned river. HEC-RAS and GEO-RAS hydraulic models are utilized to evaluate flow regimes and determine acceptable plan-form geometries and proposed vegetation densities.To effectively mathematically model the approximately 20,000 new trees proposed to be planted in the re-aligned channel, the proposed vegetation is divided up into 4 discreet densities with corresponding roughness coefficients. Generally speaking, the higher the vegetation density, the higher the habitat “value,” therefore all vegetation in the channel that is not of the highest density is a hydraulic concession.Upon completion, the project will contain over 140 hectares of riparian habitat and over 2.7 million cubic meters of earth will be removed from the channel to offset the proposed vegetation. No negative impacts to the flood damage reduction capabilities of the river will occur.
The Mission Reach Ecosystem Restoration and Recreation (MR-ERR), part of the overall 13-mile San Antonio River Improvements Project, is addressed as an in-progress case study of an urban riparian re-forestation project. The project is a 160 million-dollar Federal, County, and City investment within urban San Antonio, Texas. This project is one of the largest civil works project within the United...
Author(s)
Robert Neil Thomas
SourceProceedings of the Water Environment Federation
SubjectSession 12 (URR): Texas and Other Foreign Countries
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:2L.1035;1-
DOI10.2175/193864710798284445
Volume / Issue2010 / 2
Content sourceCities of the Future/Urban River Restoration Conference
First / last page(s)1035 - 1041
Copyright2010
Word count406
Subject keywordsurban reforestationecosystem restorationre-vegetationriparian vegetation

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Reforestation of the Mission Reach of the San Antonio River'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Reforestation of the Mission Reach of the San Antonio River
Pricing
Non-member price: $11.50
Member price:
-297745
Get access
-297745
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Reforestation of the Mission Reach of the San Antonio River'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Reforestation of the Mission Reach of the San Antonio River
Abstract
The Mission Reach Ecosystem Restoration and Recreation (MR-ERR), part of the overall 13-mile San Antonio River Improvements Project, is addressed as an in-progress case study of an urban riparian re-forestation project. The project is a 160 million-dollar Federal, County, and City investment within urban San Antonio, Texas. This project is one of the largest civil works project within the United States Army Corps of Engineers (USACE) Fort Worth District. The task is to restore the 8-mile MR-ERR segment to natural upland and aquatic ecosystems by creating wildlife habitat in the form of vegetation, rock riffles, embayments and restored river remnants. Ironically, the San Antonio River was originally channelized by the USACE in the 1950's as a flood damage reduction project, and the ecosystem restoration project is taking place under the original congressional project authorization.The site's pre-project condition is best described as an earthen trapezoidal ditch with an incised channel in the bottom. The channel is actively eroding, and evidence of head cutting is evident. Due to maintenance practices aimed at ensuring the channel effectively functions as a floodway, no woody vegetation is permitted within the pre-project site. The project increases the available right-of-way for the channel, enabling the overbank slopes to be reduced, the sinuosity of the river to be increased, and the re-forestation of the floodway. This must be done while maintaining the flood damage reduction benefits of the channel. The re-forested communities consist of native species combinations based upon observations of nearby communities.A riffle-run-pool stream model is utilized in the restoration project to evaluate and balance sediment transport concerns, evaluate sinuosity and determine proposed grade line for the re-aligned river. HEC-RAS and GEO-RAS hydraulic models are utilized to evaluate flow regimes and determine acceptable plan-form geometries and proposed vegetation densities.To effectively mathematically model the approximately 20,000 new trees proposed to be planted in the re-aligned channel, the proposed vegetation is divided up into 4 discreet densities with corresponding roughness coefficients. Generally speaking, the higher the vegetation density, the higher the habitat “value,” therefore all vegetation in the channel that is not of the highest density is a hydraulic concession.Upon completion, the project will contain over 140 hectares of riparian habitat and over 2.7 million cubic meters of earth will be removed from the channel to offset the proposed vegetation. No negative impacts to the flood damage reduction capabilities of the river will occur.
The Mission Reach Ecosystem Restoration and Recreation (MR-ERR), part of the overall 13-mile San Antonio River Improvements Project, is addressed as an in-progress case study of an urban riparian re-forestation project. The project is a 160 million-dollar Federal, County, and City investment within urban San Antonio, Texas. This project is one of the largest civil works project within the United...
Author(s)
Robert Neil Thomas
SourceProceedings of the Water Environment Federation
SubjectSession 12 (URR): Texas and Other Foreign Countries
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:2L.1035;1-
DOI10.2175/193864710798284445
Volume / Issue2010 / 2
Content sourceCities of the Future/Urban River Restoration Conference
First / last page(s)1035 - 1041
Copyright2010
Word count406
Subject keywordsurban reforestationecosystem restorationre-vegetationriparian vegetation

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Robert Neil Thomas. Reforestation of the Mission Reach of the San Antonio River. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-297745CITANCHOR>.
Robert Neil Thomas. Reforestation of the Mission Reach of the San Antonio River. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-297745CITANCHOR.
Robert Neil Thomas
Reforestation of the Mission Reach of the San Antonio River
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-297745CITANCHOR