lastID = -290537
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 18:38:25 Adam Phillips
  • 2020-02-01 01:23:58 Administrator
  • 2020-02-01 01:23:57 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM

MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM

MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM
Abstract
The Groundwater Replenishment (GWR) System is an innovative approach to keeping Orange County's groundwater basin a reliable source for meeting the region's future potable water needs. A joint program of the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD), the GWR System is an ambitious, large-scale project that will construct an advanced recycled water treatment facility (AWTF) to treat secondary wastewater for reuse. The facility will replace the aging Water Factory 21 (WF21) which, when completed in 1976, was one of the first recycled water treatment plants in the world.Using microfiltration as pretreatment for reverse osmosis (RO) and ultraviolet radiation (UV), Phase 1 of the GWR System will produce 70 million gallons per day (mgd) of recycled water that will meet all drinking water standards. The treated water will be injected into the ground by OCWD through new and existing injection wells to supply the local seawater intrusion barrierand pumped 13 miles up the Santa Ana River to be percolated into spreading basins for groundwater recharge, improving the groundwater quality and reducing Southern California's dependence on imported water. The facility will produce enough water to supply the needs of over 200,000 families.While OCWD will construct and operate the GWR System, the project will have far reachingim pacts and benefits on OCSD as well as OCWD. OCSD is committed to good resource management and has partnered with OCWD over the years on numerous recycled water projects, including WF21 and more recently, the Green Acres Project (GAP). Participation of OCSD in the GWR System is defined in a new inter-agency operating agreement between OCSD and OCWD which, among other things, stipulates a 50/50 cost share of capital costs between the OCSD and OCWD. OCSD staff participates as active members in the GWR System design team and has helped shape favorable public perception for the project at a time when they were also gaining public input regarding the future of their ocean discharge waiver. Despite all of theadditional responsibilities, there are significant benefits to OCSD, including deference or elimination of an additional ocean outfall, and support for OCSD's long-standing commitment to water reclamation.Participation in the GWR System will also impact OCSD more than all of the previous joint water reclamation projects and will require significant changes at OCSD. These changes take the form of a renewed commitment to control of discharges into the collection system, revisions to their long-term strategic plan, construction of new facilities required to support the GWR System, the coordination of operational efforts, and revisions to their Integrated Emergency Response Plan.At a total project cost of approximately 454 million, the GWR System is one of the largest projects either agency has undertaken. Microfiltration and UV equipment have been preselected to allow timely completion of the final design of the Advanced Water Treatment Facility (AWTF). The project, which is to be operational in 2007, will have seven construction contracts and three equipment preselection contracts. Some of the facilities are already in construction, with the AWTF contract scheduled for bidding in late 2003.
The Groundwater Replenishment (GWR) System is an innovative approach to keeping Orange County's groundwater basin a reliable source for meeting the region's future potable water needs. A joint program of the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD), the GWR System is an ambitious, large-scale project that will construct an advanced recycled water...
Author(s)
R. Bruce ChalmersMehul PatelWendy SevenandtDon Cutler
SourceProceedings of the Water Environment Federation
SubjectSession 51 Water Reclamation and Reuse: Groundwater Recharge and Nutrient Removal
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:7L.28;1-
DOI10.2175/193864703784641162
Volume / Issue2003 / 7
Content sourceWEFTEC
First / last page(s)28 - 53
Copyright2003
Word count522

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM
Pricing
Non-member price: $11.50
Member price:
-290537
Get access
-290537
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM
Abstract
The Groundwater Replenishment (GWR) System is an innovative approach to keeping Orange County's groundwater basin a reliable source for meeting the region's future potable water needs. A joint program of the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD), the GWR System is an ambitious, large-scale project that will construct an advanced recycled water treatment facility (AWTF) to treat secondary wastewater for reuse. The facility will replace the aging Water Factory 21 (WF21) which, when completed in 1976, was one of the first recycled water treatment plants in the world.Using microfiltration as pretreatment for reverse osmosis (RO) and ultraviolet radiation (UV), Phase 1 of the GWR System will produce 70 million gallons per day (mgd) of recycled water that will meet all drinking water standards. The treated water will be injected into the ground by OCWD through new and existing injection wells to supply the local seawater intrusion barrierand pumped 13 miles up the Santa Ana River to be percolated into spreading basins for groundwater recharge, improving the groundwater quality and reducing Southern California's dependence on imported water. The facility will produce enough water to supply the needs of over 200,000 families.While OCWD will construct and operate the GWR System, the project will have far reachingim pacts and benefits on OCSD as well as OCWD. OCSD is committed to good resource management and has partnered with OCWD over the years on numerous recycled water projects, including WF21 and more recently, the Green Acres Project (GAP). Participation of OCSD in the GWR System is defined in a new inter-agency operating agreement between OCSD and OCWD which, among other things, stipulates a 50/50 cost share of capital costs between the OCSD and OCWD. OCSD staff participates as active members in the GWR System design team and has helped shape favorable public perception for the project at a time when they were also gaining public input regarding the future of their ocean discharge waiver. Despite all of theadditional responsibilities, there are significant benefits to OCSD, including deference or elimination of an additional ocean outfall, and support for OCSD's long-standing commitment to water reclamation.Participation in the GWR System will also impact OCSD more than all of the previous joint water reclamation projects and will require significant changes at OCSD. These changes take the form of a renewed commitment to control of discharges into the collection system, revisions to their long-term strategic plan, construction of new facilities required to support the GWR System, the coordination of operational efforts, and revisions to their Integrated Emergency Response Plan.At a total project cost of approximately 454 million, the GWR System is one of the largest projects either agency has undertaken. Microfiltration and UV equipment have been preselected to allow timely completion of the final design of the Advanced Water Treatment Facility (AWTF). The project, which is to be operational in 2007, will have seven construction contracts and three equipment preselection contracts. Some of the facilities are already in construction, with the AWTF contract scheduled for bidding in late 2003.
The Groundwater Replenishment (GWR) System is an innovative approach to keeping Orange County's groundwater basin a reliable source for meeting the region's future potable water needs. A joint program of the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD), the GWR System is an ambitious, large-scale project that will construct an advanced recycled water...
Author(s)
R. Bruce ChalmersMehul PatelWendy SevenandtDon Cutler
SourceProceedings of the Water Environment Federation
SubjectSession 51 Water Reclamation and Reuse: Groundwater Recharge and Nutrient Removal
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2003
ISSN1938-6478
SICI1938-6478(20030101)2003:7L.28;1-
DOI10.2175/193864703784641162
Volume / Issue2003 / 7
Content sourceWEFTEC
First / last page(s)28 - 53
Copyright2003
Word count522

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
R. Bruce Chalmers# Mehul Patel# Wendy Sevenandt# Don Cutler. MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 30 Jun. 2025. <https://www.accesswater.org?id=-290537CITANCHOR>.
R. Bruce Chalmers# Mehul Patel# Wendy Sevenandt# Don Cutler. MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 30, 2025. https://www.accesswater.org/?id=-290537CITANCHOR.
R. Bruce Chalmers# Mehul Patel# Wendy Sevenandt# Don Cutler
MEETING THE CHALLENGE OF PROVIDING A RELIABLE WATER SUPPLY FOR THE FUTURE, THE GROUNDWATER REPLENISHMENT SYSTEM
Access Water
Water Environment Federation
December 22, 2018
June 30, 2025
https://www.accesswater.org/?id=-290537CITANCHOR