lastID = -289595
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 20:28:23 Adam Phillips
  • 2022-05-06 20:28:22 Adam Phillips
  • 2020-03-27 02:14:36 Adam Phillips
  • 2020-03-27 02:14:35 Adam Phillips
  • 2020-02-01 06:20:49 Administrator
  • 2020-02-01 06:20:48 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL

USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL

USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL
Abstract
Combined Sewer Overflow (CSO) Treatment through fine screening coupled with Engineered Procure Construct (EPC) construction delivery method have proven to be an economical solution for the City of Lima, Ohio, to obtain compliance with Federal EPA regulations on CSO control, and allows for new development upstream of the combined system.Accumulation of floatable materials along riverbanks is a very visible type of river pollution. The fine screening of combined sewer overflows (CSOs) was beneficial to Lima and downstream communities by removing the objectionable materials that currently discharge from Lima's CSOs. These CSOs discharge near the vicinity of the City's river walk. The screens capture fine solids and floatable materials in the combined sewage that are greater than 4- millimeters (0.15-inch) (such as Styrofoam cups, cigarette butts, etc.) during a storm discharge event and hold these solids within the sewerage system for diversion and treatment at the wastewater treatment plant. Other US cities that have reduced pollution in their waterways have experienced energized development. The City of Lima's expectation is that their investment in pollution reduction will result in increased economic development, improved recreational areas, and community pride.The type of CSO screens utilized in this project is relatively new to the United States market. Fine screening equipment has 4-millimeter (0.15-inch) openings to not only trap floatables but also provide CSO treatment. For Lima's CSO solution, horizontal fine screens were retrofitted into five existing 20-year-old chambers to provide an innovative and economical solution.The screen does not screen solids in the traditional sense by removing the collected waste, but rather acts as a barrier to solids, retaining solids on the dirty water side of the screen and diverting them to the main wastewater treatment plant for removal once the storm flow subsides.Excessive flow entering the screening chamber will pass through the horizontal screen and discharge over a new fixed spill weir and discharge into the Ottawa River through the existing river gates. Floatable materials are trapped by the screen move laterally along the face of the screen via a series of mechanical combs to the transverse end section where they can be directed to the sanitary sewer line for ultimate removal at the wastewater treatment plant.As a direct result of the consultant work undertaken by MWH and the City of Lima in reviewing the Short and Long Terms goals for the CSOs and combined sewerage system, the City of Lima selected a Design Build Construction procurement method to execute the project. Appointing MWH as the Design Build Contractor, the City of Lima used a reimbursable form of contract with a Target Cost providing for a sharing of cost overruns or cost savings relative to the Target Cost between the City and MWH. The City of Lima's experience with the Engineer-Procure-Construct (EPC) method was favorable, with prompt delivery of the project resulting in a 30 percent schedule reduction and 10 percent cost savings.More than 90 percent of the entire CSO volume receives treatment for a storm event with a recurrence interval of four months. The CSO screens will assure that the City of Lima can continue to provide sewer services for new developments located upstream of the Combined Sewer Overflow locations.
Combined Sewer Overflow (CSO) Treatment through fine screening coupled with Engineered Procure Construct (EPC) construction delivery method have proven to be an economical solution for the City of Lima, Ohio, to obtain compliance with Federal EPA regulations on CSO control, and allows for new development upstream of the combined system.Accumulation of floatable materials along riverbanks is a very...
Author(s)
Thomas A. UngarDavid Schnipke
SourceProceedings of the Water Environment Federation
SubjectSession 8 – Modeling and Design Considerations
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:6L.334;1-
DOI10.2175/193864702785301024
Volume / Issue2002 / 6
Content sourceUtility Management Conference
First / last page(s)334 - 341
Copyright2002
Word count533

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL
Pricing
Non-member price: $11.50
Member price:
-289595
Get access
-289595
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL
Abstract
Combined Sewer Overflow (CSO) Treatment through fine screening coupled with Engineered Procure Construct (EPC) construction delivery method have proven to be an economical solution for the City of Lima, Ohio, to obtain compliance with Federal EPA regulations on CSO control, and allows for new development upstream of the combined system.Accumulation of floatable materials along riverbanks is a very visible type of river pollution. The fine screening of combined sewer overflows (CSOs) was beneficial to Lima and downstream communities by removing the objectionable materials that currently discharge from Lima's CSOs. These CSOs discharge near the vicinity of the City's river walk. The screens capture fine solids and floatable materials in the combined sewage that are greater than 4- millimeters (0.15-inch) (such as Styrofoam cups, cigarette butts, etc.) during a storm discharge event and hold these solids within the sewerage system for diversion and treatment at the wastewater treatment plant. Other US cities that have reduced pollution in their waterways have experienced energized development. The City of Lima's expectation is that their investment in pollution reduction will result in increased economic development, improved recreational areas, and community pride.The type of CSO screens utilized in this project is relatively new to the United States market. Fine screening equipment has 4-millimeter (0.15-inch) openings to not only trap floatables but also provide CSO treatment. For Lima's CSO solution, horizontal fine screens were retrofitted into five existing 20-year-old chambers to provide an innovative and economical solution.The screen does not screen solids in the traditional sense by removing the collected waste, but rather acts as a barrier to solids, retaining solids on the dirty water side of the screen and diverting them to the main wastewater treatment plant for removal once the storm flow subsides.Excessive flow entering the screening chamber will pass through the horizontal screen and discharge over a new fixed spill weir and discharge into the Ottawa River through the existing river gates. Floatable materials are trapped by the screen move laterally along the face of the screen via a series of mechanical combs to the transverse end section where they can be directed to the sanitary sewer line for ultimate removal at the wastewater treatment plant.As a direct result of the consultant work undertaken by MWH and the City of Lima in reviewing the Short and Long Terms goals for the CSOs and combined sewerage system, the City of Lima selected a Design Build Construction procurement method to execute the project. Appointing MWH as the Design Build Contractor, the City of Lima used a reimbursable form of contract with a Target Cost providing for a sharing of cost overruns or cost savings relative to the Target Cost between the City and MWH. The City of Lima's experience with the Engineer-Procure-Construct (EPC) method was favorable, with prompt delivery of the project resulting in a 30 percent schedule reduction and 10 percent cost savings.More than 90 percent of the entire CSO volume receives treatment for a storm event with a recurrence interval of four months. The CSO screens will assure that the City of Lima can continue to provide sewer services for new developments located upstream of the Combined Sewer Overflow locations.
Combined Sewer Overflow (CSO) Treatment through fine screening coupled with Engineered Procure Construct (EPC) construction delivery method have proven to be an economical solution for the City of Lima, Ohio, to obtain compliance with Federal EPA regulations on CSO control, and allows for new development upstream of the combined system.Accumulation of floatable materials along riverbanks is a very...
Author(s)
Thomas A. UngarDavid Schnipke
SourceProceedings of the Water Environment Federation
SubjectSession 8 – Modeling and Design Considerations
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2002
ISSN1938-6478
SICI1938-6478(20020101)2002:6L.334;1-
DOI10.2175/193864702785301024
Volume / Issue2002 / 6
Content sourceUtility Management Conference
First / last page(s)334 - 341
Copyright2002
Word count533

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Thomas A. Ungar# David Schnipke. USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-289595CITANCHOR>.
Thomas A. Ungar# David Schnipke. USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-289595CITANCHOR.
Thomas A. Ungar# David Schnipke
USING INNOVATIVE TECHNOLOGIES FOR CSO CONTROL
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-289595CITANCHOR