lastID = -288168
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 14:37:18 Adam Phillips
  • 2022-05-06 14:37:17 Adam Phillips
  • 2020-02-01 06:22:15 Administrator
  • 2020-02-01 06:22:14 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops

Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops

Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops
Abstract
The Morris Forman Wastewater Treatment Plant (MFWTP) is the largest wastewater plant in the Louisville & Jefferson County Metropolitan Sewer District (MSD) system. The original plant, a primary treatment facility, was constructed in the 1950s and the secondary system was added in the 1970s. Recent improvements have included the addition of bio-roughing towers, conversion to a sodium hypochlorite disinfection system, and installation of a dechlorination system.In 1996, the MSD entered into a capital improvement program to replace aging facilities at the MFWTP and several of the projects had the potential of reducing treatment capacity during construction. Most notably, replacement of the aeration equipment in the high purity oxygen (HPO) reactors reduced the secondary treatment capacity of the plant by 40% for over a year. In order to minimize the impact to the receiving stream, the Ohio River, a plan of operations was developed and presented to the Kentucky Division of Water (KDOW). The plan predicted the impact of construction outages on effluent quality and recommended short term improvements that could be implemented, reducing the impact of construction. In order to quantify the impacts, a treatment process model, PRO2D, was used to develop an overall plant mass balance and predict the performance of all unit processes and plant effluent based on the influent characteristics, tank sizes, and equipment sizes.Several approaches were used to minimize construction impacts. Since replacement of the aeration equipment in the HPO reactors would have the greatest impact on treatment capacity, particular attention was paid to construction sequencing. The initial construction could begin with only 20% of the secondary treatment system taken out of service. Operating the plant with reduced disruption allowed the contractor to develop a “learning curve” for performance of the work and also allowed the MSD to calibrate the PRO2D model for the plant and develop a comfort level for using the model as an operational tool.The model was useful for developing process control criteria and was also able to predict conditions where we expected non-compliance with established effluent limits. When it was predicted that effluent limits could not be met under existing conditions, that the Kentucky DOW was notified and additional temporary treatment technologies were employed to minimize the excursions.
The Morris Forman Wastewater Treatment Plant (MFWTP) is the largest wastewater plant in the Louisville & Jefferson County Metropolitan Sewer District (MSD) system. The original plant, a primary treatment facility, was constructed in the 1950s and the secondary system was added in the 1970s. Recent improvements have included the addition of bio-roughing towers, conversion to a sodium...
Author(s)
David CartySaeed AssefDon SzymanskyDan SammonsAlex Novak
SourceProceedings of the Water Environment Federation
SubjectSession 15 - Plant Operations I: Plant Operations and Maintenance: Clarification and Plant Models
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:15L.408;1-
DOI10.2175/193864701790902969
Volume / Issue2001 / 15
Content sourceWEFTEC
First / last page(s)408 - 414
Copyright2001
Word count387

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops
Pricing
Non-member price: $11.50
Member price:
-288168
Get access
-288168
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops
Abstract
The Morris Forman Wastewater Treatment Plant (MFWTP) is the largest wastewater plant in the Louisville & Jefferson County Metropolitan Sewer District (MSD) system. The original plant, a primary treatment facility, was constructed in the 1950s and the secondary system was added in the 1970s. Recent improvements have included the addition of bio-roughing towers, conversion to a sodium hypochlorite disinfection system, and installation of a dechlorination system.In 1996, the MSD entered into a capital improvement program to replace aging facilities at the MFWTP and several of the projects had the potential of reducing treatment capacity during construction. Most notably, replacement of the aeration equipment in the high purity oxygen (HPO) reactors reduced the secondary treatment capacity of the plant by 40% for over a year. In order to minimize the impact to the receiving stream, the Ohio River, a plan of operations was developed and presented to the Kentucky Division of Water (KDOW). The plan predicted the impact of construction outages on effluent quality and recommended short term improvements that could be implemented, reducing the impact of construction. In order to quantify the impacts, a treatment process model, PRO2D, was used to develop an overall plant mass balance and predict the performance of all unit processes and plant effluent based on the influent characteristics, tank sizes, and equipment sizes.Several approaches were used to minimize construction impacts. Since replacement of the aeration equipment in the HPO reactors would have the greatest impact on treatment capacity, particular attention was paid to construction sequencing. The initial construction could begin with only 20% of the secondary treatment system taken out of service. Operating the plant with reduced disruption allowed the contractor to develop a “learning curve” for performance of the work and also allowed the MSD to calibrate the PRO2D model for the plant and develop a comfort level for using the model as an operational tool.The model was useful for developing process control criteria and was also able to predict conditions where we expected non-compliance with established effluent limits. When it was predicted that effluent limits could not be met under existing conditions, that the Kentucky DOW was notified and additional temporary treatment technologies were employed to minimize the excursions.
The Morris Forman Wastewater Treatment Plant (MFWTP) is the largest wastewater plant in the Louisville & Jefferson County Metropolitan Sewer District (MSD) system. The original plant, a primary treatment facility, was constructed in the 1950s and the secondary system was added in the 1970s. Recent improvements have included the addition of bio-roughing towers, conversion to a sodium...
Author(s)
David CartySaeed AssefDon SzymanskyDan SammonsAlex Novak
SourceProceedings of the Water Environment Federation
SubjectSession 15 - Plant Operations I: Plant Operations and Maintenance: Clarification and Plant Models
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:15L.408;1-
DOI10.2175/193864701790902969
Volume / Issue2001 / 15
Content sourceWEFTEC
First / last page(s)408 - 414
Copyright2001
Word count387

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
David Carty# Saeed Assef# Don Szymansky# Dan Sammons# Alex Novak. Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Oct. 2025. <https://www.accesswater.org?id=-288168CITANCHOR>.
David Carty# Saeed Assef# Don Szymansky# Dan Sammons# Alex Novak. Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed October 6, 2025. https://www.accesswater.org/?id=-288168CITANCHOR.
David Carty# Saeed Assef# Don Szymansky# Dan Sammons# Alex Novak
Using Predictive Modeling Tools and Temporary Treatment Methods to Meet Effluent Limits During Construction Outages: Pulling Out all of the Stops
Access Water
Water Environment Federation
December 22, 2018
October 6, 2025
https://www.accesswater.org/?id=-288168CITANCHOR