lastID = -287020
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:27:00 Adam Phillips
  • 2022-05-06 11:26:59 Adam Phillips
  • 2020-01-31 23:20:58 Administrator
  • 2020-01-31 23:20:57 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE

FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE

FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE
Abstract
Homes and businesses in the North 35th Street area of the Milwaukee Metropolitan Interceptor Sewer (MIS) system have experienced recurring basement flooding during major rainfalls. Although a system of deep tunnels provides in-line storage of peak flows, the storage capacity is sometimes not enough. On July 21, 1999, a heavy rainfall caused severe basement flooding in the 35th Street service area. As a result, the Milwaukee Metropolitan Sewerage District (MMSD) authorized an extreme event hydraulic analysis to evaluate the system capacity and recommend corrective action. The recommended alternative included increasing the capacity of an existing combined sewer overflow (CSO) pump station at 32nd and Hampton from 54 MGD to 125 MGD. The MMSD authorized an emergency project to design and construct a new CSO pump station at 32nd and Hampton on August 12, 1999. The MMSD mandated that the new pump station be operational by May 1, 2000.Because of the short time frame scheduled for design and construction, a fast-track approach was implemented. Major items of equipment such as pumps, generator, electrical switchgear, and sluice gates were procured by the MMSD separately from the construction contract. The MMSD solicited bids from two contractors, and the final selection was made not only on the basis of price, but also on overall construction approach, experience, and ability to meet the scheduled dates of completion and initiation of operation. Construction started while the detailed design was still in progress. The pump station itself is located in the parking lot of an existing MMSD maintenance building.This paper will present a discussion of the use of large submersible pumps for CSO service. Design considerations, procurement methods, and the challenges of fast-track design and construction are described.
Homes and businesses in the North 35th Street area of the Milwaukee Metropolitan Interceptor Sewer (MIS) system have experienced recurring basement flooding during major rainfalls. Although a system of deep tunnels provides in-line storage of peak flows, the storage capacity is sometimes not enough. On July 21, 1999, a heavy rainfall caused severe basement flooding in the 35th Street service area....
Author(s)
Roger MaurerAlan Bush
SourceProceedings of the Water Environment Federation
SubjectSession 26 - Collection Systems Symposium: CSO Issues
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:12L.535;1-
DOI10.2175/193864700784608559
Volume / Issue2000 / 12
Content sourceWEFTEC
First / last page(s)535 - 544
Copyright2000
Word count295

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE
Pricing
Non-member price: $11.50
Member price:
-287020
Get access
-287020
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE
Abstract
Homes and businesses in the North 35th Street area of the Milwaukee Metropolitan Interceptor Sewer (MIS) system have experienced recurring basement flooding during major rainfalls. Although a system of deep tunnels provides in-line storage of peak flows, the storage capacity is sometimes not enough. On July 21, 1999, a heavy rainfall caused severe basement flooding in the 35th Street service area. As a result, the Milwaukee Metropolitan Sewerage District (MMSD) authorized an extreme event hydraulic analysis to evaluate the system capacity and recommend corrective action. The recommended alternative included increasing the capacity of an existing combined sewer overflow (CSO) pump station at 32nd and Hampton from 54 MGD to 125 MGD. The MMSD authorized an emergency project to design and construct a new CSO pump station at 32nd and Hampton on August 12, 1999. The MMSD mandated that the new pump station be operational by May 1, 2000.Because of the short time frame scheduled for design and construction, a fast-track approach was implemented. Major items of equipment such as pumps, generator, electrical switchgear, and sluice gates were procured by the MMSD separately from the construction contract. The MMSD solicited bids from two contractors, and the final selection was made not only on the basis of price, but also on overall construction approach, experience, and ability to meet the scheduled dates of completion and initiation of operation. Construction started while the detailed design was still in progress. The pump station itself is located in the parking lot of an existing MMSD maintenance building.This paper will present a discussion of the use of large submersible pumps for CSO service. Design considerations, procurement methods, and the challenges of fast-track design and construction are described.
Homes and businesses in the North 35th Street area of the Milwaukee Metropolitan Interceptor Sewer (MIS) system have experienced recurring basement flooding during major rainfalls. Although a system of deep tunnels provides in-line storage of peak flows, the storage capacity is sometimes not enough. On July 21, 1999, a heavy rainfall caused severe basement flooding in the 35th Street service area....
Author(s)
Roger MaurerAlan Bush
SourceProceedings of the Water Environment Federation
SubjectSession 26 - Collection Systems Symposium: CSO Issues
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2000
ISSN1938-6478
SICI1938-6478(20000101)2000:12L.535;1-
DOI10.2175/193864700784608559
Volume / Issue2000 / 12
Content sourceWEFTEC
First / last page(s)535 - 544
Copyright2000
Word count295

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Roger Maurer# Alan Bush. FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 1 Jul. 2025. <https://www.accesswater.org?id=-287020CITANCHOR>.
Roger Maurer# Alan Bush. FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 1, 2025. https://www.accesswater.org/?id=-287020CITANCHOR.
Roger Maurer# Alan Bush
FROM PARKING LOT TO PUMP STATION USE OF LARGE SUBMERSIBLE PUMPS FOR CSO SERVICE
Access Water
Water Environment Federation
December 22, 2018
July 1, 2025
https://www.accesswater.org/?id=-287020CITANCHOR