lastID = -287990
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:32:40 Adam Phillips
  • 2022-05-06 11:32:39 Adam Phillips
  • 2020-02-01 02:04:05 Administrator
  • 2020-02-01 02:04:04 Administrator
  • 2020-02-01 02:04:03 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR

NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR

NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR
Abstract
The Wood Street Interceptor project involved the rehabilitation of 3,000 feet of 105-inch diameter reinforced concrete sewer pipeline that was 50 years old and gradually deteriorating due to hydrogen sulfide corrosion. East Bay Municipal Utility District (District) has completed two rehabilitation projects in the Wood Street Interceptor using the Danby and Linabond processes to install corrosion resistant PVC liners. By installing corrosion resistant liners, the useful life of the pipeline has been extended by another 50 to 100 years.The Danby rehabilitation method involves installing PVC forms over the pipe interior surface and placing cementitous grout behind the forms in several lifts over several days.The Linabond rehabilitation method involves spraying of a high strength thermosetting resin to the surface of the concrete pipe. The resin expands in an exothermic reaction to form a section of rigid cellular plastic which firmly bonds with the concrete. A thin flexible PVC liner was then placed over the resin.The construction effort was remarkable for its efficiency and high level of coordination under hazardous confined space conditions. Because the interceptor remained active, work had to be performed during a 6-hour window at night when flows were at their lowest. Rigorous safety measures were required to ensure the safety of personnel in the pipeline. Close coordination was required with operations staff at the downstream treatment plant influent pump station to ensure that interceptor levels were maintained low enough for work to occur. As a result of the excellent coordination effort, the project was completed with an excellent safety record, no lost construction days and no community complaints and zero change order.
The Wood Street Interceptor project involved the rehabilitation of 3,000 feet of 105-inch diameter reinforced concrete sewer pipeline that was 50 years old and gradually deteriorating due to hydrogen sulfide corrosion. East Bay Municipal Utility District (District) has completed two rehabilitation projects in the Wood Street Interceptor using the Danby and Linabond processes to install corrosion...
Author(s)
Elsabeth GirmaPete BellowsOlujimi Yoloye
SourceProceedings of the Water Environment Federation
SubjectSession 48 - Collection Systems Symposium: Trenchless Technology
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:12L.474;1-
DOI10.2175/193864701790864999
Volume / Issue2001 / 12
Content sourceWEFTEC
First / last page(s)474 - 487
Copyright2001
Word count274

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR
Pricing
Non-member price: $11.50
Member price:
-287990
Get access
-287990
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR
Abstract
The Wood Street Interceptor project involved the rehabilitation of 3,000 feet of 105-inch diameter reinforced concrete sewer pipeline that was 50 years old and gradually deteriorating due to hydrogen sulfide corrosion. East Bay Municipal Utility District (District) has completed two rehabilitation projects in the Wood Street Interceptor using the Danby and Linabond processes to install corrosion resistant PVC liners. By installing corrosion resistant liners, the useful life of the pipeline has been extended by another 50 to 100 years.The Danby rehabilitation method involves installing PVC forms over the pipe interior surface and placing cementitous grout behind the forms in several lifts over several days.The Linabond rehabilitation method involves spraying of a high strength thermosetting resin to the surface of the concrete pipe. The resin expands in an exothermic reaction to form a section of rigid cellular plastic which firmly bonds with the concrete. A thin flexible PVC liner was then placed over the resin.The construction effort was remarkable for its efficiency and high level of coordination under hazardous confined space conditions. Because the interceptor remained active, work had to be performed during a 6-hour window at night when flows were at their lowest. Rigorous safety measures were required to ensure the safety of personnel in the pipeline. Close coordination was required with operations staff at the downstream treatment plant influent pump station to ensure that interceptor levels were maintained low enough for work to occur. As a result of the excellent coordination effort, the project was completed with an excellent safety record, no lost construction days and no community complaints and zero change order.
The Wood Street Interceptor project involved the rehabilitation of 3,000 feet of 105-inch diameter reinforced concrete sewer pipeline that was 50 years old and gradually deteriorating due to hydrogen sulfide corrosion. East Bay Municipal Utility District (District) has completed two rehabilitation projects in the Wood Street Interceptor using the Danby and Linabond processes to install corrosion...
Author(s)
Elsabeth GirmaPete BellowsOlujimi Yoloye
SourceProceedings of the Water Environment Federation
SubjectSession 48 - Collection Systems Symposium: Trenchless Technology
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:12L.474;1-
DOI10.2175/193864701790864999
Volume / Issue2001 / 12
Content sourceWEFTEC
First / last page(s)474 - 487
Copyright2001
Word count274

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Elsabeth Girma# Pete Bellows# Olujimi Yoloye. NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 29 Jun. 2025. <https://www.accesswater.org?id=-287990CITANCHOR>.
Elsabeth Girma# Pete Bellows# Olujimi Yoloye. NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 29, 2025. https://www.accesswater.org/?id=-287990CITANCHOR.
Elsabeth Girma# Pete Bellows# Olujimi Yoloye
NOT YOUR AVERAGE WALLPAPER – REHABILITATION OF THE WOOD STREET INTERCEPTOR
Access Water
Water Environment Federation
December 22, 2018
June 29, 2025
https://www.accesswater.org/?id=-287990CITANCHOR