lastID = -297755
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-06-14 20:22:44 Adam Phillips
  • 2022-06-14 20:22:43 Adam Phillips
  • 2020-03-27 00:02:13 Adam Phillips
  • 2020-03-27 00:02:12 Adam Phillips
  • 2020-01-31 20:00:35 Administrator
  • 2020-01-31 20:00:34 Administrator
  • 2020-01-31 20:00:33 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach

Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach

Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach
Abstract
Malabar Sewage Treatment Plant (STP) serves a population of approximately 1.7 million making it the largest in Sydney. The STP is located in the suburb of Randwick in a coastal environment and is owned and operated by Sydney Water. The majority of the STP's treatment processes are located underground and ventilation is provided to ensure both a safe working atmosphere and odour containment. Its wastewater odour management system treats a maximum foul air flow of 810,000 m3/h (225 m3/s) making it the largest in Australia. Encroaching local development and an increase in odorous loads above original design thresholds are challenging the existing STP to remain regulatory compliant.MWH has recently completed a holistic odour management study of the STP to evaluate future performance and capital investment requirements. The objective of the study was to identify the most cost effective strategy for the STP to remain regulatory compliant over the next 30 years, whilst minimising capital outlay. Using a multi criteria analysis it was determined that optimising and upgrading existing assets to maximise their life was the best option followed by a replacement system.The foundation of the study has been the development of a detailed assessment of the existing ventilation (both clean air supply and foul extraction) and treatment facility (wet chemical scrubbers). Approximately 100 fans and several kilometres of ducting in sizes ranging from 0.1m to over 5m in cross section operate to ventilate the plant to the odour management facility. Working closely with Sydney Water, ventilation audits, odour characterisation, smoke and pressure testing have all been completed to confirm operational performance, identify optimisations and capabilities of the existing system to ultimately define potential savings in asset re-use.The audits have identified pinch points in the existing ventilation (excessive ventilation, no foul/clean air segregation, positive pressures) and treatment systems (packing types, heights, chemical storage and dosing capacities, recirculation flowrates). This approach allowed the maximum reuse of existing equipment to be included in the study recommendations (i.e. fans, ductwork, scrubber shells) together with replacement of dosing facilities, recirculation pumps and pipework and packing to improve installed equipment performance capability. Significant reductions in foul air flow (40% through segregation) have been identified to allow Sydney Water to consider future capital and operational costs savings come the end of the existing systems life.These improvements will achieve the required treatment capability, allowing deferment of capital expenditure for a new system. Consequently a ‘refurbishment then replacement ’ strategy has been proposed for the STP, minimising the requirement to replace existing facilities before the end of their expected life.The study has provided Sydney Water with the most cost effective strategy for maintaining regulatory compliance at Malabar STP now, and into the future.
Malabar Sewage Treatment Plant (STP) serves a population of approximately 1.7 million making it the largest in Sydney. The STP is located in the suburb of Randwick in a coastal environment and is owned and operated by Sydney Water. The majority of the STP's treatment processes are located underground and ventilation is provided to ensure both a safe working atmosphere and odour containment. Its...
Author(s)
Joseph OtterIan EvansonRod MacKenzieAdnan Firat
SourceProceedings of the Water Environment Federation
SubjectArticles
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:3L.207;1-
DOI10.2175/193864710802768316
Volume / Issue2010 / 3
Content sourceOdors and Air Pollutants Conference
First / last page(s)207 - 220
Copyright2010
Word count455
Subject keywordsWet Chemical ScrubbingWhole of LifeStrategic PlanningVentilation AuditCapital ExpenditureFoul Air Flow Reduction

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach
Pricing
Non-member price: $11.50
Member price:
-297755
Get access
-297755
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach
Abstract
Malabar Sewage Treatment Plant (STP) serves a population of approximately 1.7 million making it the largest in Sydney. The STP is located in the suburb of Randwick in a coastal environment and is owned and operated by Sydney Water. The majority of the STP's treatment processes are located underground and ventilation is provided to ensure both a safe working atmosphere and odour containment. Its wastewater odour management system treats a maximum foul air flow of 810,000 m3/h (225 m3/s) making it the largest in Australia. Encroaching local development and an increase in odorous loads above original design thresholds are challenging the existing STP to remain regulatory compliant.MWH has recently completed a holistic odour management study of the STP to evaluate future performance and capital investment requirements. The objective of the study was to identify the most cost effective strategy for the STP to remain regulatory compliant over the next 30 years, whilst minimising capital outlay. Using a multi criteria analysis it was determined that optimising and upgrading existing assets to maximise their life was the best option followed by a replacement system.The foundation of the study has been the development of a detailed assessment of the existing ventilation (both clean air supply and foul extraction) and treatment facility (wet chemical scrubbers). Approximately 100 fans and several kilometres of ducting in sizes ranging from 0.1m to over 5m in cross section operate to ventilate the plant to the odour management facility. Working closely with Sydney Water, ventilation audits, odour characterisation, smoke and pressure testing have all been completed to confirm operational performance, identify optimisations and capabilities of the existing system to ultimately define potential savings in asset re-use.The audits have identified pinch points in the existing ventilation (excessive ventilation, no foul/clean air segregation, positive pressures) and treatment systems (packing types, heights, chemical storage and dosing capacities, recirculation flowrates). This approach allowed the maximum reuse of existing equipment to be included in the study recommendations (i.e. fans, ductwork, scrubber shells) together with replacement of dosing facilities, recirculation pumps and pipework and packing to improve installed equipment performance capability. Significant reductions in foul air flow (40% through segregation) have been identified to allow Sydney Water to consider future capital and operational costs savings come the end of the existing systems life.These improvements will achieve the required treatment capability, allowing deferment of capital expenditure for a new system. Consequently a ‘refurbishment then replacement ’ strategy has been proposed for the STP, minimising the requirement to replace existing facilities before the end of their expected life.The study has provided Sydney Water with the most cost effective strategy for maintaining regulatory compliance at Malabar STP now, and into the future.
Malabar Sewage Treatment Plant (STP) serves a population of approximately 1.7 million making it the largest in Sydney. The STP is located in the suburb of Randwick in a coastal environment and is owned and operated by Sydney Water. The majority of the STP's treatment processes are located underground and ventilation is provided to ensure both a safe working atmosphere and odour containment. Its...
Author(s)
Joseph OtterIan EvansonRod MacKenzieAdnan Firat
SourceProceedings of the Water Environment Federation
SubjectArticles
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2010
ISSN1938-6478
SICI1938-6478(20100101)2010:3L.207;1-
DOI10.2175/193864710802768316
Volume / Issue2010 / 3
Content sourceOdors and Air Pollutants Conference
First / last page(s)207 - 220
Copyright2010
Word count455
Subject keywordsWet Chemical ScrubbingWhole of LifeStrategic PlanningVentilation AuditCapital ExpenditureFoul Air Flow Reduction

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Joseph Otter# Ian Evanson# Rod MacKenzie# Adnan Firat. Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 24 Sep. 2025. <https://www.accesswater.org?id=-297755CITANCHOR>.
Joseph Otter# Ian Evanson# Rod MacKenzie# Adnan Firat. Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed September 24, 2025. https://www.accesswater.org/?id=-297755CITANCHOR.
Joseph Otter# Ian Evanson# Rod MacKenzie# Adnan Firat
Australia's Largest Wastewater Odour Control Facility: A Whole Life Approach
Access Water
Water Environment Federation
December 22, 2018
September 24, 2025
https://www.accesswater.org/?id=-297755CITANCHOR