lastID = -280314
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: W12-Proceedings
Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-31 01:04:33 Adam Phillips
  • 2020-03-31 01:04:32 Adam Phillips
  • 2020-02-01 01:01:06 Administrator
  • 2020-02-01 01:01:05 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: W12-Proceedings
Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia

Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia

Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: W12-Proceedings
Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia
Abstract
The Gold Coast region of south-east Queensland (Australia) has a population of approximately 515,000 persons and is projected to increase by up to 16,000 persons per annum. This case study examined the urban water cycle of the Gold Coast under two scenarios of infrastructure provision, namely: (1) the ‘Traditional’ mix, as operating in 2007-8, prior to the commissioning of large-scale water recycling and desalination schemes in this region; and (2) a semihypothetical ‘Future’ mix that includes seawater desalination, rainwater tanks and water recycling (namely, ‘third pipe’ Class A+ to a limited number of the total households; and indirect potable reuse via a dam from the largest wastewater treatment plant in the area). By assumption, the projected future water supply needs of the region would be met largely by a combination of desalination, water recycling and domestic rainwater tanks, but only limited additional supply from dams. Life Cycle Assessment (LCA) methodology was applied to these two scenarios in an effort to identify as broadly a possible the environmental impact potentials of adopting more energy and materials-intensive future water supply alternatives in order to service a growing population. The study found that the technologically more complex options of water supply (i.e. water recycling, desalination), as well as rainwater tanks, have the potential to increase environmental impacts on a ‘per unit volume of water’ basis in most impact categories (including ecotoxicity, human toxicity, global warming, ozone depletion and metals depletion), compared with the ‘Traditional’ supply mainly via dams. Only eutrophication potential (through more advanced treatment and reduced nutrient load discharges) and freshwater extraction (through reduced reliance on dams) would be reduced, in relative terms. Wastewater treatment and associated activities dominated environmental impacts in relative terms for the ‘Traditional’ urban water cycle as a whole. Nevertheless, the increase in impacts due to future alternative water supplies (recycling, desalination and rainwater tanks), was noticeable in the ‘Future’ scenario. Achieving a balance between these opposing environmental impact potentials presents a challenge to urban water planners and operators in the context of achieving sustainability goals in the face of a growing population and/or diminishing water supplies from existing dams.
The Gold Coast region of south-east Queensland (Australia) has a population of approximately 515,000 persons and is projected to increase by up to 16,000 persons per annum. This case study examined the urban water cycle of the Gold Coast under two scenarios of infrastructure provision, namely: (1) the ‘Traditional’ mix, as operating in 2007-8, prior to the commissioning of large-scale...
Author(s)
David de HaasJoe LanePaul Lant
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811709562
Volume / Issue2012 / 10
Content sourceWEFTEC
Copyright2012
Word count367

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: W12-Proceedings
Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia
Pricing
Non-member price: $11.50
Member price:
-280314
Get access
-280314
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: W12-Proceedings
Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia
Abstract
The Gold Coast region of south-east Queensland (Australia) has a population of approximately 515,000 persons and is projected to increase by up to 16,000 persons per annum. This case study examined the urban water cycle of the Gold Coast under two scenarios of infrastructure provision, namely: (1) the ‘Traditional’ mix, as operating in 2007-8, prior to the commissioning of large-scale water recycling and desalination schemes in this region; and (2) a semihypothetical ‘Future’ mix that includes seawater desalination, rainwater tanks and water recycling (namely, ‘third pipe’ Class A+ to a limited number of the total households; and indirect potable reuse via a dam from the largest wastewater treatment plant in the area). By assumption, the projected future water supply needs of the region would be met largely by a combination of desalination, water recycling and domestic rainwater tanks, but only limited additional supply from dams. Life Cycle Assessment (LCA) methodology was applied to these two scenarios in an effort to identify as broadly a possible the environmental impact potentials of adopting more energy and materials-intensive future water supply alternatives in order to service a growing population. The study found that the technologically more complex options of water supply (i.e. water recycling, desalination), as well as rainwater tanks, have the potential to increase environmental impacts on a ‘per unit volume of water’ basis in most impact categories (including ecotoxicity, human toxicity, global warming, ozone depletion and metals depletion), compared with the ‘Traditional’ supply mainly via dams. Only eutrophication potential (through more advanced treatment and reduced nutrient load discharges) and freshwater extraction (through reduced reliance on dams) would be reduced, in relative terms. Wastewater treatment and associated activities dominated environmental impacts in relative terms for the ‘Traditional’ urban water cycle as a whole. Nevertheless, the increase in impacts due to future alternative water supplies (recycling, desalination and rainwater tanks), was noticeable in the ‘Future’ scenario. Achieving a balance between these opposing environmental impact potentials presents a challenge to urban water planners and operators in the context of achieving sustainability goals in the face of a growing population and/or diminishing water supplies from existing dams.
The Gold Coast region of south-east Queensland (Australia) has a population of approximately 515,000 persons and is projected to increase by up to 16,000 persons per annum. This case study examined the urban water cycle of the Gold Coast under two scenarios of infrastructure provision, namely: (1) the ‘Traditional’ mix, as operating in 2007-8, prior to the commissioning of large-scale...
Author(s)
David de HaasJoe LanePaul Lant
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Sep, 2012
ISSN1938-6478
DOI10.2175/193864712811709562
Volume / Issue2012 / 10
Content sourceWEFTEC
Copyright2012
Word count367

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
David de Haas# Joe Lane# Paul Lant. Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 3 Oct. 2025. <https://www.accesswater.org?id=-280314CITANCHOR>.
David de Haas# Joe Lane# Paul Lant. Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 3, 2025. https://www.accesswater.org/?id=-280314CITANCHOR.
David de Haas# Joe Lane# Paul Lant
Life Cycle Assessment Of An Urban Water System On the East Coast Of Australia
Access Water
Water Environment Federation
December 22, 2018
October 3, 2025
https://www.accesswater.org/?id=-280314CITANCHOR