lastID = -289888
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:28:08 Adam Phillips
  • 2022-05-06 11:28:07 Adam Phillips
  • 2020-02-01 03:00:51 Administrator
  • 2020-02-01 03:00:50 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT

PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT

PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT
Abstract
On September 7, 2002 two sinkholes opened on a busy arterial street in Tucson, Arizona. As a result of the sinkholes a major Sanitary Sewer Overflow (SSO) occurred. Public concern generated by this event prompted an emergency rehabilitation design and construction project utilizing cured-in-place pipe (CIPP) technology. The project had two primary goals:Reduce the flows tributary to the potentially damaged interceptor as soon as possible in order to lower the stress on the pipe.Rehabilitate the remainder of the pipe at the earliest possible date.Unique features of the design and construction included:A two-week fast track design period.Installation of a 38 mgd pumped flow diversion along a river park for the entire project length (5.0 miles) to both relieve flow in the interceptor and to minimize disruption in the impacted neighborhoods by allowing CIPP construction with only minor local flows requiring diversion. The solicitation specification was prepared in just 24 hours and the major diversion was up and running only 42 days after notice-to-proceed.Cleaning two double barrel siphons and rehabilitating the associated inlet and outlet siphon structures, as well as rehabilitating all manholes along the 5 mile alignment.Completing a “fast-track” rehabilitation with substantial completion occurring 149 days after notice-to-proceed.At the time of the sinkholes, Pima County Wastewater Management Department (PCWMD) was preparing several projects focused on long-term preventive maintenance, including a 230-mile closed circuit television (CCTV) investigation of the major sewers within the conveyance system. Because of the public concern, special emphasis has been placed on the unlined reinforced concrete pipe identify those areas with the highest priority for rehabilitation.
On September 7, 2002 two sinkholes opened on a busy arterial street in Tucson, Arizona. As a result of the sinkholes a major Sanitary Sewer Overflow (SSO) occurred. Public concern generated by this event prompted an emergency rehabilitation design and construction project utilizing cured-in-place pipe (CIPP) technology. The project had two primary goals:
Author(s)
Michael A. FleuryRobert G. Decker
SourceProceedings of the Water Environment Federation
SubjectSession 28 Collection Systems: Mission Impossible: The Story of Collection Systems Operations
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:10L.707;1-
DOI10.2175/193864703784678801
Volume / Issue2003 / 10
Content sourceWEFTEC
First / last page(s)707 - 712
Copyright2003
Word count276

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT
Pricing
Non-member price: $11.50
Member price:
-289888
Get access
-289888
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT
Abstract
On September 7, 2002 two sinkholes opened on a busy arterial street in Tucson, Arizona. As a result of the sinkholes a major Sanitary Sewer Overflow (SSO) occurred. Public concern generated by this event prompted an emergency rehabilitation design and construction project utilizing cured-in-place pipe (CIPP) technology. The project had two primary goals:Reduce the flows tributary to the potentially damaged interceptor as soon as possible in order to lower the stress on the pipe.Rehabilitate the remainder of the pipe at the earliest possible date.Unique features of the design and construction included:A two-week fast track design period.Installation of a 38 mgd pumped flow diversion along a river park for the entire project length (5.0 miles) to both relieve flow in the interceptor and to minimize disruption in the impacted neighborhoods by allowing CIPP construction with only minor local flows requiring diversion. The solicitation specification was prepared in just 24 hours and the major diversion was up and running only 42 days after notice-to-proceed.Cleaning two double barrel siphons and rehabilitating the associated inlet and outlet siphon structures, as well as rehabilitating all manholes along the 5 mile alignment.Completing a “fast-track” rehabilitation with substantial completion occurring 149 days after notice-to-proceed.At the time of the sinkholes, Pima County Wastewater Management Department (PCWMD) was preparing several projects focused on long-term preventive maintenance, including a 230-mile closed circuit television (CCTV) investigation of the major sewers within the conveyance system. Because of the public concern, special emphasis has been placed on the unlined reinforced concrete pipe identify those areas with the highest priority for rehabilitation.
On September 7, 2002 two sinkholes opened on a busy arterial street in Tucson, Arizona. As a result of the sinkholes a major Sanitary Sewer Overflow (SSO) occurred. Public concern generated by this event prompted an emergency rehabilitation design and construction project utilizing cured-in-place pipe (CIPP) technology. The project had two primary goals:
Author(s)
Michael A. FleuryRobert G. Decker
SourceProceedings of the Water Environment Federation
SubjectSession 28 Collection Systems: Mission Impossible: The Story of Collection Systems Operations
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:10L.707;1-
DOI10.2175/193864703784678801
Volume / Issue2003 / 10
Content sourceWEFTEC
First / last page(s)707 - 712
Copyright2003
Word count276

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Michael A. Fleury# Robert G. Decker. PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-289888CITANCHOR>.
Michael A. Fleury# Robert G. Decker. PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-289888CITANCHOR.
Michael A. Fleury# Robert G. Decker
PIMA COUNTY WASTEWATER MANAGEMENT NORTHWEST OUTFALL INTERCEPTOR EMERGENCY REHABILITATION PROJECT
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-289888CITANCHOR