lastID = -10033695
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2023-08-16 07:49:10 Adam Phillips
  • 2022-05-04 20:14:05 Adam Phillips
  • 2021-02-04 16:17:38 Andrea Cale
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads

Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads

Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads
Abstract
The Susquehanna Township Authority (STA), a tributary community to Capital Region Water (formerly the Harrisburg Authority) owns and operates over 130 miles of separate sanitary sewer facilities divided into four (4) drainage basins, along with seven (7) pump stations. The original portions of the system, many of which still exist, were constructed the late 1960's. Extensive infiltration and inflow, a common problem in aged infrastructure, leads to system capacity issues, additional costs, and ultimately sanitary sewer overflows (SSO). In the case of the Susquehanna Township Authority, SSO's came frequently enough that the Pennsylvania Department of Environmental Protection issued a Notice of Violation for hydraulically overloaded conditions in the two largest (Paxton Creek and Asylum Run) of the Authority's four main drainage basins. With this notice, the Authority was no longer able to connect additional growth until a Corrective Action Plan (CAP) was prepared and Consent Order and Agreement (COA) negotiated. The Authority prepared a CAP that included a comprehensive rehabilitation plan for the two affected drainage basins, based on wet weather flow measurement and sub-basin prioritization. The CAP was approved in 2013 and the COA in 2019. The COA requires STA eliminate all overflows in the Paxton Creek and Asylum Run Basins by June 30, 2024.
The Susquehanna Township Authority (STA), a tributary community to Capital Region Water (formerly the Harrisburg Authority) owns and operates over 130 miles of separate sanitary sewer facilities divided into four (4) drainage basins, along with seven (7) pump stations. The original portions of the system, many of which still exist, were constructed the late 1960's. Extensive infiltration and inflow, a common problem in aged infrastructure, leads to system capacity issues, additional costs, and ultimately sanitary sewer overflows (SSO). In the case of the Susquehanna Township Authority, SSO's came frequently enough that the Pennsylvania Department of Environmental Protection issued a Notice of Violation for hydraulically overloaded conditions in the two largest (Paxton Creek and Asylum Run) of the Authority's four main drainage basins. With this notice, the Authority was no longer able to connect additional growth until a Corrective Action Plan (CAP) was prepared and Consent Order and Agreement (COA) negotiated. The Authority prepared a CAP that included a comprehensive rehabilitation plan for the two affected drainage basins, based on wet weather flow measurement and sub-basin prioritization. The CAP was approved in 2013 and the COA in 2019. The COA requires STA eliminate all overflows in the Paxton Creek and Asylum Run Basins by June 30, 2024.
Author(s)
Joel KostelacJosiah Bair
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jun 2020
ISSN1938-6478
DOI10.2175/193864718825157575
Volume / Issue
Content sourceCollection Systems Conference
Copyright2020
Word count19
Subject keywordsSanitary Sewer Overflows

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads
Pricing
Non-member price: $11.50
Member price:
-10033695
Get access
-10033695
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads
Abstract
The Susquehanna Township Authority (STA), a tributary community to Capital Region Water (formerly the Harrisburg Authority) owns and operates over 130 miles of separate sanitary sewer facilities divided into four (4) drainage basins, along with seven (7) pump stations. The original portions of the system, many of which still exist, were constructed the late 1960's. Extensive infiltration and inflow, a common problem in aged infrastructure, leads to system capacity issues, additional costs, and ultimately sanitary sewer overflows (SSO). In the case of the Susquehanna Township Authority, SSO's came frequently enough that the Pennsylvania Department of Environmental Protection issued a Notice of Violation for hydraulically overloaded conditions in the two largest (Paxton Creek and Asylum Run) of the Authority's four main drainage basins. With this notice, the Authority was no longer able to connect additional growth until a Corrective Action Plan (CAP) was prepared and Consent Order and Agreement (COA) negotiated. The Authority prepared a CAP that included a comprehensive rehabilitation plan for the two affected drainage basins, based on wet weather flow measurement and sub-basin prioritization. The CAP was approved in 2013 and the COA in 2019. The COA requires STA eliminate all overflows in the Paxton Creek and Asylum Run Basins by June 30, 2024.
The Susquehanna Township Authority (STA), a tributary community to Capital Region Water (formerly the Harrisburg Authority) owns and operates over 130 miles of separate sanitary sewer facilities divided into four (4) drainage basins, along with seven (7) pump stations. The original portions of the system, many of which still exist, were constructed the late 1960's. Extensive infiltration and inflow, a common problem in aged infrastructure, leads to system capacity issues, additional costs, and ultimately sanitary sewer overflows (SSO). In the case of the Susquehanna Township Authority, SSO's came frequently enough that the Pennsylvania Department of Environmental Protection issued a Notice of Violation for hydraulically overloaded conditions in the two largest (Paxton Creek and Asylum Run) of the Authority's four main drainage basins. With this notice, the Authority was no longer able to connect additional growth until a Corrective Action Plan (CAP) was prepared and Consent Order and Agreement (COA) negotiated. The Authority prepared a CAP that included a comprehensive rehabilitation plan for the two affected drainage basins, based on wet weather flow measurement and sub-basin prioritization. The CAP was approved in 2013 and the COA in 2019. The COA requires STA eliminate all overflows in the Paxton Creek and Asylum Run Basins by June 30, 2024.
Author(s)
Joel KostelacJosiah Bair
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jun 2020
ISSN1938-6478
DOI10.2175/193864718825157575
Volume / Issue
Content sourceCollection Systems Conference
Copyright2020
Word count19
Subject keywordsSanitary Sewer Overflows

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Joel Kostelac#Josiah Bair. Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads. Water Environment Federation, 2021. Web. 28 Sep. 2025. <https://www.accesswater.org?id=-10033695CITANCHOR>.
Joel Kostelac#Josiah Bair. Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads. Water Environment Federation, 2021. Accessed September 28, 2025. https://www.accesswater.org/?id=-10033695CITANCHOR.
Joel Kostelac#Josiah Bair
Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads
Access Water
Water Environment Federation
February 4, 2021
September 28, 2025
https://www.accesswater.org/?id=-10033695CITANCHOR