lastID = -281333
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: W13-Proceedings
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2020-03-31 01:42:38 Adam Phillips
  • 2020-03-31 01:42:37 Adam Phillips
  • 2020-02-01 00:37:42 Administrator
  • 2020-02-01 00:37:41 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: W13-Proceedings
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation

Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation

Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: W13-Proceedings
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation
Abstract
The Milwaukee Metropolitan Sewerage District (MMSD) is one of the leading wastewater agencies addressing sustainability. One opportunity for renewable energy production which MMSD has undertaken is a project to utilize landfill gas from a private landfill to the 100 mgd (average flow) Jones Island Water Reclamation Facility (JIWRF) in order to produce electricity and heat.In order to help the MMSD coordinate and manage startup of the project, Brown and Caldwell was retained to provide assistance in several areas. This paper will describe the landfill gas system; discuss the Coordination and Management Services effort; and how the challenges of coordination with multiple engineers, owners, contractors, and operators were addressed.
The Milwaukee Metropolitan Sewerage District (MMSD) is one of the leading wastewater agencies addressing sustainability. One opportunity for renewable energy production which MMSD has undertaken is a project to utilize landfill gas from a private landfill to the 100 mgd (average flow) Jones Island Water Reclamation Facility (JIWRF) in order to produce electricity and heat.
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2013
ISSN1938-6478
DOI10.2175/193864713813692199
Volume / Issue2013 / 11
Content sourceWEFTEC
Copyright2013
Word count131

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: W13-Proceedings
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation
Pricing
Non-member price: $11.50
Member price:
-281333
Get access
-281333
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: W13-Proceedings
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation
Abstract
The Milwaukee Metropolitan Sewerage District (MMSD) is one of the leading wastewater agencies addressing sustainability. One opportunity for renewable energy production which MMSD has undertaken is a project to utilize landfill gas from a private landfill to the 100 mgd (average flow) Jones Island Water Reclamation Facility (JIWRF) in order to produce electricity and heat.In order to help the MMSD coordinate and manage startup of the project, Brown and Caldwell was retained to provide assistance in several areas. This paper will describe the landfill gas system; discuss the Coordination and Management Services effort; and how the challenges of coordination with multiple engineers, owners, contractors, and operators were addressed.
The Milwaukee Metropolitan Sewerage District (MMSD) is one of the leading wastewater agencies addressing sustainability. One opportunity for renewable energy production which MMSD has undertaken is a project to utilize landfill gas from a private landfill to the 100 mgd (average flow) Jones Island Water Reclamation Facility (JIWRF) in order to produce electricity and heat.
SourceProceedings of the Water Environment Federation
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Oct, 2013
ISSN1938-6478
DOI10.2175/193864713813692199
Volume / Issue2013 / 11
Content sourceWEFTEC
Copyright2013
Word count131

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-281333CITANCHOR>.
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-281333CITANCHOR.
Integrating Major Components of a New Landfill Gas System – Coordination of Multiple Contracts for Gas Treatment, Pipeline Transmission and Turbine Energy Generation
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-281333CITANCHOR