lastID = -10102407
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: A City with a Plan is a City with a Vision. Developing the City-Wide Sewer...
A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2024-04-09 07:26:57 Adam Phillips
  • 2024-04-08 21:59:35 Adam Phillips Release
  • 2024-04-08 21:38:26 Adam Phillips
  • 2024-04-08 21:07:02 Adam Phillips
  • 2024-04-08 20:48:58 Adam Phillips
  • 2024-04-08 16:40:03 Adam Phillips
  • 2024-04-08 15:34:24 Adam Phillips
  • 2024-04-08 14:44:39 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: A City with a Plan is a City with a Vision. Developing the City-Wide Sewer...
A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA

A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA

A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: A City with a Plan is a City with a Vision. Developing the City-Wide Sewer...
A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA
Abstract
The City of Chelsea, MA is strategically located as a gateway between downtown Boston and North Shore communities and is home to a vibrant, diverse population and industry that contribute significantly to the overall wealth of the region. Chelsea is served by the Massachusetts Water Resources Authority (MWRA) for water supply and wastewater collection. Many MWRA interceptors and a major regional headworks and pumping station are located in Chelsea. Like many other coastal communities in New England, Chelsea is serviced by a mix of combined and separated sewer systems that were built more than a century ago and are at the end of their service life. This outdated infrastructure hinders new development and growth, especially in the context of increased precipitation and coastal-induced inundation risk due to climate change. As a response to this concern, Chelsea has embarked on a city-wide master plan for sewer separation and infrastructure upgrades to systematically work towards attainment of the following three main goals: 1. Allow for future growth by progressively upgrading drainage infrastructure able to accommodate future population and increased stresses from climate change; 2. Eliminate CSOs by separating existing combined sewer areas and; 3. Reduce inflows to sanitary pipes from public and private properties that currently decrease available system capacity and increase operating costs to the City. In order to create this ambitious program, a significant modeling effort was carried out following a multi-step process. The first step consisted of building and calibrating a city-wide drainage model to help understand points with weak level of service and estimate peak flow and volumes reaching the MWRA interceptors and combined sewer overflows during dry and wet weather events. The City-wide model was built in Infoworks ICM using pipe network data from multiple sources such as record drawings, GIS, field inspections, and recently collected ground-level LiDAR information captured city-wide. The second step of the process consisted of developing conceptual level pipe layouts with the goal to achieve sewer separation city-wide and improve level of service. The conceptual level plans were developed using a 'best case scenario' approach (i.e. assuming an ideal drainage network can be built without necessarily accounting for other factors such as utility conflicts or permitting issues for new outfalls). The reasoning behind this approach was the desire to delineate a network able to attain optimum hydraulic performance based on natural topography and street layout and then work backwards, if needed, when conflicts identified during later phases of the process require this layout to be modified. The conceptual storm and sanitary systems were then incorporated into an Infoworks ICM model, which was used to fine tune the conceptual network (e.g. pipe slopes, pipe sizes necessary to provide the desired level of service or flow velocities for a given event). The third step was a planning level engineering effort where a street-by-street evaluation at each sewershed was performed. The feasibility and actions needed to go from the current condition to the proposed condition in the conceptual model were evaluated and alternative actions proposed when identified conflicts could not be resolved. The fourth and final step consisted of packaging and phasing the execution of the sewer separation and inflow reduction projects based on feasibility, City's priorities and constraints, as well as interim system conditions. This product is the City's new Master Plan for Sewer Separation and Drainage Infrastructure Upgrades, which will provide a systematic approach to drainage infrastructure improvements over the next few decades.
This paper was presented at the WEF Collection Systems and Stormwater Conference, April 9-12, 2024.
SpeakerMammolette, Lou
Presentation time
14:30:00
15:00:00
Session time
13:30:00
16:45:00
SessionCombined Sewer Overflow
Session number07
Session locationConnecticut Convention Center, Hartford, Connecticut
TopicCollaboration, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Flow control, Long Term Control Planning, Modeling, Predictive Analytics, Public Education/Information/Communication, Pump station, forcemain, Regulatory Compliance - Collection Systems, Sewer Separation, Wet Weather
TopicCollaboration, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Flow control, Long Term Control Planning, Modeling, Predictive Analytics, Public Education/Information/Communication, Pump station, forcemain, Regulatory Compliance - Collection Systems, Sewer Separation, Wet Weather
Author(s)
Mammolette, Lou
Author(s)L. Mammolette1, D. Bedoya
Author affiliation(s)Dewberry Engineers Inc. 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Apr 2024
DOI10.2175/193864718825159402
Volume / Issue
Content sourceCollection Systems and Stormwater Conference
Copyright2024
Word count22

