Access Water | Commissioning a Biosolids Gasifier System at a Water Resource Recovery...
lastID = -10118814
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Loading icon
Description: Access Water
Context Menu
Description: Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2025-10-23 10:20:50 Adam Phillips
  • 2025-09-25 06:55:28 Adam Phillips Continuous release
  • 2025-09-16 15:59:19 Adam Phillips
  • 2025-09-04 05:41:37 Adam Phillips
  • 2025-09-02 21:08:19 Adam Phillips
  • 2025-09-02 16:15:42 Adam Phillips
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility

Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility

Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Abstract
INTRODUCTION
The City of Edmonds' Carbon Recovery Project comprises a biosolids dryer, gasifier, and associated material handling equipment. This gasifier system is an emerging technology to produce Class A biosolids, biochar, or sand. The City of Edmonds (COE) is one of the first municipalities in North America to use gasification to process wastewater solids. The gasifier replaced a fluidized bed incinerator (FBI) that had reached the end of its service life at the Edmonds Wastewater Treatment Plant (WWTP). The Edmonds WWTP is in downtown Edmonds, WA on a tight site, adjacent to the Ferry Terminal Lanes. Figure 1 is an aerial picture of the Edmonds plant. Much of the facility is underground and primary sedimentation with conventional activated sludge is used to treat an average wastewater flow of 5.6 MGD (21 MLD). The main components of the gasifier system are the gasifier (Figure 2) and the rotary drum dryer (Figure 3). If space were available at the site, installing anaerobic digestion prior to drying and gasification would have been an option. This project was delivered by the Washington Department of Enterprise Systems (DES) through an Energy Services Company (ESCO). The ESCO was the overall project provider. A gasifier system provider (GSP) was the process designer, technology provider, and commissioning/training provider.

Several issues were encountered during construction and commissioning this new gasifier system and it took over two years longer than expected. Since the project began in 2020 (Parry 2020) and during this extended commissioning period, dewatered sludge was hauled to a landfill costing over $5 million. Construction during the COVID pandemic delayed the project well over a year. Incomplete installation issues delayed the startup by the GSP for months. Leadership changes at the COE, DES, and the ESCO also contributed to the delay. A change in operation and maintenance (O&M) management of the wastewater treatment plant delayed the commissioning required more training to accept the new gasification technology and integrate it into overall plant O&M. Only the leadership at the GSP remained the same through the project.

METHODOLOGY
DES hired an engineering consultant (EC) with expertise in designing and operating gasification systems (Parry 2012) to facilitate commissioning the project. The consultant led a 3-day project chartering session with the COE, DES, ESCO, and GSP that resulted in collaboratively working towards a common goal of commissioning and operating the gasifier system. After the chartering session, the gasifier system was successfully operated for four weeks, as witnessed by the EC, and DES issued the 'Limited Substantial Completion' for the project. Figure 4 is a picture of a COE operator controlling the system with guidance from the GSP operator. After the substantial completion of the project, the focus turned to operating the gasifier system. The city issued a six-month O&M contract with the GSP to assist the city with O&M of the gasifier system and provide more training to city O&M staff. Under this arrangement, the city operated the wastewater treatment plant and the gasifier system with the support of the GSP.

The EC prepared a mass and energy model of the overall liquid and solids processing to guide the operation of the gasifier system. The model started with the sludge inventory in the primaries and aeration basin. Management of the sludge inventory determines the amount of primary sludge (PS) and waste activated sludge (WAS) pumped to the blend tank. Blended sludge is dewatered by screw presses and dewatered cake is conveyed to the cake hopper. Dewatered cake is pumped from the cake hopper and mixed with dried biosolids to the gasifier and dryer.

RESULTS
The city is now operating the gasifier system as an integral part of the wastewater treatment plant and avoiding the high cost of hauling and disposing of dewatered cake. The city can produce a sustainable biochar product or a sand product for beneficial use as the biochar market develops. The city isn't dependent on developing a Class A biosolids market and dealing with PFAS issues. DISCUSSION The successful construction, commissioning, and operation of the gasifier system is progress toward resource recovery. It meets the original objectives of the Carbon Recovery project to provide the flexibility to produce biochar or sand. The gasifier system including the dryer fit in the limited space where the FBI was removed. With the limited space at the Edmonds WWTP, there wasn't room for anaerobic digesters. Anaerobic digestion would have provided a lower, consistent energy content that would have been easier to manage in operating the gasifier system. However, the gasifier system could handle the varying blend.

CONCLUSIONS
The Carbon Recovery Project was a success and provides the COE a sustainable solids processing system. The FBI system was replaced with an integrated gasifier and drying system to recover valuable resources of biochar and sand. The gasifier system is operating as an integral part of the overall wastewater treatment and solids processing system at the Edmonds WWTP. Management of other water resource recovery facilities can benefit from the lessons learned constructing, commissioning, and operating one of the first gasifier system in North America at a WRRF.
This paper was presented at WEFTEC 2025, held September 27-October 1, 2025 in Chicago, Illinois.
Presentation time
11:30:00
11:45:00
Session time
10:30:00
12:00:00
SessionLessons from Biosolids Project Startups
Session locationMcCormick Place, Chicago, Illinois, USA
TopicBiosolids & Residuals
TopicBiosolids & Residuals
Author(s)
Parry, David, Pfister, Nick, Williams, Phil, Mooney, Dave
Author(s)D. Parry1, N. Pfister1, P. Williams2, D. Mooney3
Author affiliation(s)Jacobs1, City of Edmonds2, Ecoremedy3
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct 2025
DOI10.2175/193864718825160080
Volume / Issue
Content sourceWEFTEC
Copyright2025
Word count12

