lastID = -293460
Skip to main content Skip to top navigation Skip to site search
Top of page
  • My citations options
    Web Back (from Web)
    Chicago Back (from Chicago)
    MLA Back (from MLA)
Close action menu

You need to login to use this feature.

Please wait a moment…
Please wait while we update your results...
Please wait a moment...
Description: Access Water
Context Menu
Description: Book cover
Maximizing Operational Capacity for Outfall Sewers Through Innovative Design
  • Browse
  • Compilations
    • Compilations list
  • Subscriptions
Tools

Related contents

Loading related content

Workflow

No linked records yet

X
  • Current: 2022-05-06 11:38:46 Adam Phillips
  • 2022-05-06 11:38:45 Adam Phillips
  • 2020-02-01 01:19:50 Administrator
  • 2020-02-01 01:19:49 Administrator
Description: Access Water
  • Browse
  • Compilations
  • Subscriptions
Log in
0
Accessibility Options

Base text size -

This is a sample piece of body text
Larger
Smaller
  • Shopping basket (0)
  • Accessibility options
  • Return to previous
Description: Book cover
Maximizing Operational Capacity for Outfall Sewers Through Innovative Design

Maximizing Operational Capacity for Outfall Sewers Through Innovative Design

Maximizing Operational Capacity for Outfall Sewers Through Innovative Design

  • New
  • View
  • Details
  • Reader
  • Default
  • Share
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • New
  • View
  • Default view
  • Reader view
  • Data view
  • Details

This page cannot be printed from here

Please use the dedicated print option from the 'view' drop down menu located in the blue ribbon in the top, right section of the publication.

screenshot of print menu option

Description: Book cover
Maximizing Operational Capacity for Outfall Sewers Through Innovative Design
Abstract
The City of Lincoln, Nebraska has undertaken a strategy to accelerate development of infrastructure systems for critical areas of the community, with the goal of nearly doubling the development rate for those areas. The Little Salt Creek drainage basin is a growing service area which includes over 3,000 acres of developed land and ultimately 5,300 acres in all. The majority of the existing and future service area drains to a lift station that pumps under Salt Creek through an inverted 24 inch force main and outfalls into a 24 inch gravity sewer. The lift station is configured to expand to match future increased flows through installation of additional pumps.Several capacity-related problems exist with the current collection system downstream from the lift station;The 24 inch sewer that receives flow from the force main is undersized for receiving future (and present peak) flows.To avoid surcharging and overflowing of the existing gravity sewer, only one lift station pump can be operated at a time.Because only one pump can be operated, the system capacity is limited to approximately 7.8 cfs (5.0 mgd). Furthermore, sewage velocities within the 24 inch inverted force main are less than 2 feet per second making grit and solids deposition a concern.For the Lincoln Wastewater System (LWWS), the most critical need is to upgrade the lift station outfall sewer system to prevent overflows now and into the immediate future. A secondary need is to provide a system concept that maximizes the outfall's near-term capacity and allows development to full build-out capacity without major additional investment in existing trunk sewer infrastructure. This secondary goal requires a development strategy that accommodates a wide range of flows, from the current effective capacity of 7.8 cfs (5.0 mgd) to a future build-out of 32.4 cfs (20.0 mgd). Original concepts had assumed that this project would need to be followed by a similar project later once flows further increased.An innovative design for the project was proposed to LWWS to construct what has been termed a “gravi-force” main to achieve the full range of capacity with a single cost-effective project. The “gravi-force” concept optimizes construction costs by constructing a gravity sewer system sized for near-term capacity needs that can be pressurized in the future to achieve build-out capacity when operated in “force main” mode. Furthermore, this concept integrates with the existing 24 inch diameter sewer for optimum flexibility and responsible utilization of the city's existing infrastructure assets for the long-term. Another element of the project is the proposed construction of a second force main under Salt Creek to facilitate cleaning of the twin main when necessary (initially only one main would be in service at a given time), and to ultimately be in service in parallel, and simultaneously with the 24 inch force main at build-out high flow rates.In summary, instead of constructing a parallel gravity sewer or force main now, followed by a third in the future (within an increasingly congested area and at inflated cost), the “gravi-force” main project solution accomplishes the same effective result with only a single project constructed now and ultimately at a substantially lower life cycle cost.
The City of Lincoln, Nebraska has undertaken a strategy to accelerate development of infrastructure systems for critical areas of the community, with the goal of nearly doubling the development rate for those areas. The Little Salt Creek drainage basin is a growing service area which includes over 3,000 acres of developed land and ultimately 5,300 acres in all. The majority of the existing and...
Author(s)
M. Kent PriorScott AuritBrian Kramer
SourceProceedings of the Water Environment Federation
SubjectSession 70: Collection Systems: Infrastructure Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2006
ISSN1938-6478
SICI1938-6478(20060101)2006:7L.5442;1-
DOI10.2175/193864706783763273
Volume / Issue2006 / 7
Content sourceWEFTEC
First / last page(s)5442 - 5466
Copyright2006
Word count531

Purchase price $11.50

Get access
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Maximizing Operational Capacity for Outfall Sewers Through Innovative Design'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: Book cover
Maximizing Operational Capacity for Outfall Sewers Through Innovative Design
Pricing
Non-member price: $11.50
Member price:
-293460
Get access
-293460
Log in Purchase content Purchase subscription
You may already have access to this content if you have previously purchased this content or have a subscription.
Need to create an account?