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: A City with a Plan is a City with a Vision. Developing the City-Wide Sewer...
A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA
Pricing
Non-member price: $11.50
Member price:
-10102407
Get access
-10102407
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: A City with a Plan is a City with a Vision. Developing the City-Wide Sewer...
A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA
Abstract
The City of Chelsea, MA is strategically located as a gateway between downtown Boston and North Shore communities and is home to a vibrant, diverse population and industry that contribute significantly to the overall wealth of the region. Chelsea is served by the Massachusetts Water Resources Authority (MWRA) for water supply and wastewater collection. Many MWRA interceptors and a major regional headworks and pumping station are located in Chelsea. Like many other coastal communities in New England, Chelsea is serviced by a mix of combined and separated sewer systems that were built more than a century ago and are at the end of their service life. This outdated infrastructure hinders new development and growth, especially in the context of increased precipitation and coastal-induced inundation risk due to climate change. As a response to this concern, Chelsea has embarked on a city-wide master plan for sewer separation and infrastructure upgrades to systematically work towards attainment of the following three main goals: 1. Allow for future growth by progressively upgrading drainage infrastructure able to accommodate future population and increased stresses from climate change; 2. Eliminate CSOs by separating existing combined sewer areas and; 3. Reduce inflows to sanitary pipes from public and private properties that currently decrease available system capacity and increase operating costs to the City. In order to create this ambitious program, a significant modeling effort was carried out following a multi-step process. The first step consisted of building and calibrating a city-wide drainage model to help understand points with weak level of service and estimate peak flow and volumes reaching the MWRA interceptors and combined sewer overflows during dry and wet weather events. The City-wide model was built in Infoworks ICM using pipe network data from multiple sources such as record drawings, GIS, field inspections, and recently collected ground-level LiDAR information captured city-wide. The second step of the process consisted of developing conceptual level pipe layouts with the goal to achieve sewer separation city-wide and improve level of service. The conceptual level plans were developed using a 'best case scenario' approach (i.e. assuming an ideal drainage network can be built without necessarily accounting for other factors such as utility conflicts or permitting issues for new outfalls). The reasoning behind this approach was the desire to delineate a network able to attain optimum hydraulic performance based on natural topography and street layout and then work backwards, if needed, when conflicts identified during later phases of the process require this layout to be modified. The conceptual storm and sanitary systems were then incorporated into an Infoworks ICM model, which was used to fine tune the conceptual network (e.g. pipe slopes, pipe sizes necessary to provide the desired level of service or flow velocities for a given event). The third step was a planning level engineering effort where a street-by-street evaluation at each sewershed was performed. The feasibility and actions needed to go from the current condition to the proposed condition in the conceptual model were evaluated and alternative actions proposed when identified conflicts could not be resolved. The fourth and final step consisted of packaging and phasing the execution of the sewer separation and inflow reduction projects based on feasibility, City's priorities and constraints, as well as interim system conditions. This product is the City's new Master Plan for Sewer Separation and Drainage Infrastructure Upgrades, which will provide a systematic approach to drainage infrastructure improvements over the next few decades.
This paper was presented at the WEF Collection Systems and Stormwater Conference, April 9-12, 2024.
SpeakerMammolette, Lou
Presentation time
14:30:00
15:00:00
Session time
13:30:00
16:45:00
SessionCombined Sewer Overflow
Session number07
Session locationConnecticut Convention Center, Hartford, Connecticut
TopicCollaboration, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Flow control, Long Term Control Planning, Modeling, Predictive Analytics, Public Education/Information/Communication, Pump station, forcemain, Regulatory Compliance - Collection Systems, Sewer Separation, Wet Weather
TopicCollaboration, Combined Sewer Overflow, Combined Sewer System, Construction, Deep Sewer Tunnel, Flow control, Long Term Control Planning, Modeling, Predictive Analytics, Public Education/Information/Communication, Pump station, forcemain, Regulatory Compliance - Collection Systems, Sewer Separation, Wet Weather
Author(s)
Mammolette, Lou
Author(s)L. Mammolette1, D. Bedoya
Author affiliation(s)Dewberry Engineers Inc. 1
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Apr 2024
DOI10.2175/193864718825159402
Volume / Issue
Content sourceCollection Systems and Stormwater Conference
Copyright2024
Word count22

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Mammolette, Lou. A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA. Water Environment Federation, 2024. Web. 20 Jun. 2025. <https://www.accesswater.org?id=-10102407CITANCHOR>.
Mammolette, Lou. A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA. Water Environment Federation, 2024. Accessed June 20, 2025. https://www.accesswater.org/?id=-10102407CITANCHOR.
Mammolette, Lou
A City with a Plan is a City with a Vision. Developing the City-Wide Sewer Separation Master Plan in Chelsea, MA
Access Water
Water Environment Federation
April 10, 2024
June 20, 2025
https://www.accesswater.org/?id=-10102407CITANCHOR