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Pricing
Non-member price: $11.50
Member price:
-10118814
Get access
-10118814
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Abstract
INTRODUCTION
The City of Edmonds' Carbon Recovery Project comprises a biosolids dryer, gasifier, and associated material handling equipment. This gasifier system is an emerging technology to produce Class A biosolids, biochar, or sand. The City of Edmonds (COE) is one of the first municipalities in North America to use gasification to process wastewater solids. The gasifier replaced a fluidized bed incinerator (FBI) that had reached the end of its service life at the Edmonds Wastewater Treatment Plant (WWTP). The Edmonds WWTP is in downtown Edmonds, WA on a tight site, adjacent to the Ferry Terminal Lanes. Figure 1 is an aerial picture of the Edmonds plant. Much of the facility is underground and primary sedimentation with conventional activated sludge is used to treat an average wastewater flow of 5.6 MGD (21 MLD). The main components of the gasifier system are the gasifier (Figure 2) and the rotary drum dryer (Figure 3). If space were available at the site, installing anaerobic digestion prior to drying and gasification would have been an option. This project was delivered by the Washington Department of Enterprise Systems (DES) through an Energy Services Company (ESCO). The ESCO was the overall project provider. A gasifier system provider (GSP) was the process designer, technology provider, and commissioning/training provider.

Several issues were encountered during construction and commissioning this new gasifier system and it took over two years longer than expected. Since the project began in 2020 (Parry 2020) and during this extended commissioning period, dewatered sludge was hauled to a landfill costing over $5 million. Construction during the COVID pandemic delayed the project well over a year. Incomplete installation issues delayed the startup by the GSP for months. Leadership changes at the COE, DES, and the ESCO also contributed to the delay. A change in operation and maintenance (O&M) management of the wastewater treatment plant delayed the commissioning required more training to accept the new gasification technology and integrate it into overall plant O&M. Only the leadership at the GSP remained the same through the project.

METHODOLOGY
DES hired an engineering consultant (EC) with expertise in designing and operating gasification systems (Parry 2012) to facilitate commissioning the project. The consultant led a 3-day project chartering session with the COE, DES, ESCO, and GSP that resulted in collaboratively working towards a common goal of commissioning and operating the gasifier system. After the chartering session, the gasifier system was successfully operated for four weeks, as witnessed by the EC, and DES issued the 'Limited Substantial Completion' for the project. Figure 4 is a picture of a COE operator controlling the system with guidance from the GSP operator. After the substantial completion of the project, the focus turned to operating the gasifier system. The city issued a six-month O&M contract with the GSP to assist the city with O&M of the gasifier system and provide more training to city O&M staff. Under this arrangement, the city operated the wastewater treatment plant and the gasifier system with the support of the GSP.

The EC prepared a mass and energy model of the overall liquid and solids processing to guide the operation of the gasifier system. The model started with the sludge inventory in the primaries and aeration basin. Management of the sludge inventory determines the amount of primary sludge (PS) and waste activated sludge (WAS) pumped to the blend tank. Blended sludge is dewatered by screw presses and dewatered cake is conveyed to the cake hopper. Dewatered cake is pumped from the cake hopper and mixed with dried biosolids to the gasifier and dryer.

RESULTS
The city is now operating the gasifier system as an integral part of the wastewater treatment plant and avoiding the high cost of hauling and disposing of dewatered cake. The city can produce a sustainable biochar product or a sand product for beneficial use as the biochar market develops. The city isn't dependent on developing a Class A biosolids market and dealing with PFAS issues. DISCUSSION The successful construction, commissioning, and operation of the gasifier system is progress toward resource recovery. It meets the original objectives of the Carbon Recovery project to provide the flexibility to produce biochar or sand. The gasifier system including the dryer fit in the limited space where the FBI was removed. With the limited space at the Edmonds WWTP, there wasn't room for anaerobic digesters. Anaerobic digestion would have provided a lower, consistent energy content that would have been easier to manage in operating the gasifier system. However, the gasifier system could handle the varying blend.

CONCLUSIONS
The Carbon Recovery Project was a success and provides the COE a sustainable solids processing system. The FBI system was replaced with an integrated gasifier and drying system to recover valuable resources of biochar and sand. The gasifier system is operating as an integral part of the overall wastewater treatment and solids processing system at the Edmonds WWTP. Management of other water resource recovery facilities can benefit from the lessons learned constructing, commissioning, and operating one of the first gasifier system in North America at a WRRF.
This paper was presented at WEFTEC 2025, held September 27-October 1, 2025 in Chicago, Illinois.
Presentation time
11:30:00
11:45:00
Session time
10:30:00
12:00:00
SessionLessons from Biosolids Project Startups
Session locationMcCormick Place, Chicago, Illinois, USA
TopicBiosolids & Residuals
TopicBiosolids & Residuals
Author(s)
Parry, David, Pfister, Nick, Williams, Phil, Mooney, Dave
Author(s)D. Parry1, N. Pfister1, P. Williams2, D. Mooney3
Author affiliation(s)Jacobs1, City of Edmonds2, Ecoremedy3
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct 2025
DOI10.2175/193864718825160080
Volume / Issue
Content sourceWEFTEC
Copyright2025
Word count12

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2025 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Parry, David. Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility. Water Environment Federation, 2025. Web. 25 Oct. 2025. <https://www.accesswater.org?id=-10118814CITANCHOR>.
Parry, David. Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility. Water Environment Federation, 2025. Accessed October 25, 2025. https://www.accesswater.org/?id=-10118814CITANCHOR.
Parry, David
Commissioning a Biosolids Gasifier System at a Water Resource Recovery Facility
Access Water
Water Environment Federation
October 1, 2025
October 25, 2025
https://www.accesswater.org/?id=-10118814CITANCHOR