You can purchase access to this content but you might want to consider a subscription for a wide variety of items at a substantial discount!

Purchase access to 'Maximizing Operational Capacity for Outfall Sewers Through Innovative Design'

Add to cart
Purchase a subscription to gain access to 18,000+ Proceeding Papers, 25+ Fact Sheets, 20+ Technical Reports, 50+ magazine articles and select Technical Publications' chapters.

Details

Description: Book cover
Maximizing Operational Capacity for Outfall Sewers Through Innovative Design
Abstract
The City of Lincoln, Nebraska has undertaken a strategy to accelerate development of infrastructure systems for critical areas of the community, with the goal of nearly doubling the development rate for those areas. The Little Salt Creek drainage basin is a growing service area which includes over 3,000 acres of developed land and ultimately 5,300 acres in all. The majority of the existing and future service area drains to a lift station that pumps under Salt Creek through an inverted 24 inch force main and outfalls into a 24 inch gravity sewer. The lift station is configured to expand to match future increased flows through installation of additional pumps.Several capacity-related problems exist with the current collection system downstream from the lift station;The 24 inch sewer that receives flow from the force main is undersized for receiving future (and present peak) flows.To avoid surcharging and overflowing of the existing gravity sewer, only one lift station pump can be operated at a time.Because only one pump can be operated, the system capacity is limited to approximately 7.8 cfs (5.0 mgd). Furthermore, sewage velocities within the 24 inch inverted force main are less than 2 feet per second making grit and solids deposition a concern.For the Lincoln Wastewater System (LWWS), the most critical need is to upgrade the lift station outfall sewer system to prevent overflows now and into the immediate future. A secondary need is to provide a system concept that maximizes the outfall's near-term capacity and allows development to full build-out capacity without major additional investment in existing trunk sewer infrastructure. This secondary goal requires a development strategy that accommodates a wide range of flows, from the current effective capacity of 7.8 cfs (5.0 mgd) to a future build-out of 32.4 cfs (20.0 mgd). Original concepts had assumed that this project would need to be followed by a similar project later once flows further increased.An innovative design for the project was proposed to LWWS to construct what has been termed a “gravi-force” main to achieve the full range of capacity with a single cost-effective project. The “gravi-force” concept optimizes construction costs by constructing a gravity sewer system sized for near-term capacity needs that can be pressurized in the future to achieve build-out capacity when operated in “force main” mode. Furthermore, this concept integrates with the existing 24 inch diameter sewer for optimum flexibility and responsible utilization of the city's existing infrastructure assets for the long-term. Another element of the project is the proposed construction of a second force main under Salt Creek to facilitate cleaning of the twin main when necessary (initially only one main would be in service at a given time), and to ultimately be in service in parallel, and simultaneously with the 24 inch force main at build-out high flow rates.In summary, instead of constructing a parallel gravity sewer or force main now, followed by a third in the future (within an increasingly congested area and at inflated cost), the “gravi-force” main project solution accomplishes the same effective result with only a single project constructed now and ultimately at a substantially lower life cycle cost.
The City of Lincoln, Nebraska has undertaken a strategy to accelerate development of infrastructure systems for critical areas of the community, with the goal of nearly doubling the development rate for those areas. The Little Salt Creek drainage basin is a growing service area which includes over 3,000 acres of developed land and ultimately 5,300 acres in all. The majority of the existing and...
Author(s)
M. Kent PriorScott AuritBrian Kramer
SourceProceedings of the Water Environment Federation
SubjectSession 70: Collection Systems: Infrastructure Management
Document typeConference Paper
PublisherWater Environment Federation
Print publication date Jan, 2006
ISSN1938-6478
SICI1938-6478(20060101)2006:7L.5442;1-
DOI10.2175/193864706783763273
Volume / Issue2006 / 7
Content sourceWEFTEC
First / last page(s)5442 - 5466
Copyright2006
Word count531

Actions, changes & tasks

Outstanding Actions

Add action for paragraph

Current Changes

Add signficant change

Current Tasks

Add risk task

Connect with us

Follow us on Facebook
Follow us on Twitter
Connect to us on LinkedIn
Subscribe on YouTube
Powered by Librios Ltd
Powered by Librios Ltd
Authors
Terms of Use
Policies
Help
Accessibility
Contact us
Copyright © 2024 by the Water Environment Federation
Loading items
There are no items to display at the moment.
Something went wrong trying to load these items.
Description: WWTF Digital Boot 180x150
WWTF Digital (180x150)
Created on Jul 02
Websitehttps:/­/­www.wef.org/­wwtf?utm_medium=WWTF&utm_source=AccessWater&utm_campaign=WWTF
180x150
M. Kent Prior# Scott Aurit# Brian Kramer. Maximizing Operational Capacity for Outfall Sewers Through Innovative Design. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Web. 6 Jun. 2025. <https://www.accesswater.org?id=-293460CITANCHOR>.
M. Kent Prior# Scott Aurit# Brian Kramer. Maximizing Operational Capacity for Outfall Sewers Through Innovative Design. Alexandria, VA 22314-1994, USA: Water Environment Federation, 2018. Accessed June 6, 2025. https://www.accesswater.org/?id=-293460CITANCHOR.
M. Kent Prior# Scott Aurit# Brian Kramer
Maximizing Operational Capacity for Outfall Sewers Through Innovative Design
Access Water
Water Environment Federation
December 22, 2018
June 6, 2025
https://www.accesswater.org/?id=-293460CITANCHOR