lastID = -292447
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-04 21:42:23 Adam Phillips
  • 2022-05-04 21:42:13 Adam Phillips
  • 2020-03-26 22:13:24 Adam Phillips
  • 2020-02-01 04:35:56 Administrator
  • 2020-02-01 04:35:55 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON

SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON

SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON
Abstract
In 1992 the City of Bremerton, with a recently adopted Combined Sewer Overflow (CSO) Reduction Plan, embarked on a program to meet the State of Washington's compliance criteria of one untreated CSO event per year. The City's schedule for implementing sewer system improvements was accelerated by a Consent Decree resulting from the 1993 settlement of a citizen's group lawsuit. The City assumed that separating the combined sewer collection system would eliminate excess wet weather flows and achieve CSO reduction. In 1999, using new overflow data collected since 1994, the City recognized that its 1992 CSO Reduction Plan would not achieve the required level of reduction. As a result, the primary CSO strategy required immediate change to meet schedule requirements and avoid additional litigation. A revised CSO Reduction Plan was developed using a sewer system model that correlated measured rainfall and overflows. The City aggressively implemented the new approach, which included increased conveyance, diversion of flows to other basins, storage, CSO treatment, and separation of flows on public and private property. The hydraulic interdependency between basins also drove the schedule. By the end of 2004 the City successfully achieved reduction compliance at 10 of the 14 CSO sites and by the end of 2005 three more sites will be in compliance. The final site will be in compliance by 2007. The total estimated cost of the CSO program is 52 million.In 2003, the Washington State Department of Health (DOH) allowed shellfish harvesting in an inlet located near the City, an indication that CSO reduction activities undertaken by the City of Bremerton were successful.Developing and implementing a long-term CSO reduction plan requires accurate data. The City's 1992 CSO Reduction Plan used textbook assumptions about inflow and infiltration; when compared to actual data, these assumptions were found to not accurately represent the collection system's response to rainfall. A comprehensive and clear understanding of the entire system is also required to develop a successful plan with a schedule that can be sequentially implemented.
In 1992 the City of Bremerton, with a recently adopted Combined Sewer Overflow (CSO) Reduction Plan, embarked on a program to meet the State of Washington's compliance criteria of one untreated CSO event per year. The City's schedule for implementing sewer system improvements was accelerated by a Consent Decree resulting from the 1993 settlement of a citizen's group lawsuit. The City assumed that...
Author(s)
Eric BergstromTom Knuckey
SourceProceedings of the Water Environment Federation
SubjectSession 12: Collaboration Propels Program Support
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:4L.783;1-
DOI10.2175/193864705784291646
Volume / Issue2005 / 4
Content sourceCollection Systems Conference
First / last page(s)783 - 806
Copyright2005
Word count337

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON
Pricing
Non-member price: $11.50
Member price:
-292447
Get access
-292447
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON
Abstract
In 1992 the City of Bremerton, with a recently adopted Combined Sewer Overflow (CSO) Reduction Plan, embarked on a program to meet the State of Washington's compliance criteria of one untreated CSO event per year. The City's schedule for implementing sewer system improvements was accelerated by a Consent Decree resulting from the 1993 settlement of a citizen's group lawsuit. The City assumed that separating the combined sewer collection system would eliminate excess wet weather flows and achieve CSO reduction. In 1999, using new overflow data collected since 1994, the City recognized that its 1992 CSO Reduction Plan would not achieve the required level of reduction. As a result, the primary CSO strategy required immediate change to meet schedule requirements and avoid additional litigation. A revised CSO Reduction Plan was developed using a sewer system model that correlated measured rainfall and overflows. The City aggressively implemented the new approach, which included increased conveyance, diversion of flows to other basins, storage, CSO treatment, and separation of flows on public and private property. The hydraulic interdependency between basins also drove the schedule. By the end of 2004 the City successfully achieved reduction compliance at 10 of the 14 CSO sites and by the end of 2005 three more sites will be in compliance. The final site will be in compliance by 2007. The total estimated cost of the CSO program is 52 million.In 2003, the Washington State Department of Health (DOH) allowed shellfish harvesting in an inlet located near the City, an indication that CSO reduction activities undertaken by the City of Bremerton were successful.Developing and implementing a long-term CSO reduction plan requires accurate data. The City's 1992 CSO Reduction Plan used textbook assumptions about inflow and infiltration; when compared to actual data, these assumptions were found to not accurately represent the collection system's response to rainfall. A comprehensive and clear understanding of the entire system is also required to develop a successful plan with a schedule that can be sequentially implemented.
In 1992 the City of Bremerton, with a recently adopted Combined Sewer Overflow (CSO) Reduction Plan, embarked on a program to meet the State of Washington's compliance criteria of one untreated CSO event per year. The City's schedule for implementing sewer system improvements was accelerated by a Consent Decree resulting from the 1993 settlement of a citizen's group lawsuit. The City assumed that...
Author(s)
Eric BergstromTom Knuckey
SourceProceedings of the Water Environment Federation
SubjectSession 12: Collaboration Propels Program Support
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2005
ISSN1938-6478
SICI1938-6478(20050101)2005:4L.783;1-
DOI10.2175/193864705784291646
Volume / Issue2005 / 4
Content sourceCollection Systems Conference
First / last page(s)783 - 806
Copyright2005
Word count337

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
Eric Bergstrom# Tom Knuckey. SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 7 Jun. 2025. <https://www.accesswater.org?id=-292447CITANCHOR>.
Eric Bergstrom# Tom Knuckey. SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 7, 2025. https://www.accesswater.org/?id=-292447CITANCHOR.
Eric Bergstrom# Tom Knuckey
SUCCESSFULLY ACHIEVING CSO REDUCTION COMPLIANCE IN BREMERTON, WASHINGTON
Access Water
Water Environment Federation
December 22, 2018
June 7, 2025
https://www.accesswater.org/?id=-292447CITANCHOR