lastID = -289023
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:28:28 Adam Phillips
  • 2020-01-31 19:33:45 Administrator
  • 2020-01-31 19:33:44 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM

AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM

AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM
Abstract
The Stony Brook Illegal Connection Investigation is an integral part of the Boston Water and Sewer Commission's program to reduce sewage discharges to Boston's storm drainage system, the Charles River, and ultimately Boston Harbor. The project incorporates innovative techniques to identify wastewater in the storm drain system, which is tributary to the Stony Brook Conduit. The Stony Brook Conduit discharges to the Charles River from a drainage area of approximately 8,400 acres. The study area for this project encompasses approximately 6,000 acres served by separate sanitary sewer and storm drain systems; the remaining 2,400 acres are served by combined sewers.The project to remove illegal connections from the Stony Brook Conduit began in 1999 with a pilot study. Two of the sub-areas, representing about 8 percent of the overall study area, were selected to test the methodology developed by the Commission to locate and remove illegal connections. During the pilot project, all manholes were inspected during dry weather conditions, starting at the upstream end of each drainage path. Visual observation and field tests of water quality parameters (pH, conductivity, temperature, ammonia, and surfactants) were used to identify contamination. Where evidence of contamination was not found during inspections, sandbags were placed during dry weather for 48-hours to confirm the absence of contamination. After contaminated reaches were identified, dye tests were performed to identify the sources. The pilot study investigation identified 31 illegal connections, all but three of which were corrected within an average of 40 days from notification. The three remaining connections were complex situations requiring additional assessment and special repair techniques. Repair of the 28 illegal connections resulted in the elimination of more than an estimated 7,000-gpd of untreated wastewater discharge to the Stony Brook Conduit.Following the pilot project, the methodology was refined, significantly reducing the number of total drain manholes inspected and increasing the use of sandbags to focus investigations and reduce the number of dye tests. Over 1,430 manholes have been inspected as of April 19, 2002, with contamination identified at 450. Investigations were isolated to about 250 reaches of storm drain, prompting dye testing at more than 2,125 buildings. 278 illegal connections have been identified, and 159 have been repaired. Nine of the remaining illegal connections could not be repaired by conventional excavation and redirection. Special designs are underway for repair at these locations. Fieldwork is scheduled to be substantially complete by December 2002.
The Stony Brook Illegal Connection Investigation is an integral part of the Boston Water and Sewer Commission's program to reduce sewage discharges to Boston's storm drainage system, the Charles River, and ultimately Boston Harbor. The project incorporates innovative techniques to identify wastewater in the storm drain system, which is tributary to the Stony Brook Conduit. The Stony Brook Conduit...
Author(s)
Joseph M. BoccadoroPeter SilbermannVirginia ChadbourneCharlie Jewell
SourceProceedings of the Water Environment Federation
SubjectSession 29 - Collection Systems Symposium: Using Today's Tools to Effectively Maintain Your Sewers
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:15L.795;1-
DOI10.2175/193864702784247792
Volume / Issue2002 / 15
Content sourceWEFTEC
First / last page(s)795 - 800
Copyright2002
Word count410

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM
Pricing
Non-member price: $11.50
Member price:
-289023
Get access
-289023
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM
Abstract
The Stony Brook Illegal Connection Investigation is an integral part of the Boston Water and Sewer Commission's program to reduce sewage discharges to Boston's storm drainage system, the Charles River, and ultimately Boston Harbor. The project incorporates innovative techniques to identify wastewater in the storm drain system, which is tributary to the Stony Brook Conduit. The Stony Brook Conduit discharges to the Charles River from a drainage area of approximately 8,400 acres. The study area for this project encompasses approximately 6,000 acres served by separate sanitary sewer and storm drain systems; the remaining 2,400 acres are served by combined sewers.The project to remove illegal connections from the Stony Brook Conduit began in 1999 with a pilot study. Two of the sub-areas, representing about 8 percent of the overall study area, were selected to test the methodology developed by the Commission to locate and remove illegal connections. During the pilot project, all manholes were inspected during dry weather conditions, starting at the upstream end of each drainage path. Visual observation and field tests of water quality parameters (pH, conductivity, temperature, ammonia, and surfactants) were used to identify contamination. Where evidence of contamination was not found during inspections, sandbags were placed during dry weather for 48-hours to confirm the absence of contamination. After contaminated reaches were identified, dye tests were performed to identify the sources. The pilot study investigation identified 31 illegal connections, all but three of which were corrected within an average of 40 days from notification. The three remaining connections were complex situations requiring additional assessment and special repair techniques. Repair of the 28 illegal connections resulted in the elimination of more than an estimated 7,000-gpd of untreated wastewater discharge to the Stony Brook Conduit.Following the pilot project, the methodology was refined, significantly reducing the number of total drain manholes inspected and increasing the use of sandbags to focus investigations and reduce the number of dye tests. Over 1,430 manholes have been inspected as of April 19, 2002, with contamination identified at 450. Investigations were isolated to about 250 reaches of storm drain, prompting dye testing at more than 2,125 buildings. 278 illegal connections have been identified, and 159 have been repaired. Nine of the remaining illegal connections could not be repaired by conventional excavation and redirection. Special designs are underway for repair at these locations. Fieldwork is scheduled to be substantially complete by December 2002.
The Stony Brook Illegal Connection Investigation is an integral part of the Boston Water and Sewer Commission's program to reduce sewage discharges to Boston's storm drainage system, the Charles River, and ultimately Boston Harbor. The project incorporates innovative techniques to identify wastewater in the storm drain system, which is tributary to the Stony Brook Conduit. The Stony Brook Conduit...
Author(s)
Joseph M. BoccadoroPeter SilbermannVirginia ChadbourneCharlie Jewell
SourceProceedings of the Water Environment Federation
SubjectSession 29 - Collection Systems Symposium: Using Today's Tools to Effectively Maintain Your Sewers
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:15L.795;1-
DOI10.2175/193864702784247792
Volume / Issue2002 / 15
Content sourceWEFTEC
First / last page(s)795 - 800
Copyright2002
Word count410

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Joseph M. Boccadoro# Peter Silbermann# Virginia Chadbourne# Charlie Jewell. AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 1 Jul. 2025. <https://www.accesswater.org?id=-289023CITANCHOR>.
Joseph M. Boccadoro# Peter Silbermann# Virginia Chadbourne# Charlie Jewell. AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed July 1, 2025. https://www.accesswater.org/?id=-289023CITANCHOR.
Joseph M. Boccadoro# Peter Silbermann# Virginia Chadbourne# Charlie Jewell
AN UPDATE ON BOSTON'S PROJECT TO REMOVE SEWAGE FROM THE STORM DRAINAGE SYSTEM
Access Water
Water Environment Federation
December 22, 2018
July 1, 2025
https://www.accesswater.org/?id=-289023CITANCHOR