lastID = -288244
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:37:43 Adam Phillips
  • 2020-01-31 20:57:19 Administrator
  • 2020-01-31 20:57:18 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY

CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY

CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY
Abstract
This paper presents an overview of Atlanta's Wastewater Systems Improvement Program. Atlanta is a premier city in the Southeast U.S. with a quality of life second to none. It is no surprise that Atlanta is growing rapidly and must improve its wastewater system to maintain a high level of service to sustain its people and economy.There are three specific regulatory requirements driving this program: Senate Bill 500 enforcing phosphorus level compliance at Water Reclamation Centers (WRCs) and Combined Sewer Overflow (CSO) control facilities by December 2000; CSO Consent Degree requiring completion of the long-term plan by 2007; and a second Consent Decree requiring WRCs, pumping stations and sewer improvements by 2014.The City has met the SB 500 requirements by spending over 600 million for its four WRCs, pumping stations, and sewer improvement projects to-date. The City's preferred option for CSO plan includes consolidated storage/conveyance tunnels, two CSO treatment facilities, and sewer separation in selected areas costing about 1 billion. The City plans to complete the construction of the CSO program by 2007.The total capital cost of the program is estimated between 2.5 and 3 billion and will take 14 years to complete. The issue of its affordability and impact on its ratepayers is a challenge that the City would like to minimize by innovative cost reduction methods and availability of low interest loans and grant funds.
This paper presents an overview of Atlanta's Wastewater Systems Improvement Program. Atlanta is a premier city in the Southeast U.S. with a quality of life second to none. It is no surprise that Atlanta is growing rapidly and must improve its wastewater system to maintain a high level of service to sustain its people and economy.There are three specific regulatory requirements driving this...
Author(s)
Art HamidLarry WallaceDean Bell
SourceProceedings of the Water Environment Federation
SubjectSession 7 - Collection Systems Symposium: Wet Weather Issues I
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:16L.579;1-
DOI10.2175/193864701790902211
Volume / Issue2001 / 16
Content sourceWEFTEC
First / last page(s)579 - 593
Copyright2001
Word count243

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY
Pricing
Non-member price: $11.50
Member price:
-288244
Get access
-288244
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY
Abstract
This paper presents an overview of Atlanta's Wastewater Systems Improvement Program. Atlanta is a premier city in the Southeast U.S. with a quality of life second to none. It is no surprise that Atlanta is growing rapidly and must improve its wastewater system to maintain a high level of service to sustain its people and economy.There are three specific regulatory requirements driving this program: Senate Bill 500 enforcing phosphorus level compliance at Water Reclamation Centers (WRCs) and Combined Sewer Overflow (CSO) control facilities by December 2000; CSO Consent Degree requiring completion of the long-term plan by 2007; and a second Consent Decree requiring WRCs, pumping stations and sewer improvements by 2014.The City has met the SB 500 requirements by spending over 600 million for its four WRCs, pumping stations, and sewer improvement projects to-date. The City's preferred option for CSO plan includes consolidated storage/conveyance tunnels, two CSO treatment facilities, and sewer separation in selected areas costing about 1 billion. The City plans to complete the construction of the CSO program by 2007.The total capital cost of the program is estimated between 2.5 and 3 billion and will take 14 years to complete. The issue of its affordability and impact on its ratepayers is a challenge that the City would like to minimize by innovative cost reduction methods and availability of low interest loans and grant funds.
This paper presents an overview of Atlanta's Wastewater Systems Improvement Program. Atlanta is a premier city in the Southeast U.S. with a quality of life second to none. It is no surprise that Atlanta is growing rapidly and must improve its wastewater system to maintain a high level of service to sustain its people and economy.There are three specific regulatory requirements driving this...
Author(s)
Art HamidLarry WallaceDean Bell
SourceProceedings of the Water Environment Federation
SubjectSession 7 - Collection Systems Symposium: Wet Weather Issues I
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2001
ISSN1938-6478
SICI1938-6478(20010101)2001:16L.579;1-
DOI10.2175/193864701790902211
Volume / Issue2001 / 16
Content sourceWEFTEC
First / last page(s)579 - 593
Copyright2001
Word count243

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Art Hamid# Larry Wallace# Dean Bell. CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-288244CITANCHOR>.
Art Hamid# Larry Wallace# Dean Bell. CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-288244CITANCHOR.
Art Hamid# Larry Wallace# Dean Bell
CITY OF ATLANTA COMBINED AND SEPARATE SEWER OVERFLOW CONTROL PROGRAM MEETS THE CHALLENGE OF THE 21ST CENTURY
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-288244CITANCHOR