lastID = -298998
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:45:49 Adam Phillips
  • 2020-03-26 22:04:56 Adam Phillips
  • 2020-03-26 22:04:55 Adam Phillips
  • 2020-02-01 06:02:08 Administrator
  • 2020-02-01 06:02:07 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake

Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake

Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake
Abstract
When City of Lake Oswego officials and their design consultant realized that the interceptor sewer running through the middle of Oswego Lake was seismically unstable and undersized, they asked and were able to answer many difficult questions. “How do you replace a sewer in a lake? How do you support it? Will it work? Will it last? Can we maintain it? ” The result was an innovative pipeline, completed in May 2011 after a 10–year planning, design, and construction process. Total program cost for the program was 90 million to replace and rehabilitate undersized, deteriorating lines with a system designed to last at least 100 years.The innovative Lake Oswego Interceptor Sewer features a new 10,000—foot-long buoyant gravity pipeline consisting of 22- to 42-inch high density polyethylene (HDPE) pipe. The buoyant sewer is held to proper grade 11 to 18 feet beneath the lake surface by 428 ground anchors and tethers. A serpentine alignment provides thermal expansion loops to maintain grade despite wide-ranging water temperature. Stainless steel manholes are also buoyant and submerged, with access via removable caissons. The system also includes 7,000 feet of new pile-supported interceptor consisting of 22- to 42-inch HDPE pipe supported by 320 individual 18-inch piles. Rehabilitation of 6,000 feet of existing 18- to 36-inch-diameter sewers with cured-in-place pipe (CIPP) will extend the useful life of existing segments that are adequately sized and supported.Construction of the project was divided into two major phases: Lake Full (completed while the lake was full) and Lake Down (completed while the lake was drawn down 24 feet). Marine pipeline work was conducted during the lake full phase, and final connections and associated excavations were made during the lake down phase. General contractors and key subcontractors were prequalified to ensure that skilled and experienced teams would be conducting the work. The complexities of the design, as well as the related installation issues and inevitable problemsolving that occurred during construction, warranted significant involvement by the design team and an experienced construction manager. This resulted in strong communication between all parties to enable construction issues to be solved quickly and efficiently.Visit www.lakeinterceptor.com and view the professionally-produced “webisodes” to gain additional insight into this remarkable project.
When City of Lake Oswego officials and their design consultant realized that the interceptor sewer running through the middle of Oswego Lake was seismically unstable and undersized, they asked and were able to answer many difficult questions. “How do you replace a sewer in a lake? How do you support it? Will it work? Will it last? Can we maintain it? ” The result was an innovative...
Author(s)
Pete OvesonJon HollandJoel Komarek
SourceProceedings of the Water Environment Federation
SubjectSession 11: Construct/Design
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:5L.683;1-
DOI10.2175/193864711802837228
Volume / Issue2011 / 5
Content sourceCollection Systems Conference
First / last page(s)683 - 705
Copyright2011
Word count375
Subject keywordsHDPE pipelinemarine pipelinebuoyant pipelinesewer

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake
Pricing
Non-member price: $11.50
Member price:
-298998
Get access
-298998
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake
Abstract
When City of Lake Oswego officials and their design consultant realized that the interceptor sewer running through the middle of Oswego Lake was seismically unstable and undersized, they asked and were able to answer many difficult questions. “How do you replace a sewer in a lake? How do you support it? Will it work? Will it last? Can we maintain it? ” The result was an innovative pipeline, completed in May 2011 after a 10–year planning, design, and construction process. Total program cost for the program was 90 million to replace and rehabilitate undersized, deteriorating lines with a system designed to last at least 100 years.The innovative Lake Oswego Interceptor Sewer features a new 10,000—foot-long buoyant gravity pipeline consisting of 22- to 42-inch high density polyethylene (HDPE) pipe. The buoyant sewer is held to proper grade 11 to 18 feet beneath the lake surface by 428 ground anchors and tethers. A serpentine alignment provides thermal expansion loops to maintain grade despite wide-ranging water temperature. Stainless steel manholes are also buoyant and submerged, with access via removable caissons. The system also includes 7,000 feet of new pile-supported interceptor consisting of 22- to 42-inch HDPE pipe supported by 320 individual 18-inch piles. Rehabilitation of 6,000 feet of existing 18- to 36-inch-diameter sewers with cured-in-place pipe (CIPP) will extend the useful life of existing segments that are adequately sized and supported.Construction of the project was divided into two major phases: Lake Full (completed while the lake was full) and Lake Down (completed while the lake was drawn down 24 feet). Marine pipeline work was conducted during the lake full phase, and final connections and associated excavations were made during the lake down phase. General contractors and key subcontractors were prequalified to ensure that skilled and experienced teams would be conducting the work. The complexities of the design, as well as the related installation issues and inevitable problemsolving that occurred during construction, warranted significant involvement by the design team and an experienced construction manager. This resulted in strong communication between all parties to enable construction issues to be solved quickly and efficiently.Visit www.lakeinterceptor.com and view the professionally-produced “webisodes” to gain additional insight into this remarkable project.
When City of Lake Oswego officials and their design consultant realized that the interceptor sewer running through the middle of Oswego Lake was seismically unstable and undersized, they asked and were able to answer many difficult questions. “How do you replace a sewer in a lake? How do you support it? Will it work? Will it last? Can we maintain it? ” The result was an innovative...
Author(s)
Pete OvesonJon HollandJoel Komarek
SourceProceedings of the Water Environment Federation
SubjectSession 11: Construct/Design
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2011
ISSN1938-6478
SICI1938-6478(20110101)2011:5L.683;1-
DOI10.2175/193864711802837228
Volume / Issue2011 / 5
Content sourceCollection Systems Conference
First / last page(s)683 - 705
Copyright2011
Word count375
Subject keywordsHDPE pipelinemarine pipelinebuoyant pipelinesewer

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Pete Oveson# Jon Holland# Joel Komarek. Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 2 Oct. 2025. <https://www.accesswater.org?id=-298998CITANCHOR>.
Pete Oveson# Jon Holland# Joel Komarek. Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 2, 2025. https://www.accesswater.org/?id=-298998CITANCHOR.
Pete Oveson# Jon Holland# Joel Komarek
Unique Challenges Drive Innovative Solution – Buoyant Interceptor Sewer in a Lake
Access Water
Water Environment Federation
December 22, 2018
October 2, 2025
https://www.accesswater.org/?id=-298998CITANCHOR